Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 9, 2023

V4 15 Architectural Plans 1 30 2023

Preserved file SHA-256d9eaa4c5f8012ca6a20f5e845bdbd3b5e2c303045f7057a887081df452b5d4ef

Indexed text

Page 5

ENTRY/EXIT ENTRY/EXIT VEST. MECH./ELEC. FIN. FLOOR EL. 412.5' FIN. FLOOR EL. 414.5' RAMP DOWN 1:12 / 24' 12 EV SPACES 14 SPACES 14 SPACES 19 SPACES 4 SPACES 9 SPACES 10 SPACES 12 SPACES 6 SPACES C OF COLS. L C OF COLS. L C OF COLS.L C OF COLS.L TYP. PARKING SPACE DIMENSIONS TYP. PARKING SPACE DIMENSIONS VAN TYP. TYP. TYP. 8 EV SPACES EV VAN 4 SPACES EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EVEV 115 PARKING SPACES MEN'S LOCKER RM. WOMEN'S LOCKER RM. OFFICE POOL STOR. POOL EQUIP. FITNESS AND AEROBICS STOR. HK CL. AEROBICS 745 S.F. (800) FITNESS ROOM 1100 S.F. (1100) POOL ROOM 3277 S.F. STORAGE PARKING GARAGE 7,518 S.F. FITNESS CENTER LOBBY 2 BR 2 BR 2 BR+D INDEPENDENT LIVING APARTMENTS ELEC. RM. EV EV NOTE: 20 ELECTRICAL CHARGING STATION 'EV' SPACES ARE LOCATED IN LAYOUT - COORDINATE WITH CIVIL DRAWINGS FOR ADDITIONAL INFORMATION. 8 'EV' CHARGING STATIONS ARE TO BE INSTALLED WITHIN 3 YEARS OF CO. 12 'EV' CHARGING STATIONS ARE TO BE INSTALLED WITHIN 6 YEARS OF CO. NOTE: REFER TO CIVIL DRAWINGS SIGN LEGEND ON SP-3 AND SIGN DETAIL ON SP-19 FOR CHARGING STATION SIGNAGE NOTE: REFER TO CIVIL ENGINEERING DRAWINGS FOR ACCESSIBLE PARKING DETAILS NOTE: WALL MOUNTED ADA ACCESSIBLE SIGN AT EACH ACCESSIBLE PARKING SPACE - SEE CIVIL DRAWINGS FOR DETAILS NOTE: PARKING GARAGE WILL BE ILLUMINATED TO DAYTIME AND NIGHTTIME LEVELS IN COMPLIANCE WITH TOWNSHIP REQUIREMENTS CH 25-14.3. BIKE RACK BIKE RACK 7'-2" 3'-1"±1/2" 9 7/8" 2" SCHED. 40 PIPE GRADE LOWER LEVEL PLAN A1.0 LOWER FLOOR LEVEL SCALE: 1" =30'-0" PROJECT NORTH · Parking Garage · Common Spaces-Fitness Center · Support Spaces · ILU Apartments Proj. No: ISSUES REVISIONS 1304.01.02 Issued For: Date: 10-21-2021 Site Plan Application 1155 Pleasant Valley Way West Orange NJ 07052 · · DAVID S. FOWLES, AIA 500 Kings Highway South Cherry Hill, NJ 08034 856.770.1060 office@ kd-arch.com architects KDA BIKE RACK DETAIL SCALE: 1/2" = 1'-0" 2 A1.0

