MINUTES ‘TOWNSHIP OF WEST ORANGE ZONING BOARD OF ADJUSTMENT SPECIAL MEETING February 7, 2013 The West Orange Zoning Board of Adjustment held a special meeting on February 7, 2013 commencing 8:00 PM at 66 Main Street, West Orange, N.J. in Council Chambers. Chairman Neuer called the meeting to order at approximately 8:00 P.M. It was announced that notification of this meeting was given to the Township Clerk, the West Orange Chronicle, and posted on the Township Bulletin Board on January 24, 2013 in accordance with the “Open Public Meetings Act.” Chairman Neuer asked everyone to stand for the Pledge of Allegiance Alice Beirne, Esq., Board Attorney, read the Opening Statement. PRESENT: ABSENT: ALSO PRESENT: ANNOUNCEMENTS Future Meetings: G. Bullock (8:06 pm), D. Gabry, W. Merklinger, P. Neuer, B. Quentzel (8:04 pm), W. Steinhart, M. Sussman, A. Weiss B. Buechler (recused) L. Zaolino (excused absence) P. Grygiel, Consulting Planner/Acting Planning Director Board Attorney, Alice Beirne, Esq. Board Secretary, Rose DeSena Harvey Grossman, Public Advocate February 21, 2013 (Regular Meeting) - 8:00 PM March 7, 2013 (Special Meeting) — 8:00 PM March 21, 2013 (Regular Meeting) - 8:00 PM April 18, 2013 (Regular Meeting) — 8:00 PM Chairman Neuer made reference to a letter to the Editor, which was written by a Township resident Mary Ellen Morrow, in the West Orange Chronicle. He stated that the article contained many kind words concerning the Zoning Board of Adjustment.

Page 2

MINUTES Adopt Minutes: January 10, 2013 (Special Meeting) Ms. Gabry made a motion to approve the minutes; Mr. Steinhart seconded the motion. All were in favor to approve the minutes of the special meeting held on January 10, 2013. Adopt Minutes: January 17, 2013 (Regular Meeting) Mr. Sussman made a motion to approve the minutes; Ms. Gabry seconded the motion. All were in favor to approve the minutes of the regular meeting held on January 17, 2013. SWEARING IN Consulting Planner for the Township, Paul Grygiel was sworn under oath. APPLICATION 1. ZB-12-18/T-Mobile Northeast, LLC & Carried from 12/20/12 New Cingular Wireless Block: 155; Lot: 40.01; Zone: B-2 8 Rooney Circle Seeking site plan approval and three (3) “D” variances for establishing a temporary wireless communication facility. EXHIBITS A-1 - Owners consent to temporary variance from Price Meese Law Firm dated 2/5/13 A-2 - Site Plan Set - eight sheets with a revision date of 10/19/12 A-3 - Existing and Proposed Coverage locations for T-Mobile — three sheets A-4 - Existing and Proposed Coverage locations for AT&T — four sheets A-5 - Planners Report prepared by Timothy M. Kronk, PP, AICP A-6 - Aerial Photograph A-7 - Existing & Proposed Photo from Rooney Circle and Entrance to the Marriott Courtyard A-8 - Existing & Proposed Photo from Route 280 W on-ramp A-9 - Existing & Proposed Photo from Prospect Avenue Bridge over Route 280 A-10 - Existing & Proposed Photo from Rooney circle near Shop Rite

Page 3

DISCUSSION Gregory Meese, Esq., attorney for T-Mobile, approached the podium. Mr. Meese stated that the co-applicants, T-Mobile and AT&T, are seeking site plan approval for a temporary wireless communication facility. He stated that this facility will replace a previously approved existing facility that had to be taken off the air due to PSE&G upgrading their towers. Mr. Meese said that until the tower replacement project is completed, both carriers must temporarily relocate their antennas that were mounted on the existing PSE&G electric transmission towers located near Rooney Circle and Marion Drive. He said that the tower replacement project will take approximately two years. Chairman Neuer thanked Mr. Meese for responding quickly to Ms. Beirne’s letter requesting submission of a legal memorandum stating that the Zoning Board may limit the approval of a variance to certain duration. The Chairman stated that Mr. Meese submitted an affidavit signed in Richmond Virginia by Dave Budley stating that the property owner understands that the site is temporary and they will not have the vested right to use the flag pole for antennas once the temporary antennas have been removed by these applicants. The duration of the variance shall not exceed the two years applied for by these applicants. Chairman Neuer asked to have the letter from Price Meese and the owner’s consent to temporary variance marked as Exhibit A-1 and entered into evidence. Mr. Meese stated that the applicants are proposing to attach their antennas to a 123’ tall flag pole which will be removed upon restoration of the PSE&G tower location. He said that the use variance is being requested for the temporary duration. Mr. Sussman asked Mr. Meese if the fence they are proposing will also be removed; Mr. Meese replied yes. Chairman Neuer asked Mr. Meese how the flag will be illuminated; Mr, Meese said that their Engineer will explain that. Mr. Meese stated that he spoke to the Township Engineer, Lenny Lepore, about making the flag pole permanent. Chairman Neuer said that the applicants are here before the Board tonight requesting a temporary variance only. He said that they could come back before this Board if they wish to make it permanent. Ms. Weiss asked Mr. Meese if he had any colored photos of the flag pole; Mr. Meese replied yes. Ms. Weiss asked Mr. Meese if there is as sample piece of the

