Supporting Documentation · Nov 17, 2022
V3 RESUBMISSION Stormwater Management Report Rev 2 Dated November 3 2022
51baad1e902190dbd8bc99e285d5ec57900256b219be5005cdb7869b76e2669bIndexed text
7 Precipitation Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 2 DA-2 (Pervious) Storm Frequency = 2 yrs Time interval = 3 min Total precip. = 3.4400 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Ora Incremental Rainfall Precipitation Precip (in) Precip (in) Hyd. No. 2 : DA-2 (Pervious) - 2 Year 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0
0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 Time (hrs) Custom Design Storm -- S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Orange\Civil\Cur
8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 3 DA-2 (Impervious) Hydrograph type = SCS Runoff Peak discharge = 3.437 cfs Storm frequency = 2 yrs Time to peak = 12.05 hrs Time interval = 3 min Hyd. volume = 13,313 cuft Drainage area = 1.220 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 3.44 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 Shape factor 0265 Daughters = 484 of Israel - West Oran DA-2 (Impervious) Q (cfs) Q (cfs) Hyd. No. 3 -- 2 Year 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 Time (hrs) Hyd No. 3
9 Precipitation Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 3 DA-2 (Impervious) Storm Frequency = 2 yrs Time interval = 3 min Total precip. = 3.4400 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Ora Incremental Rainfall Precipitation Precip (in) Precip (in) Hyd. No. 3 : DA-2 (Impervious) - 2 Year 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0
0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 Time (hrs) Custom Design Storm -- S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Orange\Civil\Cur
10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 4 DA-3 (Pervious) Hydrograph type = SCS Runoff Peak discharge = 5.223 cfs Storm frequency = 2 yrs Time to peak = 12.15 hrs Time interval = 3 min Hyd. volume = 21,835 cuft Drainage area = 5.560 ac Curve number = 72* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.50 min Total precip. = 3.44 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 Shape factor 0265 Daughters = 484 of Israel - West Oran * Composite (Area/CN) = [(0.010 x 30) + (4.210 x 70) + (0.340 x 77) + (0.400 x 74) + (0.600 x 80)] / 5.560 DA-3 (Pervious) Q (cfs) Q (cfs) Hyd. No. 4 -- 2 Year 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00
2.00 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 Time (hrs) Hyd No. 4
11 Precipitation Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 4 DA-3 (Pervious) Storm Frequency = 2 yrs Time interval = 3 min Total precip. = 3.4400 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Ora Incremental Rainfall Precipitation Precip (in) Precip (in) Hyd. No. 4 : DA-3 (Pervious) - 2 Year 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0
0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 Time (hrs) Custom Design Storm -- S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Orange\Civil\Cur
12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 5 DA-3 (Impervious) Hydrograph type = SCS Runoff Peak discharge = 3.888 cfs Storm frequency = 2 yrs Time to peak = 12.05 hrs Time interval = 3 min Hyd. volume = 15,059 cuft Drainage area = 1.380 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 3.44 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 Shape factor 0265 Daughters = 484 of Israel - West Oran DA-3 (Impervious) Q (cfs) Q (cfs) Hyd. No. 5 -- 2 Year 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 Time (hrs) Hyd No. 5
File revisions (1)
- Sep 29, 2026
51baad1e902114,491,312 bytes