Page 6

CORRIDOR DEN T. LINEN STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO 1 BR+D 2 BR+D 2 BR+D CORRIDOR 1 BR+D 1 BR 2 BR 2 BR+D 1 BR 1 BR+D LOBBY KITCHEN PT/OT STORAGE 548 S.F. (600) DINING ILU AREA - 6996 S.F. ILU AREA - 5064 S.F. ILU AREA - 23,849 S.F. ILU AREA - 11,193 S.F. UNITMANAGER AND SEC MAINT. SHOP FACILITIES MAN. OFFICE (Bill W.) RECEIVING CENTRAL SUPPLY 745 S.F. ADMIN./HR 3,837 S.F.(1906+930=2836) LAUNDRY 810 S.F. CEO ASSIST. (Patricia V.) K. KITCHEN HR RECEP. AND WAIT'G PORTE COCHERE VEST. TERRACE #1 5,337 S.F. COURTYARD #2 4,140 S.F. 2 BR 2 BR 2 BR 1 BR + D 2 BR + D 1 BR 1 BR 2 BR + D 2 BR + D 1 BR + D 2 BR 1 BR 1 BR + D2 BR + D SUPPORT SUPPORT 1 BR 2 BR 2 BR1 BR 2 BR+D 2 BR 2 BR 2 BR+D1 BR 1 BR 1 BR 1 BR+D 2 BR+D 2 BR+D CORRIDOR SALON 1 BR+D 1 BR 2 BR 2 BR+D 1 BR 1 BR+D M.F. AUDITORIUM 2,472 S.F. MEDITATION 550 S.F. (600) GREAT ROOM 2,146 S.F. (1800) MARKET PLACE 910 S.F. 2,049 S.F. MARKETING 1063 S.F. (938) 2,308 S.F. ART ROOM STORAGE 548 S.F. (600) ILU AREA - 6996 S.F. ILU AREA - 5064 S.F. ILU AREA - 23,849 S.F. ILU AREA - 11,193 S.F. 121 SEATS STOR. 340 S.F. HK STORAGE 260 S.F. MECH. ELEC. 255 S.F. RECEIVING HK OFFICE LOBBY COURTYARD #1 3,477 S.F. CONFERENCE ROOM CEO OFFICE (Susan G.) CFO OFFICE (David S.) CONTROLLERS OFFICE COFFEE CONF. COPY WORK RM. 1193 S.F. TLT. TLT. STOR. PRIVATE DINING DINING WALKER STOR. STAGE PORCH PORCH ROOF AREA 5,554 S.F. INDEPENDENT LIVING APARTMENTS INDEPENDENT LIVING APARTMENTS INDEPENDENT LIVING APARTMENTS HEALTH CARE ENTRANCE 28,958 S.F. 31,338 S.F. (INCLUDING PT/OT) MAIN ENTRANCE LIVING RM. CONFERENCE RM. ADMIN. DIR. OFFICE AL MAN. OFFICE DISCOVERY CONF. ROOM MAIL ROOM EMPLOYEE LOUNGE STAFF COORD. OFFICE (Collette S.) OPEN OFFICE STATIONS (4) SEC. 11'-2" X 14'-0" 156 S.F. 10'-4" X 11'-2" 115 S.F. 10'-4" X 11'-2" 115 S.F. 9'-9" X 14'-0" 140 S.F. 13'-4" X 11'-0" 146 S.F. 38'-0" X 10'-4" 395 S.F. 28'-0" X 13'-8" 377 S.F. 12'-0" X 13'-8" 164 S.F. 17'-0" X 13'-8" 232 S.F. 11'-6" X 8'-0" 10'-6" X 10'-0" ADMIN. ENTRANCE RECEPTIONIST STATION EMPLOYEE LOCKER RM. 58 LOCKERS TLT. TLT. 10'-0" X 11'-0" 110 S.F. TLT. MKTG COORD. 13'-0" X 10'-7" 136 S.F. MKTG DIR. 13'-2" X 10'-7" 138 S.F. SECURITY WORK RM. 94 S.F. TRANSPORT (Cindy D.) 10'-0" X 12'-11" 130 S.F. GIFT STORE BREAK RM. TLT. HR OFFICE (Jennifer L.) 9'-9" X 14'-4" 140