Page 3

Board if they wish to make it permanent. Ms. Weiss asked Mr. Meese if he had any colored photos of the flag pole; Mr. Meese replied yes. Ms. Weiss asked Mr. Meese if there is as sample piece of the flag pole; Mr. Meese replied no. He said that the pole is made of metal and is a regular flag pole. Mr. Meese called his first witness. Joshua R. Cottrell approached the podium and was sworm under oath. Mr. Cottrell detailed his educational and professional background stating that he was a licensed professional Engineer in the State of New Jersey. He also said that he has testified many times before other Boards for

Page 4

applications of similar scope. Chairman Neuer accepted Mr. Cottrell as an expert in the field of Engineering. Mr. Cottrell presented plans that were submitted with the application. Chairman Neuer asked to have the entire set of plans consisting of eight sheets with the revision date of 10/19/12 marked as Exhibit A-2 for identification. Mr. Cottrell referred to sheet SP-2 of the plans and detailed the enlarged area where the flag pole and antennas will be located. He stated that AT&T will have six (6) antennas and T-Mobile will have six (6) antennas for a total of 12 antennas. Mr. Cottrell referred to sheet SP-3 stating that the cables will not be visible from the exterior and explained that the antennas will be mounted within the flag pole and will likewise not be visible. He also detailed where the equipment cabinets will be placed on the plans. Chairman Neuer asked Mr. Cottrell who drew the plans; Mr. Cottrell stated that the plans were prepared by members of his firm. Mr. Cottrell stated that telephone and electric are the only utilities required at the site. He said that they are not proposing to install a generator because there is an internal battery that is used to backup the power, Mr. Cottrell stated that a technician visits the site every two to six weeks. He also said that no additional parking is being proposed. Chairman Neuer referred to the temporary 6°2” fence that they are proposing at the site. He asked Mr. Meese if the applicant wanted to amend the application requesting the additional variance for this fence. Mr. Meese said yes and asked to amend the application requesting a variance for the height of the temporary fence. The amendment was accepted. Mr. Quentzel asked Mr. Cottrell how they would prevent the flag pole from coming down during a hurricane. Mr. Cottrell said that 85 mph wind gust factors are built in during the calculations. He said that these calculations will be submitted when they apply for the permits because the Engineering Department requires that. Mr. Bullock asked Mr, Cottrell how this flag pole is similar to the existing flag pole in town which houses antennas; Mr. Cottrell said he did not know because he never saw that flag pole. Ms. Gabry asked Mr. Cottrell to explain how they install the antennas within the flag pole; Mr. Cottrell said they move the fiberglass panels and place the antenna inside the

Page 4

ever saw that flag pole. Ms. Gabry asked Mr. Cottrell to explain how they install the antennas within the flag pole; Mr. Cottrell said they move the fiberglass panels and place the antenna inside the pole. In response to a question by Mr. Sussman the witness stated that the lower 80° of the pole is galvanized steel and the remainder of the pole is made of fiberglass with the antennas inside of this section of the pole. Mr. Bullock asked Mr. Cottrell what color the pole will be; Mr. Cottrell said it will be painted white.

