IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF THE SC-310 SYSTEM 1. STORMTECH SC-310 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A PRE-CONSTRUCTION MEETING WITH THE INSTALLERS. 2. STORMTECH SC-310 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS. STORMTECH RECOMMENDS 3 BACKFILL METHODS: · STONESHOOTER LOCATED OFF THE CHAMBER BED. · BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE. · BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR. 4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS. 5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE. 6. MAINTAIN MINIMUM - SPACING BETWEEN THE CHAMBER ROWS. 7. EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE 3/4-2" (20-50 mm). 8. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGN ENGINEER. 9. ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF. NOTES FOR CONSTRUCTION EQUIPMENT 1. STORMTECH SC-310 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 2. THE USE OF CONSTRUCTION EQUIPMENT OVER SC-310 & SC-740 CHAMBERS IS LIMITED: · NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS. · NO RUBBER TIRED LOADERS, DUMP TRUCKS, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". · WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 3. FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING. USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO THE CHAMBERS AND IS NOT AN ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH STANDARD WARRANTY. CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT. SC-310 STORMTECH
ARE NOT COVERED UNDER THE STORMTECH STANDARD WARRANTY. CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT. SC-310 STORMTECH CHAMBER SPECIFICATIONS 1. CHAMBERS SHALL BE STORMTECH SC-310. 2. CHAMBERS SHALL BE ARCH-SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT-MODIFIED POLYPROPYLENE OR POLYETHYLENE COPOLYMERS. 3. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2922 (POLETHYLENE) OR ASTM F2418 (POLYPROPYLENE), "STANDARD SPECIFICATION FOR CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 4. CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORTS THAT WOULD IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION. 5. THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1) LONG-DURATION DEAD LOADS AND 2) SHORT-DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION FOR IMPACT AND MULTIPLE VEHICLE PRESENCES. 6. CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". LOAD CONFIGURATIONS SHALL INCLUDE: 1) INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2) MAXIMUM PERMANENT (75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK. 7. REQUIREMENTS FOR HANDLING AND INSTALLATION: · TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. · TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”. · TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT SHALL BE GREATER THAN OR EQUAL TO 400 LBS/FT/%. THE ASC IS DEFINED IN SECTION 6.2.8 OF ASTM F2418. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. 8. ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGN ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL
LY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGN ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE PROJECT SITE AS FOLLOWS: · THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER. · THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787 AND BY SECTIONS 3 AND 12.12 OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FOR THERMOPLASTIC PIPE. · THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2922 SHALL BE USED FOR PERMANENT DEAD LOAD DESIGN EXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN. 9. CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY. 6" (150 mm) SC-310 TECHNICAL SPECIFICATIONS PART # STUB A B C SC310EPE06T / SC310EPE06TPC 6" (150 mm) 9.6" (244 mm) 5.8" (147 mm) --- SC310EPE06B / SC310EPE06BPC --- 0.5" (13 mm) SC310EPE08T / SC310EPE08TPC 8" (200 mm) 11.9" (302 mm) 3.5" (89 mm) --- SC310EPE08B / SC310EPE08BPC --- 0.6" (15 mm) SC310EPE10T / SC310EPE10TPC 10" (250 mm) 12.7" (323 mm) 1.4" (36 mm) --- SC310EPE10B / SC310EPE10BPC --- 0.7" (18 mm) SC310EPE12B 12" (300 mm) 13.5" (343 mm) --- 0.9" (23 mm) SC310EPE12BR 12" (300 mm) 13.5" (343 mm) --- 0.9" (23 mm) ALL STUBS, EXCEPT FOR THE SC310EPE12B ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT 1-888-892-2694. * FOR THE SC310EPE12B THE 12" (300 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 0.25" (6 mm). BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL. NOTE: ALL DIMENSIONS ARE NOMINAL NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH) 34.0" X 16.0" X 85.4" (864 mm X 406 mm X 2169 mm) CHAMBER STORAGE 14.7 CUBIC FEET (0.42 m³) MINIMUM INSTALLED STORAGE* 31.0 CUBIC FEET (0.88 m³) WEIGHT 35.0 lbs. (16.8 kg) *ASSUMES 6" (152 mm) ABOVE, BELOW, AND BETWEEN CHAMBERS PRE-FAB STUB AT BOTTOM OF END CAP WITH FLAMP END WITH "BR" PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" PRE CORED END CAPS END WITH "PC" 34.0" (864