Page 6

3'-0" X 10'-7" 136 S.F. MKTG DIR. 13'-2" X 10'-7" 138 S.F. SECURITY WORK RM. 94 S.F. TRANSPORT (Cindy D.) 10'-0" X 12'-11" 130 S.F. GIFT STORE BREAK RM. TLT. HR OFFICE (Jennifer L.) 9'-9" X 14'-4" 140 S.F. PAYROLL OFFICE 10'-0" X 11'-0" 110 S.F. TLT. DIR. OF DEVOL. OFFICE (Susan S.) 12'-6" X 10'-0" 12'-6" X 10'-0" THERAPY RM. 10'-0" X 15'-6" 154 S.F. DIR. OFFICE (Michael M.) 10'-3" X 12'-2" 127 S.F. TREATMENT RM. 12'-8" X 10'-0" 120 S.F. ADL SUITE STORAGE 10'-3" X 8'-8" 90 S.F. TREATMENT RM. 10'-3" X 10'-0" 103 S.F. NURSES STATION COUNTRYKITCHEN PANTRY STAFF MED. REC. DINING20 SEATS WORK STATIONS BUSINESS ACCOUNTING (Richard L. and Donna O.) IDF CL. LIFT CENTRAL SUPPLY H.K. SOILED UTILITY RES LAUND. LINEN OXYG. STORAGE 89 S.F. MEDS ELEC. CL. 439 S.F. GAME ROOM 544 S.F. PORCH LIBRARY 408 S.F. (600) BAR LOUNGE 883 S.F. (1800) ELEVATOR 'C' ENDURA 3500LB SP150 FRONT OPENING - LEFT BELOW GROUND JACK (MAX. TRAVEL 60') POWER 200-480 VAC, 3 PHASE, 60 HZ CONTROLLER TAC32 BATTERY LOWERING OPTION ELEVATOR 'D' ENDURA 3500LB SP150 FRONT OPENING - RIGHT BELOW GROUND JACK (MAX. TRAVEL 60') POWER 200-480 VAC, 3 PHASE, 60 HZ CONTROLLER TAC32 BATTERY LOWERING OPTION ELEVATOR E ENDURA 4000LB SP150 FRONT OPENING - CENTER BELOW GROUND JACK (MAX. TRAVEL 60') POWER 200-480 VAC, 3 PHASE, 60 HZ CONTROLLER TAC32 BATTERY LOWERING OPTION ELEVATOR A KONE 500 DX, CENTER OPENING - FRONT/REAR OPENING (1 SIDE OPG. AT LEVEL 1, 2 SIDED OPG. ON LEVELS 2 THRU 4) Capacity 4,000LB, Speed 150fpm, Power Supply 480V, Door Width and height 48" & 7'-0", Landings 4, Total Travel 39'-4", Integrated Control, ELEV. A ELEV. B ELEV. C ELEV. D ELEV. E IT/MDF RM. COPY K.K. STORAGE COMMONS PHASE 2 LEVEL 1 17,851 S.F. COMMONS PHASE 1 LEVEL 1 12,523 S.F. (INCLUDING ADMIN./HR) VIEWING RM. STORAGE & SUPPORT HOLDING/REF. 2 - STACKED CLEAN OUT PROGRAM FOR MORGUE: 1. BODY HOLDING AREA 2. VIEWING ROOM, CONSIDERATION OF MUSIC SYSTEM AND ADJUSTABLE LIGHTING. 3. STORAGE/SUPPORT ROOM, CLEAN LINENS, CLEANING MATERIALS AND AGENTS, USED LINEN COLLECTION, HAND WASH FACILITIES 4. MEP CONSIDERATION - ISOLATION OF SPACE AND VENTILATION SYSTEMS NUMBER OF BODIES TO BE STORED? - DESIGN BASED ON 2-BODY MOBILE REF. UNIT (REF. SYSTEMS, MODEL 1036-R101), POSITIVE TEMP STORAGE 3.3 C CLEAN LINEN STORAGE MAX Q 24x48 MAX Q 24x48 C 68 seats CLEANUTILITY PYXIS UNIT SODA SYSTEM CLOSET ADMINIST. OFFICE (Colleen T.) 160

Page 6

F. UNIT (REF. SYSTEMS, MODEL 1036-R101), POSITIVE TEMP STORAGE 3.3 C CLEAN LINEN STORAGE MAX Q 24x48 MAX Q 24x48 C 68 seats CLEANUTILITY PYXIS UNIT SODA SYSTEM CLOSET ADMINIST. OFFICE (Colleen T.) 160 S.F. NURSE STATION CL. SOILED IN FOLDING TABLE CLEAN LINEN CARTS SOILED CART PARKING WASHERS DRYERS HANDSINK, EYEWASH SOAK SINK SOILED IN MAX Q 24x48 MAX Q 21x48 MAX Q 21x48 MAX Q 21x48 MAX Q 21x48 MAX Q 21x48 MAX Q 21x48 MAX Q 21x48 MAX Q 21x42 CWO CWI MAX Q 21x48 MAX Q 21x42 MAX Q 24x48 MAX Q 24x48 MAX Q 24x48 MAX Q 24x48 C CWI CWO CWI CWO MAX Q 24x48 MAX Q 24x48 CWI CWO MAX Q 21x30 MAX Q 21x48 MAX Q 21x36 MAX Q 21x48 MAX Q 21x48 MAX Q 21x48 MAX Q 21x60 MAX Q 21x60 MAX Q 21x36 MAX Q 21x60 MAX Q 21x60 MAX Q 21x60 MAX Q 21x42 MAX Q 21x48 MAX Q 21x48 MAX Q 21x48 MAX Q 21x48 MAX Q 21x48 MAX Q 21x54 MAX Q 18x42 MAX Q 18x42 MAX Q 21x36 MAX Q 21x48 MAX Q 21x36 MAX Q 21x42 CWI CWO CWI CWO CWI CWO MAX Q 21x36 MAX Q 21x36 MAX Q 21x36 MAX Q 21x36 MAX Q 21x42 MAX Q 21x36 MAX Q 21x42 MAX Q 21x36 MAX Q 21x36 MAX Q 21x36 MAX Q 21x36 MAX Q 21x42 MAX Q 21x36 MAX Q 21x42 MAX Q 21x54 MAX Q 21x42 MAX Q 21x54 MAX Q 21x54 MAX Q 21x54 10 10 20 20 20 20 20 20 20 20 Salsbury 3711D-20 8 units Salsbury 3711D-10 2 units 12" WIDE COUNTER ELEVATOR B KONE 500 DX, CENTER OPENING - FRONT/REAR OPENING (2 SIDED OPG. AT LEVEL 1, 1 SIDED OPG. ON LEVELS 2 THRU 4) Capacity 4,000LB, Speed 150fpm, Power Supply 480V, Door Width and height 48" & 7'-0", Landings 4, Total Travel 39'-4", Integrated Control, 2-BED SHAREDUNIT STUDIO FIRST FLOOR PLAN A1.1FIRST FLOOR LEVEL SCALE: 1" =30'-0" 1 A.1.1 PROJECT NORTH · Independent Living Apartments · Common Spaces · Sub Acute Household · Support Spaces Proj. No: ISSUES REVISIONS 1304.01.02 Issued For: Date: 10-21-2021 Site Plan Application 1155 Pleasant Valley Way West Orange NJ 07052 · · DAVID S. FOWLES, AIA 500 Kings Highway South Cherry Hill, NJ 08034 856.770.1060 office@ kd-arch.com architects KDA