Page 5

There were no further questions for Mr. Cottrell from the Board. Chairman Neuer asked if any members of the public had any questions for Mr. Cottrell; seeing none he asked Mr. Meese to call his next witness. Mr. Meese called the Radio Frequency Engineer testifying for T-Mobile. Joseph Menio approached the podium and was sworn under oath. Mr. Menio detailed his educational and professional background, stating that he is an expert in Radio Frequency Engineering in the State of New Jersey and New York and that he has testified many times before Boards. Chairman Neuer asked Mr. Menio if he is licensed; Mr. Menio stated that he is licensed by the FCC but there is no certification in New Jersey for Radio Frequency Engineering. Chairman Neuer accepted Mr. Menio as an expert in the field of Radio Frequency Engineering. Mr. Menio presented a map of T-Mobiles existing and proposed coverage facilities. Chairman Neuer asked to have the entire set, consisting of three sheets, of the existing and proposed coverage facilities marked as Exhibit A-3 for identification. Mr. Menio detailed the first sheet showing the coverage that T-Mobile had at the old site. He then referred to the second sheet showing gaps that opened up on Route 280 and Prospect Avenue after those antennas had been decommissioned. Mr. Menio then referred to sheet three showing all the gaps being filled in with the proposed temporary facility. Mr. Sussman asked Mr. Menio if coverage would be better, long term, if they left the antennas at the temporary site or relocated back on the PSE&G tower; Mr. Menio said there would be equal coverage. ‘There were no further questions for Mr. Menio from the Board. Chairman Neuer asked if any members of the public had any questions for Mr. Menio; seeing none he asked Mr. Meese to cali his next witness. Mr. Meese called the Radio Frequency Engineer testifying for AT&T. ven Joseph approached the podium and was sworn under oath. Mr. Joseph detailed his educational and professional background stating that he designs radio frequency networks. He said that he has testified before Boards in New Jersey, New York and Connecticut and is licensed by the FCC. Chairman Neuer accepted Mr. Joseph as an expert in the field of Radio Frequency Engineering. Mr. Joseph presented a base drawing with three clear overlays of AT&T’s existing and proposed coverage facilities. Chairman

Page 5

cepted Mr. Joseph as an expert in the field of Radio Frequency Engineering. Mr. Joseph presented a base drawing with three clear overlays of AT&T’s existing and proposed coverage facilities. Chairman Neuer asked to have the set of AT&T’s existing and proposed coverage facilities marked as Exhibit A-4 for identification. Mr. Joseph detailed the USGS base map showing the existing site and the proposed site. He presented the first overlay which showed the existing coverage prior to the site being displaced. Mr. Joseph said that they had reliable service. He presented the second overlay that showed the gaps in coverage without the facility being online. Mr. Joseph then presented the third overlay showing the gaps being filled in from the proposed site at the Marriott.

Page 6

Mr. Sussman asked Mr. Joseph if the proposed location is preferable or if the old location is preferable. Mr. Joseph said that AT&T would prefer to remain at the proposed location because the site is closer to Route 280 and will have better coverage. He said that the proposed site will also be easier to maintain. There were no further questions for Mr. Joseph from the Board. Chairman Neuer asked if any members of the public had any questions for Mr. Joseph; seeing none he asked Mr. Meese to call his next witness. Mr. Meese called his next witness. Dan Collins approached the podium and was sworn under oath. Mr. Collins stated that he is an FCC compliance expert, has an electrical degree and has testified before this Zoning Board before. Chairman Neuer accepted his credentials as an FCC compliance expert. Mr. Collins said that the radio frequency levels are below what is permitted. There were no further questions for Mr. Collins from the Board. Chairman Neuer asked if any members of the public had any questions for Mr. Collins; seeing none he asked Mr. Meese to call his next witness. Timothy Kronk approached the podium and was sworn under oath. Mr. Kronk detailed his educational and professional background as a Professional Planner licensed in the State of New Jersey, Chairman Neuer accepted Mr. Kronk as an expert in the field of Professional Planning. Chairman Neuer referred to the planning report, dated 8/22/12, that was submitted with the application and asked Mr. Kronk if he prepared it; Mr. Kronk replied yes, Chairman Neuer asked Mr. Kronk if he was to ask him to read the report would it constitute his testimony this evening; Mr. Kronk replied yes. Chairman Neuer asked Mr. Kronk to sign the planners report dated 8/22/12 and asked to have it marked as Exhibit A-5 for identification. Mr. Kronk presented an aerial photograph of the site. Chairman Neuer asked to have the aerial photograph of the site marked as Exhibit A-6 for identification. Mr. Kronk detailed the aerial photograph showing the proposed site at the Marriott Hotel, Route 280 and Prospect Avenue. Mr. Kronk presented four (4) photo boards that showed what is current and what is being proposed and began detailing them. He said that they performed a balloon test at 123’ for the proposed photo and also took photographs. Chairman Neuer asked to have the photo board showing the current and

Page 6

osed and began detailing them. He said that they performed a balloon test at 123’ for the proposed photo and also took photographs. Chairman Neuer asked to have the photo board showing the current and proposed view from the intersection of Rooney Circle & the entrance to the Marriott Courtyard marked as Exhibit A-7 for identification; the photo board showing the current and proposed view from Route 280 West at the Prospect Ave. On-Ramp marked as Exhibit A-8 for identification; the photo board showing the current and proposed view from Prospect Avenue looking southwest marked as Exhibit A-9 for identification and the photo board