Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 15, 2022

2022 10 Drainage Statement Signed

Preserved file SHA-2568a5378b121c9d87088e703dfb5956ed3d9e87a7ba9636de8cdd33def16f03d46

Indexed text

Page 44

0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 5

Page 45

22 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Monday, Oct 24, 2022 Hyd. No. 6 Proposed Site (Pervious) Hydrograph type = SCS Runoff Peak discharge = 1.839 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 5,490 cuft Drainage area = 0.280 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 2.00 min Total precip. = 8.66 in Distribution = Custom Storm duration = NOAA Atlas 14 Type-D.cds Shape factor = 484 Proposed Site (Pervious) Q (cfs) Q (cfs) Hyd. No. 6 -- 100 Year 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6

Page 46

23 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Monday, Oct 24, 2022 Hyd. No. 7 Proposed Total Hydrograph type = Combine Peak discharge = 8.098 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 27,267 cuft Inflow hyds. = 5, 6 Contrib. drain. area = 1.040 ac Proposed Total Q (cfs) Q (cfs) Hyd. No. 7 -- 100 Year 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 7 Hyd No. 5 Hyd No. 6

Page 47

24 Hydraflow Rainfall Report Hydraflow Hydrographs by Intelisolve v9.1 Monday, Oct 24, 2022 Return Intensity-Duration-Frequency Equation Coefficients (FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 -------- 2 69.8703 13.1000 0.8658 -------- 3 0.0000 0.0000 0.0000 -------- 5 79.2597 14.6000 0.8369 -------- 10 88.2351 15.5000 0.8279 -------- 25 102.6072 16.5000 0.8217 -------- 50 114.8193 17.2000 0.8199 -------- 100 127.1596 17.8000 0.8186 -------- File name: SampleFHA.idf Intensity = B / (Tc + D)^E Return Intensity Values (in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44

Page 47

4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc = time in minutes. Values may exceed 60. Precip. file name: Essex County.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 0.00 3.44 0.00 0.00 5.22 6.44 0.00 8.66 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 1.25 3.44 0.00 0.00 5.22 6.44 0.00 8.66

Page 48

MULTI-HYDROGRAPH PLOT – EXISTING AND PROPOSED SUPERIMPOSED 2 YR. 10 YR & 100 YR.

Page 49

Multi-Hydrograph Plot Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 3 Hyd. No. 7 Existing Total Proposed Total Hydrograph type = Combine Hydrograph type = Combine Peak discharge = 2.944 cfs Peak discharge = 2.89 cfs Time to peak = 12.07 hrs Time to peak = 12.07 hrs Hyd. Volume = 9,861 cuft Hyd. Volume = 9,553 cuft Existing Total and Proposed Total Q (cfs) Q (cfs) 2-yr frequency 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0.0 1.8 3.7 5.5 7.3 9.2 11.0 12.8 14.7 16.5 18.3 Time (hrs) Hyd No. 3 Hyd No. 7

Page 50

Multi-Hydrograph Plot Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 3 Hyd. No. 7 Existing Total Proposed Total Hydrograph type = Combine Hydrograph type = Combine Peak discharge = 4.689 cfs Peak discharge = 4.64 cfs Time to peak = 12.07 hrs Time to peak = 12.07 hrs Hyd. Volume = 15,817 cuft Hyd. Volume = 15,477 cuft Existing Total and Proposed Total Q (cfs) Q (cfs) 10-yr frequency 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0.0 1.8 3.7 5.5 7.3 9.2 11.0 12.8 14.7 16.5 18.3 Time (hrs) Hyd No. 3 Hyd No. 7

Page 51

Multi-Hydrograph Plot Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 3 Hyd. No. 7 Existing Total Proposed Total Hydrograph type = Combine Hydrograph type = Combine Peak discharge = 8.140 cfs Peak discharge = 8.10 cfs Time to peak = 12.07 hrs Time to peak = 12.07 hrs Hyd. Volume = 27,668 cuft Hyd. Volume = 27,267 cuft Existing Total and Proposed Total Q (cfs) Q (cfs) 100-yr frequency 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0.0 1.8 3.7 5.5 7.3 9.2 11.0 12.8 14.7 16.5 18.3 Time (hrs) Hyd No. 3 Hyd No. 7

Page 52

STORMWATER COLLECTION SYSTEM CLACULATIONS (PIPE SIZING)

File revisions (1)