Page 7

2 BR 2 BR 1 BR + D 2 BR 2 BR+D 1 BR 1 BR+D 1 BR 2 BR+D TERRACE CORRIDOR 1 BR ELEC. ROOM ELEC. ROOM INDEPENDENT LIVING APARTMENTS 1 BR+D 2 BR+D 2 BR+D CORRIDOR 1 BR+D 1 BR+D 1 BR 1 BR + D 2 BR 2 BR 2 BR 1 BR + D 2 BR + D 2 BR 1 BR 2 BR + D 2 BR + D 1 BR + D 2 BR 1 BR 1 BR + D2 BR + D SUPPORT SUPPORT 1 BR 2 BR 2 BR 2 BR+D 2 BR 2 BR 2 BR+D1 BR 1 BR 1 BR CORRIDOR LOBBY DELUXE STUDIO DELUXE STUDIO 1 BED RM. 1 BED RM. 1 BED RM. 1 BED RM. 1 BED RM. 1 BED RM. 1 BED RM. 1 BED RM. DELUXE STUDIO DELUXE STUDIO DELUXE STUDIO DELUXE STUDIO DELUXE STUDIO DELUXE STUDIO DELUXE STUDIO DELUXE STUDIO DELUXE STUDIO DELUXE STUDIO DELUXE STUDIO 1 BED RM.1 BED RM.1 BED RM. INDEPENDENT LIVING APARTMENTS INDEPENDENT LIVING APARTMENTS MED. DIR. (DR. Arun) ADON/ICP (Natalie D.) 10'-4" X 11'-2" 115 S.F. 10'-4" X 11'-2" 115 S.F. DON (Jeannine S.) 10'-4" X 11'-2" 115 S.F. MDS OFFICE (Olivia B.) 11'-2" X 14'-0" 156 S.F. PORCH DEN DEN UNITMANAGER OFFICE NURSES STATION COUNTRY KITCHEN COUNTRY KITCHEN PANTRY MEDS. S.TLT. DINING DINING DINING DINING LIVING LIVING OXYG. STAFF LIFT CENTRAL SUPPLY 17 SEATS 22 Seats 6 SEATS 6 SEATS NURSES STATION CARTS W.CHAIRSFILES H.K. NURSE STATION COATS TLT. TLT. CLEAN UTILITY LAUNDRY GAME ROOM SOILED UTILITY IDF CL. LINEN CENTRAL STORAGE H.K. STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO NURSE STATION LINEN GAME RM. STORAGE PARLOR ELEC. CL. IT ROOM ELEV. LOBBY WORK RM. LINEN CL. IDF CL. ELEV. A ELEV. C ELEV. D ELEV. E COPY SOILED UTILITY RES LAUND. CLEAN UTILITY T. LINEN LIFT Shaft transfer on 2nd floor ceiling MAX Q 21x48 MAX Q 21x48 1 BR 2-BED SHARED UNIT STUDIO SECOND FLOOR PLAN A1.2SECOND FLOOR LEVEL SCALE: 1" =30'-0" 1 A.1.2 PROJECT NORTH · Independent Living Apartments · Assisted Living · Skilled Nursing Proj. No: ISSUES REVISIONS 1304.01.02 Issued For: Date: 10-21-2021 Site Plan Application 1155 Pleasant Valley Way West Orange NJ 07052 · · DAVID S. FOWLES, AIA 500 Kings Highway South Cherry Hill, NJ 08034 856.770.1060 office@ kd-arch.com architects KDA

