Supporting Documentation · Oct 20, 2022
01 Site Plan Set Dated 10 4 2022
ad5c7faf32aa1baa0f716180e88e6fb5de5137bc6315a8f399b8aa3920c1541eIndexed text · page 9
Show all pagesTREE ROOT BALL AND ADJACENT PREPARED SOIL SEVERAL TIMES DURING THE FIRST MONTH AFTER PLANTING AND REGULARLY THROUGHOUT THE FOLLOWING TWO SUMMERS. 3. SOIL AMENDMENTS: · MODIFY HEAVY CLAY OR SILT SOILS (MORE THAN 40% CLAY OR SILT) BY ADDING COMPOSTED PINE BARK (UP TO 30% BY VOLUME) OR GYPSUM · MODIFY EXTREMELY SANDY SOILDS (MORE THAN 85% SAND) BY ADDING ORGANIC MATTER AND/OR DRY, SHREDDED CLAY LOAM UP TO 30% OF THE TOTAL MIX AVOID PURCHASING TREES WITH TWO LEADERS OR REMOVE ONE AT PLANTING: OTHERWISE, DO NOT PRUNE TREE AT PLANTING EXCEPT FOR SPECIFIC STRUCTURAL CORRECTIONS SET ROOT BALL FLUSH TO GRADE OR SEVERAL INCHES HIGHER IN POORLY DRAINING SOILS CUT BANDS OF WIRE BASKET AND FOLD AWAY FROM TOP OF ROOT BALL 4" BUILT-UP EARTH SAUCER BACKFILL SOIL · 1 PART SOIL AMENDMENT (BASED ON SOIL TEST) · 3 PARTS NATIVE TOPSOIL TAMP SOIL SOLIDLY AROUND BASE OF ROOT BALL SET ROOT BALL ON FIRM PAD IN BOTTOM OF HOLE DO NOT STAKE OR WRAP TRUNK 3" DOUBLE SHREDDED HARDWOOD MULCH (DO NOT PLACE MULCH IN CONTACT WITH TREE TRUNK) HOLE SHALL BE 2 1/2 TIMES THE WIDTH OF THE ROOT BALL ROPES AT THE TOP OF BALL SHALL BE CUT AND REMOVED. FOLD BACK TOP 1/3 OF BURLAP.ALL NON-BIODEGRADABLE MATERIAL SHALL BE REMOVED. UNDISTURBED SUBGRADE DIG WIDE, SHALLOW HOLE WITH TAPERED SIDES EVERGREEN TREE PLANTING DETAIL NOT TO SCALE REFERENCES ARCHITECTURAL GRAPHIC STANDARDS COPYRIGHT 2000 4-6" DEEPER THAN ROOT BALL DECIDUOUS TREE PLANTING DETAIL REFERENCES ARCHITECTURAL GRAPHIC STANDARDS COPYRIGHT 2000 NOT TO SCALE NOTES: 1. FOR CONTAINER-GROWN TREES, USE FINGERS OR SMALL HAND TOOLS TO PULL THE ROOTS OUT OF THE OUTER LAYER OF POTTING SOIL; THEN CUT OR PULL APART ANY ROOTS CIRCLING THE PERIMETER OF THE CONTAINER. 2. THOROUGHLY SOAK THE TREE ROOT BALL AND ADJACENT PREPARED SOIL SEVERAL TIMES DURING THE FIRST MONTH AFTER PLANTING AND REGULARLY THROUGHOUT THE FOLLOWING TWO SUMMERS. 3. SOIL AMENDMENTS: · MODIFY HEAVY CLAY OR SILT SOILS (MORE THAN 40% CLAY OR SILT) BY ADDING COMPOSTED PINE BARK (UP TO 30% BY VOLUME) OR GYPSUM · MODIFY EXTREMELY SANDY SOILS (MORE THAN 85% SAND) BY ADDING ORGANIC MATTER AND/OR DRY, SHREDDED CLAY LOAM UP TO 30% OF THE TOTAL MIX DO NOT STAKE OR WRAP TRUNK HOLE SHALL BE 2 1/2 TIMES THE WIDTH OF THE ROOT BALL 3" DOUBLE SHREDDED HARDWOOD MULCH (DO NOT PLACE MULCH IN CONTACT WITH TREE TRUNK) ROPES AT TOP OF BALL SHALL BE CUT AND REMOVED. FOLD BACK TOP 1/3 OF BURLAP. ALL
2 1/2 TIMES THE WIDTH OF THE ROOT BALL 3" DOUBLE SHREDDED HARDWOOD MULCH (DO NOT PLACE MULCH IN CONTACT WITH TREE TRUNK) ROPES AT TOP OF BALL SHALL BE CUT AND REMOVED. FOLD BACK TOP 1/3 OF BURLAP. ALL NON-BIODEGRADABLE MATERIAL SHALL BE REMOVED. UNDISTURBED SUBGRADE DIG WIDE, SHALLOW HOLE WITH TAPERED SIDES AVOID PURCHASING TREES WITH TWO LEADERS OR REMOVE ONE AT PLANTING: OTHERWISE, DO NOT PRUNE TREE AT PLANTING EXCEPT FOR SPECIFIC STRUCTURAL CORRECTIONS SET ROOT BALL FLUSH TO GRADE OR SEVERAL INCHES HIGHER IN POORLY DRAINING SOILS