Minutes · Sep 12, 2013
September 12, 2013
5533f2968e56413a25f269e4acf24b26390370725c1e0c842719dc07393cef5eIndexed text
MINUTES ‘TOWNSHIP OF WEST ORANGE ZONING BOARD OF ADJUSTMENT REGULAR MEETING September 12, 2013 The West Orange Zoning Board of Adjustment held a regular meeting on September 12, 2013 commencing 8:00 PM at 66 Main Street, West Orange, N.J. in Council Chambers. Chairwoman Gabry called the meeting to order at approximately 8:00 P.M. It was announced that notification of this meeting was given to the Township Clerk, the West Orange Chronicle, and posted on the Township Bulletin Board on November 21, 2012 in accordance with the “Qpen Public Meetings Act.” Chairwoman Gabry asked everyone to stand for the Pledge of Allegiance Alice Beirne, Esq., Board Attorney, read the Opening Statement. PRESENT: B. Buechler, G, Bullock, D. Gabry, P. Neuer, B. Quentzel, W. Steinhart, M. Sussman, A. Weiss ABSENT: W. Merklinger ALSO PRESENT: Paul Grygiel, Consulting Planner F. Russo, Consulting Engineer Board Attorney, Alice Beirne, Esq. Board Secretary, Rose DeSena D. Dillon, Audio-Digital Transcription Service ANNOUNCEMENES Future Meetings: October 17, 2013 (Regular Meeting) — 8:00 PM November 21, 2013 (Regular Meeting) — 8:00 PM December 19, 2013 (Regular Meeting) - 8:00 PM MINUTES Adopt Minutes: August 15, 2013 (Regular Meeting) Mr. Buechler made a motion to approve the minutes as submitted to the Board Members; Mr. Neuer seconded the motion. All were in favor to approve the minutes of the regular meeting held on August 15, 2013,
SWEARINGIN Consulting Engineer, Frank Russo and Consulting Planner for the Township, Paul Grygiel were sworn under oath, APPLICATIONS 1. ZB-13-05/Nicolas . Carried from 8/15/13 8 Pen Bryn Road Block: 148.03; Lot: 13; Zone: R-6 “C’ variances for side yard set-backs for installing a deck Naomie Nicolas and Roberto A. Milten approached the podium. Ms. Nicolas stated that she is the applicant and is proposing to build a deck that requires a variance for the side yard set-backs. Mr. Neuer said that the application stated that they were building a deck as is but said that he saw anew deck on the plans. He asked Ms. Nicolas if the original deck was removed. Ms. Nicolas stated that the original upper deck was destroyed during a storm and that they were replacing it on the existing foundation. She said that they are proposing to build a lower deck with a spa enclosed within it. Mr. Buechler asked the applicant to explain the two tier stairs shown on the plans. Mr. Milten stated that the stairs on the upper deck collapsed and were replaced. He said that they will also be replacing the existing steps leading to the grass area below. Mr. Buechler asked if they received any comments from their neighbors regarding the deck; Mr. Milten replied no. He said that some of the neighbors are anticipating using the spa. Mr. Buechler asked Mr. Miiten if he is a licensed Professional Planner; Mr. Milten replied no. Mr. Buechler said that he is listed on the application as the Planner and asked for clarification. Mr, Milten stated that Ms. Nicolas is his fiancée and they own the home together and he will be doing the construction work himself. Mr. Buechler asked Mr. Milten if he is a licensed contractor; Mr, Milten replied no, Mr. Neuer asked Mr. Milten if the architect drew the deck plans; Mr. Milten replied yes. Mr. Neuer asked Mr. Milten if the architect will inspect the deck; Mr. Milten replied yes. Ms. Nicolas stated that the architect, who prepared the plans, told them that he would oversee the project and inspect the deck periodically. She said that the architect said that the Town will be inspecting the deck also. Mr. Milten said that they will do whatever the Town requires them to do. Mr. Neuer said that his concern is that Mr. Milten is not a licensed contractor and feels that a licensed contractor should do the work.