Page 8

2 BR 2 BR 2 BR + D 2 BR 1 BR 2 BR + D 2 BR + D 1 BR + D SUPPORT 1 BR 2 BR 2 BR 2 BR+D 2 BR 2 BR 2 BR+D1 BR 1 BR 1 BR INDEPENDENT LIVING APARTMENTS INDEPENDENT LIVING APARTMENTS PORCH CORRIDOR CORRIDOR DEN DEN LOBBY STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIOSTUDIOSTUDIOSTUDIOSTUDIOSTUDIOSTUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO 2 BR 1 BR + D 2 BR 2 BR+D 1 BR 1 BR+D 1 BR 2 BR+D TERRACE CORRIDOR 1 BR ELEC. ROOM ELEC. ROOM 1 BR+D 2 BR+D 2 BR+D CORRIDOR 1 BR+D 1 BR+D 1 BR 1 BR + D 2 BR 1 BR + D 2 BR 1 BR 1 BR + D2 BR + D SUPPORT 2 BR INDEPENDENT LIVING APARTMENTS TLT. NURSES STATION COUNTRY KITCHEN COUNTRY KITCHEN PANTRY MEDS. S.TLT. DINING DINING DINING DINING LIVING LIVING OXYG. LIFT CENTRAL SUPPLY CLEAN UTILITY SOILED UTILITY 17 SEATS 22 Seats 6 SEATS 6 SEATS NURSES STATION CARTS FILES GAME ROOM H.K. LIFT NURSE TOUCH-DOWN STATION H.K. SOILED UTILITY IDF CL. LINEN CL. NURSE STATION IDF CL.ELEC. CL. LAUND. IT ROOM STAFF W.CHAIRS TLT. WORK RM. ELEV. LOBBY COATS S.S. DIR. OFFICE QA OFFICE (Kelly W.) 10'-4" X 11'-2" 115 S.F. 10'-4" X 11'-2" 115 S.F. SOCIAL SERV. (Lauren M.) 11'-2" X 14'-0" 156 S.F. DIETICIAN OFFICE 10'-4" X 12'-10" 132 S.F. ACTIVITIES (Yuki R.) 14'-6" X 13'-6" 198 S.F. LAUND. ELEV. C ELEV. D ELEV. E CLEAN UTILITY T. LINEN LINEN CENTRAL SUPPLY MAX Q 21x48 MAX Q 21x48 ELEV. A 1 BR STUDIO STUDIO STUDIO STUDIO 2-BED SHARED UNIT THIRD FLOOR PLAN A1.3THIRD FLOOR LEVEL SCALE: 1" =30'-0" 1 A.1.3 PROJECT NORTH · Independent Living Apartments · Skilled Nursing Proj. No: ISSUES REVISIONS 1304.01.02 Issued For: Date: 10-21-2021 Site Plan Application 1155 Pleasant Valley Way West Orange NJ 07052 · · DAVID S. FOWLES, AIA 500 Kings Highway South Cherry Hill, NJ 08034 856.770.1060 office@ kd-arch.com architects KDA

