Supporting Documentation · Feb 1, 2023
2022 08 EIS SIgned
6308812de812a0d94ef4dbaee620c722bd975f30d675917057694e6ac9f1e39aIndexed text
Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nres.usda.gov/wps/portal/ nres/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nres/detail/national/soils/? cid=nres142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nres.usda.gov/Internet/FSE_DOCUMENTS/nres142p2_052290.pdf 30
NJDEP GEOWEB STREAMS AND WATER BODIES MAP
® DYNAMIC ENGINEERING EARTH SURVEY TRAFFIC NJDEP GeoWeb S [tairwesvecs [8] % 1904 Main Street, Lake Como, NJ 07719 T. 732-974-0198 245 Main Street, Suite 110, Chester, NJ 07930 T. 908-879-9229 100 NE 5* Avenue, Suite B2, Delray Beach, FL 33483 T. 561-291-8570 8 Robbins Street, Suite 102, Toms River, NJ 08753 T. 732-974-0198 14521 Old Katy Road, Suite 270, Houston, TX 77079 T. 281-789-6400 826 Newtown Yardley Ra., Suite 201, Newtown, PA 18940 T. 267-685-0276 | 714 S. Greenville Avenue, Suite 100, Allen, TX 75002 T. 972-534-2100
NJDEP GEOWEB BEDROCK GEOLOGY MAP
ENGINEERING EARTH SURVEY TRAFFIC ® DYNAMIC NJDEP GeoWeb Bedrock Geology Ma; 1904 Main Street, Lake Como, NJ 07719 T. 732-974-0198 245 Main Street, Suite 110, Chester, NJ 07930 T. 908-879-9229 100 NE 5* Avenue, Suite B2, Delray Beach, FL 33483 T. 561-291-8570 8 Robbins Street, Suite 102, Toms River, NJ 08753 T. 732-974-0198 14521 Old Katy Road, Suite 270, Houston, TX 77079 T. 281-789-6400 826 Newtown Yardley Rd., Suite 201, Newtown, PA 18940 T. 267-685-0276 | 714 S, Greenville Avenue, Suite 100, Allen, TX 75002 T. 972-5342100
STORMWATER MANAGEMENT, GROUNDWATER RECHARGE AND WATER QUALITY ANALYSIS (DYNAMIC ENGINEERING CONSULTANTS, PC) (NCLUDED SEPARATELY)
ALTA/NSPS LAND TITLE SURVEY (DYNAMIC SURVEY, LLC) (INCLUDED SEPARATELY)
TRAFFIC IMPACT STUDY (DYNAMIC TRAFFIC, LLC) (INCLUDED SEPARATELY)
REPORT OF PRELIMINARY GEOTECHNICAL AND STORMWATER BASIN AREA INVESTIGATION (DYNAMIC EARTH, LLC) (NCLUDED SEPARATELY)
(§25-13) ENVIRONMENTAL IMPACT ANALYSIS General Provisions. [Ord. No. 2357-12 § 25-13.1] The environmental impact generated by a land development project necessitates a comprehensive analysis of the variety of problems that may result and the actions that can be taken to minimize those problems. This constitutes an environmental impact statement. In evaluating the environmental impact, the Planning Board and the Zoning Board shall not approve any submission until it determines and finds that the proposed development: a. Will not result in appreciable harmful effects to the environment. b. Has been designed and. conceived with a view toward the protection of the regional resources. c. Will not place a disproportionate or excessive demand upon the total resources available for such proposal and for any future proposals. In order to accomplish these goals, the Board shall condition any approval upon the implementation of those performance controls deemed necessary to assure the protection of the environment. Any approval shall also be conditioned upon the receipt of licenses, permits or other approvals required by law. Those factors outlined in Subsection 25-13.4e along with supplemental requirements adopted by the Board shall be used to determine the environmental performance controls that are necessary. § 25-13.2General Requirements. [Ord. No. 2357-12 § 25-13.2] It is further recognized that the level of detail required for various types of applications will vary depending on the size of the proposal, the nature of the site and the location of the project. Therefore, having determined that some flexibility is needed in preparing the environmental impact statement, the requirements for such a document are listed as follows: a. Any application for a single one-family or two-family home, whether a new dwelling or a modification to an existing dwelling, is specifically exempt from the environmental impact statement requirements. In addition, all minor subdivisions and site plans that will not result in potential new construction or alteration to the site shall be exempt. b. A preapplication conference shall be held with the Planning Director to determine the content of the environmental impact statement as outlined in Subsection 25-13.4 along with any supplemental guidelines adopted by the Board. Waivers of specific environmental impact statement
File revisions (1)
- Sep 29, 2026
6308812de8123,001,566 bytes