Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 17, 2022

V3 RESUBMISSION Stormwater Management Report Rev 2 Dated November 3 2022

Preserved file SHA-25651baad1e902190dbd8bc99e285d5ec57900256b219be5005cdb7869b76e2669b

Indexed text

Page 123

7 Precipitation Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 2 DA-2 (Pervious) Storm Frequency = 2 yrs Time interval = 3 min Total precip. = 3.4400 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Ora Incremental Rainfall Precipitation Precip (in) Precip (in) Hyd. No. 2 : DA-2 (Pervious) - 2 Year 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0

Page 123

0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 Time (hrs) Custom Design Storm -- S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Orange\Civil\Cur

Page 124

8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 3 DA-2 (Impervious) Hydrograph type = SCS Runoff Peak discharge = 3.437 cfs Storm frequency = 2 yrs Time to peak = 12.05 hrs Time interval = 3 min Hyd. volume = 13,313 cuft Drainage area = 1.220 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 3.44 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 Shape factor 0265 Daughters = 484 of Israel - West Oran DA-2 (Impervious) Q (cfs) Q (cfs) Hyd. No. 3 -- 2 Year 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 Time (hrs) Hyd No. 3

Page 125

9 Precipitation Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 3 DA-2 (Impervious) Storm Frequency = 2 yrs Time interval = 3 min Total precip. = 3.4400 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Ora Incremental Rainfall Precipitation Precip (in) Precip (in) Hyd. No. 3 : DA-2 (Impervious) - 2 Year 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0

Page 125

0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 Time (hrs) Custom Design Storm -- S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Orange\Civil\Cur

Page 126

10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 4 DA-3 (Pervious) Hydrograph type = SCS Runoff Peak discharge = 5.223 cfs Storm frequency = 2 yrs Time to peak = 12.15 hrs Time interval = 3 min Hyd. volume = 21,835 cuft Drainage area = 5.560 ac Curve number = 72* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.50 min Total precip. = 3.44 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 Shape factor 0265 Daughters = 484 of Israel - West Oran * Composite (Area/CN) = [(0.010 x 30) + (4.210 x 70) + (0.340 x 77) + (0.400 x 74) + (0.600 x 80)] / 5.560 DA-3 (Pervious) Q (cfs) Q (cfs) Hyd. No. 4 -- 2 Year 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00

Page 126

2.00 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 Time (hrs) Hyd No. 4

Page 127

11 Precipitation Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 4 DA-3 (Pervious) Storm Frequency = 2 yrs Time interval = 3 min Total precip. = 3.4400 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Ora Incremental Rainfall Precipitation Precip (in) Precip (in) Hyd. No. 4 : DA-3 (Pervious) - 2 Year 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0

Page 127

0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 Time (hrs) Custom Design Storm -- S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Orange\Civil\Cur

Page 128

12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 5 DA-3 (Impervious) Hydrograph type = SCS Runoff Peak discharge = 3.888 cfs Storm frequency = 2 yrs Time to peak = 12.05 hrs Time interval = 3 min Hyd. volume = 15,059 cuft Drainage area = 1.380 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 3.44 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 Shape factor 0265 Daughters = 484 of Israel - West Oran DA-3 (Impervious) Q (cfs) Q (cfs) Hyd. No. 5 -- 2 Year 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 Time (hrs) Hyd No. 5

File revisions (1)