CUT BANDS OF WIRE BASKET AND FOLD AWAY FROM TOP OF ROOT BALL 4" BUILT-UP EARTH SAUCER BACKFILL SOIL · 1 PART SOIL AMENDMENT (BASED ON SOIL TEST) · 3 PARTS NATIVE TOPSOIL 4-6" DEEPER THAN ROOT BALL TAMP SOIL SOLIDLY AROUND BASE OF ROOT BALL SET ROOT BALL ON FIRM PAD IN BOTTOM OF HOLE SPACING CHART A ROW "A"SPACING "D" PLANTED ON CENTER (SEE SPACING CHART) 36" O.C. 6" O.C. 8" O.C. 10" O.C. 12" O.C. 15" O.C 18" O.C. 24" O.C. 30" O.C. 30.00" 5.20" 6.93" 8.66" 10.40" 13.00" 15.60" 20.80" 26.00" DD D NOT TO SCALE NOTES: 1. THOROUGHLY SOAK THE GROUND COVER ROOT BALL AND ADJACENT PREPARED SOIL SEVERAL TIMES DURING THE FIRST MONTH AFTER PLANTING AND REGULARLY THROUGHOUT THE FOLLOWING TWO SUMMERS. 2. SOIL AMENDMENTS: · MODIFY HEAVY CLAY OR SILT SOILDS (MORE THAN 40% CLAY OR SILT) BY ADDING COMPOSTED PINE BARK (UP TO 30% BY VOLUME) OR GYPSUM · MODIFY EXTREMELY SANDY SOILDS (MORE THAN 85% SAND) BY ADDING ORGANIC MATTER AND/OR DRY, SHREDDED CLAY LOAM UP TO 30% OF THE TOTAL MIX 3. ALL GROUND COVER AREAS SHALL BE TREATED WITH A PRE-EMERGENT PER MANUFACTURER'S SPECIFICATIONS 2" DOUBLE SHREDDED HARDWOOD MULCH (DO NOT PLACE MULCH AGAINST THE BASE OF THE PLANT) GENTLY PULL ROOTS AWAY FROM TOPSOIL MASS WITH FINGERS BACKFILL SOIL · 1 PART SOIL AMENDMENT (BASED ON SOIL TEST) · 3 PARTS NATIVE TOPSOIL UNDISTURBED SUBGRADE GROUND COVER/PERENNIAL/ANNUAL PLANTING DETAIL NOT TO SCALE 8" TO 12" NOTES: 1. FOR THE CONTAINER-GROWN SHRUBS, USE FINGERS OR SMALL HAND TOOL TO PULL THE ROOTS OUT OF THE OUTER LAYER OF POTTING SOIL; THEN CUT OR PULL APART ANY ROOTS CIRCLING THE PERIMETER OF THE CONTAINER. 2. THOROUGHLY SOAK THE SHRUB ROOT BALL AND ADJACENT PREPARED SOIL SEVERAL TIMES DURING THE FIRST MONTH AFTER PLANTING AND REGULARLY THROUGHOUT THE FOLLOWING TWO SUMMERS. · MODIFY HEAVY CLAY OR SILT SOILS (MORE THAN 40% CLAY OR SILT) BY ADDING COMPOSTED PINE BARK (UP
SEVERAL TIMES DURING THE FIRST MONTH AFTER PLANTING AND REGULARLY THROUGHOUT THE FOLLOWING TWO SUMMERS. · MODIFY HEAVY CLAY OR SILT SOILS (MORE THAN 40% CLAY OR SILT) BY ADDING COMPOSTED PINE BARK (UP TO 30% BY VOLUME) OR GYPSUM ·MODIFY EXTREMELY SANDY SOILS (MORE THAN 85% SAND) BY ADDING ORGANIC MATTER AND/OR DRY, SHREDDED CLAY LOAM UP TO 30% OF THE TOTAL ROPES AT THE TOP OF BALL SHALL BE CUT AND REMOVED. FOLD BACK TOP 1/3 OF BURLAP. ALL NON-BIODEGRADABLE MATERIAL SHALL BE REMOVED. PLANTING HOLE SHALL BE 12" TO 18" DEEP. FOR LARGER SHRUB ROOT BALLS, MAKE DEPTH MIN. 4" DEEPER THAN BALL. BALLED AND BURLAPPED PLANT SOIL SURFACE ROUGHENED TO BIND WITH BACKFILL SOIL. TOP OF SHRUB ROOT BALL SHALL BE SET FLUSH WITH FINISHED GRADE 3" DOUBLE SHREDDED HARDWOOD MULCH (DO NOT PLACE MULCH AGAINST THE BASE OF THE PLANT) CONTAINER-GROWN PLANT WITH ROOTS PULLED OUT OF BALL BACKFILL SOIL · 1 PART SOIL AMENDMENT (BASED ON SOIL TEST) · 3 PARTS NATIVE TOPSOIL UNDISTURBED SUBGRADE DECIDUOUS AND EVERGREEN SHRUB PLANTING DETAIL NOT TO SCALE REFERENCES ARCHITECTURAL GRAPHIC STANDARDS COPYRIGHT 2000 1 2 3 4 AFTON SAVITZ, P.E. NEW JERSEY LICENSE No. 57674 LICENSED PROFESSIONAL ENGINEER
File revisions (1)
- Sep 29, 2026
ad5c7faf32aa4,923,337 bytes