Page 9

2 BR 2 BR 2 BR + D 2 BR 1 BR 2 BR + D 2 BR + D 1 BR + D SUPPORT 1 BR 2 BR 2 BR 2 BR+D 2 BR 2 BR 2 BR+D1 BR 1 BR 1 BR INDEPENDENT LIVING APARTMENTS INDEPENDENT LIVING APARTMENTS PORCH CORRIDOR CORRIDOR DEN DEN LOBBY STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIOSTUDIOSTUDIOSTUDIOSTUDIOSTUDIOSTUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO 2 BR 1 BR + D 2 BR 2 BR+D 1 BR 1 BR+D 1 BR 2 BR+D TERRACE CORRIDOR 1 BR ELEC. ROOM ELEC. ROOM 1 BR+D 2 BR+D 2 BR+D CORRIDOR 1 BR+D 1 BR+D 1 BR 1 BR + D 2 BR 1 BR + D 2 BR 1 BR 1 BR + D2 BR + D SUPPORT 2 BR INDEPENDENT LIVING APARTMENTS TLT. NURSES STATION COUNTRY KITCHEN COUNTRY KITCHEN PANTRY MEDS. S.TLT. DINING DINING DINING DINING LIVING LIVING OXYG. LIFT CENTRAL SUPPLY CLEAN UTILITY SOILEDUTILITY 17 SEATS 22 Seats 6 SEATS 6 SEATS NURSES STATION CARTSFILES GAME ROOM H.K. LIFT NURSE TOUCH-DOWN STATIONH.K. SOILED UTILITY IDF CL. LINEN CL. NURSE STATION IDF CL.ELEC. CL. LAUND. IT ROOM STAFF W.CHAIRS TLT. WORK RM. ELEV. LOBBY COATS LAUND. ELEV. C ELEV. D ELEV. E CLEAN UTILITY T. LINEN H.C. SALON H.C. MEETING LINEN CENTRAL SUPPLY MAX Q 21x48 MAX Q 21x48 ELEV. A ELEV. B 36" VAN. 30" x 52" clearance OVERLAP OK PER 1103.11.2(C) 30" x 52" clearance STUDIOSTUDIO STUDIO 1 BED 1 BR STUDIO FOURTH FLOOR PLAN A1.4 FOURTH FLOOR LEVEL SCALE: 1" =30'-0" PROJECT NORTH · Independent Living Apartments · Assisted Living Proj. No: ISSUES REVISIONS 1304.01.02 Issued For: Date: 10-21-2021 Site Plan Application 1155 Pleasant Valley Way West Orange NJ 07052 · · DAVID S. FOWLES, AIA 500 Kings Highway South Cherry Hill, NJ 08034 856.770.1060 office@ kd-arch.com architects KDA

Page 10

PHASE ONE ROOF AREAS: 30,013 S.F. (HIGHER) + 4,081 (LOWER ROOFS) + 6,755 (LOWER AT LOADING) = TOTAL 40,849 S.F. GREEN ROOF AREAS: G1, 1,090 S.F. G2, 895 S.F. G3, 2,160 S.F. G4a, 1,300 S.F. G4b, 1,370 S.F. G5, 1,586 S.F. G6, 1,680 S.F. TOTAL = 10,081 S.F. PHASE 2, 4 STORY PHASE 3 4 STORY PHASE 2 TERRACE PHASE 1 4 STORY PHASE 1 2 STORY PHASE 2 1 STORYPHASE 2 1 STORY PHASE 1 1 STORY PHASE 1 TO PHASE 2 LINE EF GREEN ROOF SOLAR PANELS SOLAR PANELS EF GREEN ROOF GREEN ROOF SOLAR PANELS SOLAR PANELS SOLAR PANELS SOLAR PANELS SOLAR PANELS SOLAR PANELS GREEN ROOF 1586 s.f. 3680 s.f. 3000 s.f. 850 s.f.1000 s.f. 2600 S.F. 2606 S.F. 1253 S.F. 1702 S.F. 1070 S.F. 1475 S.F. GREEN ROOF 2962 s.f. PHASE 2 - G3 GREEN ROOF 1680 s.f. PHASE 2 - G4 1370 s.f. PHASE 1 - G4b GREEN ROOF 2160 s.f. PHASE - G3 GREEN ROOF 895 s.f. GREEN ROOF 1090 s.f. PHASE 1 - G1 GREEN ROOF 407 s.f. PHASE 2 - G2 547 s.f. PHASE 2 - G1 PHASE 3 - AREA G2 PHASE 3 - AREA G1 PHASE 3 - S3 PHASE 3 - S2 PHASE 3 - S1PHASE 2 - S5 PHASE 2 -S4 PHASE 2 -S3 PHASE 2 - S2 PHASE 2 - S-1 PHASE 1 - G2 PHASE 1 - G5 GREEN ROOF SUMMARY OF GREEN ROOF / SOLAR ROOF AREAS TOTAL ROOF AREA: 106,849 S.F. TOTAL GREEN ROOF / SOLAR ROOF AREAS: 23,970 S.F GREEN ROOF 22.4% 13,996 S.F. SOLAR ROOF 13.1% 39,022 S.F TOTAL 35.5% OF TOTAL ROOF AREA GREEN ROOF BREAKDOWN: PHASE ONE = 10,081 S.F. PHASE TWO = 6,026 S.F. PHASE THREE = 7,863 S.F. TOTAL = 23,970 S.F. SOLAR ROOF BREAKDOWN: PHASE ONE = 0 S.F. PHASE TWO = 7,940 S.F. PHASE THREE = 6,056 S.F. TOTAL = 13,996 S.F. LAUNDRY 1,500# x3 500# MDF ROOM 250# WATER HEATER FLUES DRYER EXHAUST KOSHER KITCHEN 1,500# 24"x20" SA & RA DN (4,000 CFM) 24"x20" SA & 20"x24" RA DN (4,000 CFM) 10"Ø DRYER EA W/ GOOSENECK ITI ROOM 300# 550# POOL DEHUMIDIFICATION UNIT LOWER LEVEL VRF SYSTEM 700# LOWER LEVEL DOAS UNIT 700# ODU SALON HVAC POOL WATER HEATER FLUE EXHAUST 12,000# 1,500# 1,500# 1,500# LOWER LEVEL AHU-2 1500# EMR 250# UTILITY SET KOSHER KITCHEN HOOD MAIN KITCHEN EXHIBITION HOOD MARKETPLACE PIZZA OVEN HOOD KOSHER KITCHEN x4 (L1-L4 PANTRIES) 300# EACH x3 IT ROOMS 150# MAIN KITCHEN PREP HOOD x7 (L1-L4 COUNTRY KITCHENS) KOSHER KITCHEN DISHWASHER HOOD MAIN KITCHEN EXHIBITION HOOD MAIN KITCHEN PREP HOOD MAIN KITCHEN MAIN KITCHEN DISHWASHER HOOD ENTRY MKTG ADMIN PT/OT L2-L4 LIVING ROOMS, DINING ROOMS AND L1 MARKETPLACE L1-L4 LIVING ROOMS, AND DINING ROOMS DUCTED OA INTAKE FOR ERU-1 TO MAINTAIN 25'-0" SEPARATION