Chairwoman Gabry asked Mr. Milten why the deck has to be so big. Mr. Milten said that he wanted the lower deck to be flush with the existing upper deck. He said they also wanted more area on the deck for their daughter to play because the spa took away some of the deck area. Chairwoman Gabry stated for the record that the applicant started building the lower deck without the proper permits from the Township. Mr. Milten said that the problem was with the lower deck only; he said the upper deck was already there. Mr. Bullock asked Mr. Milten if they have the permits now; Mr. Buechler said that the Township will not issue any permits until the application is approved. Chairwoman Gabry noted for the record that Ms. Weiss stepped up on the dais at 8:18 pm and will not be voting on this application. Chairwoman Gabry asked Mr. Milten if he poured the concrete himself, Mr. Milten said no. He said that his uncle poured the concrete. Chairwoman Gabry asked Mr. Milten if his uncle is a licensed contractor in the State of New Jersey; Mr. Milten replied no. He said that he is a licensed contractor in the State of New York. Chairwoman Gabry noted for the record that the block number for this property was incorrect on the application. The application listed the property as Block {48.03 and the Board Secretary corrected it to Block 148.08. There were no further questions for Ms. Nicolas and Mr. Milten from the Board or the Professionals. Mr. Buechler asked if anyone was here for public comment; secing none Chairwoman Gabry declared the hearing closed and asked if any of the Board members had any comments. Mr. Bullock stated that his concern is that Mr. Milten is not a licensed contractor and that they are installing a spa. He asked Mr. Milten if they are hiring a licensed plumber and licensed electrician to install the spa; Mr. Milten replied yes. Mr. Bullock suggested that the Board make this a condition. Mr. Neuer said that this is not necessary because the Township’s Building Department will not issue any permits unless the plumber and electrician are licensed. Mr. Buechler said that he would like to see the architect come out two or three times during construction to oversee the project. Mr. Neuer stated that he is not thrilled that the applicants began building the deck without the proper permits. He said that it is always better to ask for forgiveness
uction to oversee the project. Mr. Neuer stated that he is not thrilled that the applicants began building the deck without the proper permits. He said that it is always better to ask for forgiveness instead of permission. Mr. Neuer said that he supports members of this Community who want to make improvements to their property and that he will recommend approval of this application.
Chairwoman Gabry said that she is not crazy about this application because the deck is too big but agrees with Mr. Neuer. She advised the applicants to come before the Board first next time and asked for a motion to approve the application. Mr. Buechler moved to approve this application, subject to the condition that the applicant has the architect or another licensed architect inspect the structure as least two times during construction. He also recommended that the applicant submit a letter to the Board Secretary, from the architect, stating that he inspected it. Mr. Neuer seconded the motion to approve the application. The vote was as follows: Buechler: Yes Steinhart: Yes Bullock: Yes Sussman: Yes Merklinger: - Weiss: - Neuer: Yes Chairwoman Gabry: Yes Quentzel: Yes 3. 2ZB-13-03/Prism Green Assoc. HI, LLC Carried from 8/15/13 Block: 155; Lot: 26.03; Zone: O-R Rooney Circle “D” use variance and “C” variances to construct a fitness center. EXHIBITS A-1 - Aerial Map A-2 — Site Plan Rendering — Sheet 5 A-3 -- Architectural Plans dated 3/26/13 A-4 — Colored Rendering A-5 — Landscape Plan dated 3/15/13 Chairwoman Gabry noted for the record that Mr. Steinhart and Mr. Neuer were recused from. hearing this application and left the dais. Francis X. Regan, Esq., attorney for the applicant, approached the podium and began detailing the application. Mr. Regan stated that the applicant is proposing to construct a 48,000 sq. ft. fitness center/health club on Rooney Circle. He said that the applicant is requesting a “D” variance because the use is not permitted on this property. Mr. Regan said that this application also requires the approval of several “C” variances for setbacks, lot coverage, parking and signage. He said that he has six witnesses that will testify and four of the witnesses are here tonight. Mr. Regan called his first witness.
Eugene Robert Diaz approached the podium and was sworn under oath. Mr. Diaz detailed the background of the property stating that the two lots were sub-divided approximately two and a half years ago. Mr. Buechler asked Mr. Diaz what his relationship is to Prism Green Associates; Mr. Diaz stated that he is a part owner. Mr. Diaz stated that there was a deed restriction for this property, when it was sub-divided, and it can only be used for retail. He said that building an office building at this location, due to the present market, is unlikely so retail is not an option. Mr. Diaz stated that the fitness center being proposed does not fall under the restricted use in this zone and they ended up with a lease for an L.A. Fitness Center. He gave some background about the company stating that L.A. Fitness own over 400 health clubs and it is a financially healthy business. Mr. Diaz described the lot and noted that there is a small 10 ft. strip of land that they do not own. He said that they have an easement and a landscape easement for this 10 ft. strip. Mr. Buechler asked Mr. Diaz how long construction will take; Mr. Diaz said approximately ten months. Mr. Buechler asked Mr. Diaz when construction would start; Mr. Diaz said that, subject to approvals, by the fourth quarter of 2014. Mr. Regan asked Mr. Diaz if the hours of operation will comply with the Township Ordinance; Mr. Diaz replied yes. Mr. Regan asked Mr. Diaz how many employees there will be; Mr. Diaz stated that the maximum number of employees, onsite at one time, will be 20-25 employees. Mr. Buechler asked Mr. Diaz if there will be a food facility in the building. Mr. Diaz stated that they will have protein shakes for the members’ consumption only. Mr. Diaz stated that there will be a day care facility, onsite, with licensed people to baby sit for the members’ children, Mr, Buechler asked Mr. Diaz if they will need a license for the day care facility; Mr. Diaz said that L.A. Fitness will be responsible for that. There were no further questions for Mr. Diaz from the Board of the Professionals. Chairwoman Gabry asked if any members of the public had any questions for Mr. Diaz; seeing none Mr. Diaz was excused. Mr. Regan called his next witness. Joseph Sparone approached the podium and was sworn under oath. Mr. Sparone detailed his educational and professional background as a licensed
Mr. Diaz was excused. Mr. Regan called his next witness. Joseph Sparone approached the podium and was sworn under oath. Mr. Sparone detailed his educational and professional background as a licensed Professional Engineer in the State of New Jersey. He said that he has worked on projects similar to this one before. Chairwoman Gabry accepted Mr. Sparone as an expert in Professional Engineering.
