Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 17, 2022

V3 RESUBMISSION Stormwater Management Report Rev 2 Dated November 3 2022

Preserved file SHA-25651baad1e902190dbd8bc99e285d5ec57900256b219be5005cdb7869b76e2669b

Indexed text

Page 27

11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 5 DA-2 Hydrograph type = SCS Runoff Peak discharge = 0.429 cfs Storm frequency = 2 yrs Time to peak = 12.15 hrs Time interval = 3 min Hyd. volume = 1,888 cuft Drainage area = 0.600 ac Curve number = 68* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.10 min Total precip. = 3.44 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 Shape factor 0265 Daughters = 484 of Israel - West Oran * Composite (Area/CN) = [(0.100 x 77) + (0.140 x 70) + (0.250 x 80) + (0.110 x 30)] / 0.600 DA-2 Q (cfs) Q (cfs) Hyd. No. 5 -- 2 Year 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20

Page 27

0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 3 6 9 12 15 18 21 24 27 Time (hrs) Hyd No. 5

Page 28

12 Precipitation Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 5 DA-2 Storm Frequency = 2 yrs Time interval = 3 min Total precip. = 3.4400 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Ora Incremental Rainfall Precipitation Precip (in) Precip (in) Hyd. No. 5 : DA-2 - 2 Year 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0

Page 28

0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 Time (hrs) Custom Design Storm -- S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Orange\Civil\Cur

Page 29

13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 6 DA-3 (Impervious) Hydrograph type = SCS Runoff Peak discharge = 5.917 cfs Storm frequency = 2 yrs Time to peak = 12.05 hrs Time interval = 3 min Hyd. volume = 22,917 cuft Drainage area = 2.100 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 3.44 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 Shape factor 0265 Daughters = 484 of Israel - West Oran DA-3 (Impervious) Q (cfs) Q (cfs) Hyd. No. 6 -- 2 Year 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27

Page 29

0.00 0 3 6 9 12 15 18 21 24 27 Time (hrs) Hyd No. 6

Page 30

14 Precipitation Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 6 DA-3 (Impervious) Storm Frequency = 2 yrs Time interval = 3 min Total precip. = 3.4400 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Ora Incremental Rainfall Precipitation Precip (in) Precip (in) Hyd. No. 6 : DA-3 (Impervious) - 2 Year 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0

Page 30

0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 Time (hrs) Custom Design Storm -- S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Orange\Civil\Cur

Page 31

15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 7 DA-3 (Pervious) Hydrograph type = SCS Runoff Peak discharge = 1.361 cfs Storm frequency = 2 yrs Time to peak = 12.15 hrs Time interval = 3 min Hyd. volume = 6,384 cuft Drainage area = 2.440 ac Curve number = 65* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.50 min Total precip. = 3.44 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 Shape factor 0265 Daughters = 484 of Israel - West Oran * Composite (Area/CN) = [(0.890 x 80) + (0.210 x 74) + (0.550 x 30) + (0.760 x 70) + (0.030 x 77)] / 2.440 DA-3 (Pervious) Q (cfs) Q (cfs) Hyd. No. 7 -- 2 Year 2.00 2.00 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 Time (hrs) Hyd No. 7

Page 32

16 Precipitation Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 11 / 2 / 2022 Hyd. No. 7 DA-3 (Pervious) Storm Frequency = 2 yrs Time interval = 3 min Total precip. = 3.4400 in Distribution = Custom Storm duration = S:\Petry Engineering Cad Projects\2019\19 0265 Daughters of Israel - West Ora Incremental Rainfall Precipitation Precip (in) Precip (in) Hyd. No. 7 : DA-3 (Pervious) - 2 Year 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0

File revisions (1)