Page 10

EN MAIN KITCHEN DISHWASHER HOOD ENTRY MKTG ADMIN PT/OT L2-L4 LIVING ROOMS, DINING ROOMS AND L1 MARKETPLACE L1-L4 LIVING ROOMS, AND DINING ROOMS DUCTED OA INTAKE FOR ERU-1 TO MAINTAIN 25'-0" SEPARATION FROM EXHAUST SOURCES DUCTED OA INTAKE FOR ERU-2 TO MAINTAIN 25'-0" SEPARATION FROM EXHAUST SOURCES DUCTED OA INTAKE FOR ERU-1 TO MAINTAIN 25'-0" SEPARATION FROM EXHAUST SOURCES DUCTED OA INTAKE FOR ERU-1 TO MAINTAIN 25'-0" SEPARATION FROM EXHAUST SOURCES x4 x4 x4 L1-L4 HC CORE AREAS (DENS, NURSE'S STATIONS, UNIT MGR OFFICE, MEDS, ETC.) OXYGEN ROOMS L4 SALON 6,500# 6,500# 7,000# 8,000# 8,000# 500# EACH 550# EACH 550# EACH 550# EACH 3,600# 500# EACH 550# EACH 6,500# x4 550# EACH PHASE 2 TO PHASE 3 LINE PHASE 2 1 STORY GREEN ROOF 1680 s.f. PHASE 1 - G6 GREEN ROOF 1300 s.f. PHASE 1 - G4a SOLAR PANELS 1440 S.F. PHASE 2 - S-6 GREEN ROOF 1183 s.f. PHASE 3 - G3 GREEN ROOF 1038 s.f. PHASE 2 - G5 GREEN ROOF 944 s.f. PHASE 2 - G4 GREEN ROOF AREA SOLAR ROOF AREA PHASE TWO ROOF AREAS: 32,187 S.F. (HIGHER) + 6868 (LOWER DINING AND AUDITORIUM) = TOTAL 40,056 S.F. GREEN ROOF AREAS: G1, 547 S.F. G2, 407 S.F. G3, 2,962 S.F. G4, 1,072 S.F. G5, 1,038 S.F. TOTAL = 6,026 S.F. SOLAR ROOF AREAS: S1, 1475 S.F. S2, 1070 S.F. S3, 1702 S.F. S4, 1253 S.F. S5, 1000 S.F. S6, 1440 S.F. TOTAL = 7,940 S.F. PHASE THREE ROOF AREAS: 25,944 S.F. (HIGHER) = TOTAL 25,944 S.F. GREEN ROOF AREAS: G1, 3,000 S.F. G2, 3,680 S.F. G3, 1,183 S.F. TOTAL = 7,863 S.F. SOLAR ROOF AREAS: S1, 850 S.F. S2, 2606 S.F. S3, 2600 S.F. TOTAL = 6,056 S.F. ROOF PLAN A1.5 ROOF PLAN SCALE: 1" =30'-0" 1 A.1.5 PROJECT NORTH Proj. No: ISSUES REVISIONS 1304.01.02 Issued For: Date: 10-21-2021 Site Plan Application 1155 Pleasant Valley Way West Orange NJ 07052 · · DAVID S. FOWLES, AIA 500 Kings Highway South Cherry Hill, NJ 08034 856.770.1060 office@ kd-arch.com architects KDA