Mr. Sparone stated that the site plans were signed by Joseph Staigar and that he worked with Mr. Staigar on the plans. Mr. Buechler questioned if Mr. Sparone could testify because his company did not sign and seal the plans and is just a member of the firm. Mr. Sparone stated that his company partnered with Mr. Staigar on the plans and the plans were prepared in his office. Mr. Buechler asked Mr. Sparone if his company would be willing to sign and seal these plans too; Mr. Sparone replied yes. Mr. Buechler stated that, before the Board approves this application, the plans will be signed and sealed by Mr. Sparone. Ms. Beirne stated that Mr. Staigar has always testified as a Traffic Engineer. Mr. Regan said that Mr. Staigar is also a licensed Professional Engineer and that they will talk to him to work this out. Ms. Beirne stated that she wants Mr. Staigar to read Mr. Sparone’s testimony and agree with it. Mr. Sussman wanted clarification and asked Mr. Sparone if the site plans referenced him or his company; Mr. Sparone replied no. Mr. Regan noted for the record that there were six (6) Board members present at the meeting tonight and requested a copy of the transcripts for a seventh Board member. He asked if the Board would also accommodate the applicant with a special meeting. Chairwoman Gabry said that the Board will discuss that later. Mr. Sparone presented an aerial map photo. Chairwoman Gabry asked to have the aerial map matked as Exhibit A-I for identification. Mr. Sparone referred to the aerial map and detailed the surrounding properties. Mr. Buechler asked Mr. Sparone where the fitness center will go; Mr. Sparone indicated on the aerial map the location of the fitness center. Chairwoman Gabry asked Mr. Sparone how tall the adjacent property building is; Mr. Sparone said that he was not sure how tall it was and stated that it is four stories. Mr. Russo asked Mr. Sparone how much frontage there is; Mr. Sparone said that there is zero feet of frontage. Mr. Sparone presented a rendering of the site plan. Chairwoman Gabry asked to have Sheet 5 of the rendering site plan marked as Exhibit A-2 for identification. Mr. Buechler asked Mr. Sparone what the distance is between the fitness center and the adjacent office building; Mr. Sparone replied 308 feet. Mr. Sparone began detailing the first and second floors of the two story building. He also
t the distance is between the fitness center and the adjacent office building; Mr. Sparone replied 308 feet. Mr. Sparone began detailing the first and second floors of the two story building. He also noted the new parking area on the plan and the proposed landscaping. Mr. Bucchler asked Mr. Sparone if they were proposing covered parking; Mr. Sparone replied yes. Chairwoman Gabry asked Mr. Sparone to detail the number of parking spaces. Mr. Sparone said that the fitness center will provide £99 parking spaces which include the parking spaces under 6
the building. He said that there are a total of 179 parking spaces for the adjacent office building. Mr. Buechler asked Mr. Sparone if it will be one continuous parking lot, Mr. Sparone replied yes. Mr. Diaz approached the podium and explained that there is a cross easement for access to both properties, from the driveway, that was approved in the subdivision application. Mr. Sparone stated that they are proposing two stories on the building and the Township ordinance allows two and one half stories. Mr. Sparone stated that the site has no direct frontage to the roadway and no rear yard and detailed all of the side yard setback variances being requested. He detailed the lot coverage, the building coverage and stated that the property also meets the steep slope requirements. Mr. Sparone said that 199 parking spaces are being proposed and 324 parking spaces are required according to the Township Ordinance. Mr. Buechler asked Mr. Sparone if they had spoken to L.A. Fitness regarding the number of parking spots. Mr. Diaz approached the podium and stated that he met with them and L.A. Fitness is comfortable with the number of parking spaces being provided. Mr. Sparone stated that there is no designated loading space being proposed. He said the only deliveries made are by Federal Express or UPS trucks and they are made during peak hours at the front entrance. He said the Township Ordinance requires they have three loading spaces and they will need a variance for that. Mr. Sparone stated that they will have a separate trash enclosure with six foot plants surrounding it. Mr. Sparone pointed out where the retaining wall will be located and said that it will run the full length of the building. Mr. Sparone stated that they will stabilize the steep slope so that there is no disturbance. Mr. Sparone said that there is an existing storm water detention system underground and that they will mimic that same design. He said that it will be at or below the existing conditions. Mr. Regan asked Mr. Sparone if it will interfere with the buildings footings or structure; he replied no. Mr. Buechler asked if they read the Boards consulting Engineer’s memo dated 5/21/13; Mr. Sparone replied yes. Mr. Buechler asked Mr. Russo if the applicant agreed to satisfy the comment he noted in his memo; Mr. Russo said that Mr. Staigar did not express any objections to his comments.