Town CrierWest Orange, New Jersey
← Back to search

Agenda · Aug 20, 2020

August 20, 2020

Preserved file SHA-2567f4753aeb42d93f5c7bdade2cbc967c2356e02edecd578d2c3c000eaa966d17a

Indexed text

Page 1

1 AGENDA TOWNSHIP OF WEST ORANGE ZONING BOARD OF ADJUSTMENT MEETING August 20, 2020 8:00 P.M. Will be held virtually: https://us02web.zoom.us/j/86344626170? pwd=aVBVVlNOdVNHcUYzS2FlNS94dzNsZz09 Telephone – Dial US: 1-646-558-8656 Webinar ID: 863 4462 6170 Password: 766743 If you are experiencing issues joining, please email rdesena@westorange.org A. NOTICE Notice of this meeting was given to the Township Clerk, the West Orange Chronicle and the Star Ledger, and posted on the Township Bulletin Board in accordance with the “Senator Byron M. Baer Open Public Meetings Act.” B. PLEDGE OF ALLEGIANCE C. OPENING STATEMENT D. ROLL CALL Jerome Eben, Deborah Gabry, Philip D. Neuer, Bart Quentzel, Jonathan Redwine, Irv Schwarzbaum, William Steinhart, Dr. Michael Straker, M. Sussman, Alice Weiss E. ANNOUNCEMENTS Future Meetings: September 17, 2020 October 15, 2020 November 19, 2020 *Application ZB-20-04/Valley Hill Properties, that was scheduled to be heard at this meeting, has been carried over and adjourned to the Zoning Board regular meeting scheduled for September 17, 2020 and no further notice will be required

Page 2

2 *Application ZB-20-05/Russell, that was scheduled to be herd at this meeting, has been carried over and adjourned to the Zoning Board regular meeting scheduled for October 15, 2020 and no further notice will be required. F. MINUTES Adopt: July 16, 2020 G. SWEARING IN Township Professionals H. APPLICATIONS 1. ZB-19-10/955 Pleasant Valley Way, LLC Carried from 7/16/2020 Block: 172.02; Lots: 8.01 & 8.03; Zone: B-2 955 & 963 Pleasant Valley Way Seeking “d” use and height variances and “c” variances and preliminary and final major site plan approval to construct a four (4) story self-storage facility Executed Application Site Plans Stormwater Report Traffic Assessment Letter Report Parking Memorandum West Orange Cover Sheet Basement Plans First Floor Plans Second & Third Floor Plans Fourth Floor Plans Elevations Applicant's Professional Planners Report Revised Cover Sheet Revised Elevation Plan Revised Lower Cellar Plan Revised Office Plan Revised Roof Plan Revised Third Floor Plan Revised Upper Cellar Plan

Page 3

3 Site Plans Actual Revised 1st & 2nd Floor Plans Planning Directors Memo REVISED Township Forester Review Township Consulting Engineer Review Memo Ariel Exhibit Colorized Site Plan Exhibit Mean Grade Exhibit Site Plans REV 2 Exhibit Steep Slopes Plan Exhibit Street View From Above Exhibit East Above REVISED Exhibit Sustainability Checklist Exhibit Traffic Parking Assessment Letter Environmental Status of Former Gas Station Site Section Exhibit Solid Waste Management Statement Revised Site Plan 3 Truck Turning Exhibit Consulting Engineer’s Review Memo #2 Operations Presentation Exhibit Supplemental Report from Township Planner Foundation Retaining Wall Exhibit Building Height Calculation Narrative Environmental Noise Analysis Cover Letter Revised Submission Parking Memorandum Purchase Sale Agreement Traffic Assessment Revised Earthwork Exhibit Indemnification Access Agreement GEO Tech Report Revised Landscape Plan Environmental Report I. ADJOURNMENT

File revisions (1)