Page 11

CEMENT BD. LAP SIDING COLOR: TBD MAIN LEVEL EL. 427.20' LOWER LEVEL EL. 414.53' ROOF TOP MECHANICAL EQUIPMENT AND EQUIP. SCREEN MAX. 15'-0" ABOVE FIN. ROOF EL. 4" BRICK VENEER COLOR: TBD MTL. FRAME CURTAIN WALL SYSTEM STONE VENEER CLADDING COLOR: TBD ROOF LEVEL EL. 478.56' CEMENT BD. PANEL CLADDING, COLOR: TBD ROOF TOP MECHANICAL WITH EQUIPMENT SCREEN INDEPENDENT LIVING APARTMENTS ENTRANCE FACADE SIGN #5 38 S.F. FACADE SIGN #2 40 S.F. AV. GRADE LEVEL EL. 422.29' CALCULATED ILU BUILDING PHASE 2 AND 3 HEIGHT: 478.56' TOP OF ROOF -422.29' AVERAGE BUILDING GRADE 56.27' MAIN LEVEL EL. 427.20' LOWER LEVEL EL. 414.53' AV. GRADE EL. 422.29' MAIN ENTRANCEFACADE SIGN #3 48 S.F. ROOF LEVEL EL. 480.06' CEMENT BD. LAP SIDING COLOR: TBD CEMENT BD. PANEL CLADDING, COLOR: TBD 4" BRICK VENEER COLOR: TBD MTL. SEAM ROOF AT PORCH AND PORTE COCHERE ROOF TOP MECHANICAL EQUIPMENT WITH SCREEN MAIN LEVEL EL. 427.20' LOWER LEVEL EL. 414.53' ROOF LEVEL EL. 480.06' AV. GRADE LEVEL EL. 422.29' MAIN LEVEL EL. 427.20' LOWER LEVEL EL. 414.53' AV. GRADE LEVEL EL. 422.29' ROOF LEVEL EL. 478.56' MAIN ENTRANCE FACADE SIGN #1 42 S.F. GARAGE ENTRANCE CEMENT BD. PANEL CLADDING, COLOR: TBD 4" BRICK VENEER COLOR: TBD ROOF TOP MECHANICAL EQUIPMENT WITH SCREEN FACADE SIGN #3 48 S.F. CEMENT BD. LAP SIDING COLOR: TBD CEMENT BD. PANEL CLADDING, COLOR: TBD INDEPENDENT LIVINGHEALTH CENTER MTL. SEAM ROOF AT PORCH AND PORTE COCHERE CALCULATED ILU BUILDING PHASE 2 AND 3 HEIGHT: 478.56' TOP OF ROOF -422.29' AVERAGE BUILDING GRADE 56.27' CALCULATED PHASE 1, H.C. BUILDING HEIGHT: 480.06' TOP OF ROOF -422.29' AVERAGE BUILDING GRADE 57.77' 1/2.1 2/2.0 3/2.0 3/2.1 2/2.1 1/2.0 METAL EQUIPMENT SCREEN LOUVER WITH KYNAR PAINT FINISH, COLOR TBD ROOFTOP AIR-HANDLING UNIT FINISHED ROOF SURFACE ROOF TOP MECHANICAL EQUIPMENT AND EQUIP. SCREEN MAX. 15'-0" ABOVE FIN. ROOF EL. METAL EQUIPMENT SCREEN LOUVER WITH KYNAR PAINT FINISH, COLOR TBD EXTERIOR ELEVATIONS A2.0 PARTIAL SOUTH ELEVATION SCALE: 1" =20'-0" 2 A.2.0 PARTIAL SOUTH ELEVATION SCALE: 1" =20'-0" 3 A.2.0 North KEY PLAN N.T.S Proj. No: ISSUES REVISIONS 1304.01.02 Issued For: Date: 10-21-2021 Site Plan Application 1155 Pleasant Valley Way West Orange NJ 07052 · · DAVID S. FOWLES, AIA 500 Kings Highway South Cherry Hill, NJ 08034 856.770.1060 office@ kd-arch.com architects KDA EAST ELEVATION SCALE: 1" =20'-0" 1 A.2.0 ROOF SCREEN SECTION AND ELEVATION DETAIL SCALE: 3/16"

File revisions (1)