ITH FLAMP END WITH "BR" PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" PRE CORED END CAPS END WITH "PC" 34.0" (864 mm) 16.0" (406 mm) 90.7" (2304 mm) ACTUAL LENGTH 85.4" (2169 mm) INSTALLED LENGTH BUILD ROW IN THIS DIRECTION A A B C 9.9" (251 mm) 15.6" (396 mm) OVERLAP NEXT CHAMBER HERE (OVER SMALL CORRUGATION) START END 2INSERTA-TEE SIDE INLET DETAIL INSERTA TEE CONNECTION CONVEYANCE PIPE MATERIAL MAY VARY (PVC, HDPE, ETC.) PLACE ADSPLUS WOVEN GEOTEXTILE (CENTERED ON INSERTA-TEE INLET) OVER BEDDING STONE FOR SCOUR PROTECTION AT SIDE INLET CONNECTIONS. GEOTEXTILE MUST EXTEND 6" (150 mm) PAST CHAMBER FOOT INSERTA TEE TO BE INSTALLED, CENTERED OVER CORRUGATION SIDE VIEWSECTION A-A A A DO NOT INSTALL INSERTA-TEE AT CHAMBER JOINTS (X) CHAMBER MAX DIAMETER OF INSERTA TEE HEIGHT FROM BASE OF CHAMBER (X) SC-310 6" (150 mm) 4" (100 mm) SC-740 10" (250 mm) 4" (100 mm) DC-780 10" (250 mm) 4" (100 mm) MC-3500 12" (300 mm) 6" (150 mm) MC-4500 12" (300 mm) 8" (200 mm) MC-7200 12" (300 mm) 8" (200 mm) INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPS GASKETED & SOLVENT WELD, N-12, HP STORM, C-900 OR DUCTILE IRON NOTES: · PART NUMBERS WILL VARY BASED ON INLET PIPE MATERIALS. CONTACT STORMTECH FOR MORE INFORMATION. · CONTACT ADS ENGINEERING SERVICES IF INSERTA TEE INLET MUST BE RAISED AS NOT ALL INVERTS ARE POSSIBLE. 6 UNDERDRAIN DETAIL A A B B SECTION A-A SECTION B-B NUMBER AND SIZE OF UNDERDRAINS PER SITE DESIGN ENGINEER 4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS 6" (150 mm) TYP FOR SC-740, DC-780, MC-3500, MC-4500 & MC-7200 SYSTEMS OUTLET MANIFOLD STORMTECH END CAP STORMTECH CHAMBERS STORMTECH CHAMBER STORMTECH END CAP DUAL WALL PERFORATED HDPE UNDERDRAIN ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE FOUNDATION STONE BENEATH CHAMBERS FOUNDATION STONE BENEATH CHAMBERS 5 4" PVC INSPECTION PORT DETAIL (SC SERIES CHAMBER) NOTE: INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION CREST. STORMTECH CHAMBER CONCRETE COLLAR PAVEMENT 12" (300 mm) MIN WIDTH CONCRETE SLAB 6" (150 mm) MIN THICKNESS 8" NYLOPLAST INSPECTION PORT BODY (PART# 2708AG4IPKIT) OR TRAFFIC RATED BOX W/SOLID LOCKING COVER CONCRETE COLLAR NOT REQUIRED FOR UNPAVED APPLICATIONS 4" (100 mm) SDR 35 PIPE 4" (100 mm) INSERTA TEE TO BE CENTERED ON
ECTION PORT BODY (PART# 2708AG4IPKIT) OR TRAFFIC RATED BOX W/SOLID LOCKING COVER CONCRETE COLLAR NOT REQUIRED FOR UNPAVED APPLICATIONS 4" (100 mm) SDR 35 PIPE 4" (100 mm) INSERTA TEE TO BE CENTERED ON CORRUGATION CREST 4 SC-310 ISOLATOR ROW PLUS DETAIL OPTIONAL INSPECTION PORT SC-310 END CAP COVER ENTIRE ISOLATOR ROW PLUS WITH ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE 5' (1.5 m) MIN WIDE SC-310 CHAMBERSTORMTECH HIGHLY RECOMMENDS FLEXSTORM INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 4' (1.2 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS ELEVATED BYPASS MANIFOLD 12" (300 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE-FABRICATED END CAP WITH FLAMP PART #: SC310EPE12BR SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) NYLOPLAST 3 INSPECTION & MAINTENANCE STEP 1) INSPECT ISOLATOR ROW PLUS FOR SEDIMENT A. INSPECTION PORTS (IF PRESENT) A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4. LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B. ALL ISOLATOR PLUS ROWS B.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUS B.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPE i) MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY ii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2) CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESS A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN C. VACUUM STRUCTURE SUMP AS REQUIRED STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. NOTES 1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN
DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. SC-310 CROSS SECTION DETAIL ACCEPTABLE FILL MATERIALS: STORMTECH SC-310 CHAMBER SYSTEMS PLEASE NOTE: 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 4. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. NOTES: 1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2922 (POLETHYLENE) OR ASTM F2418 (POLYPROPYLENE), "STANDARD SPECIFICATION FOR CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 2. SC-310 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 5. REQUIREMENTS FOR HANDLING AND INSTALLATION: · TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. · TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”. · TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2922 SHALL BE GREATER
THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”. · TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2922 SHALL BE GREATER THAN OR EQUAL TO 400 LBS/FT/%. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT D FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER. ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS. N/A PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PREPARATION REQUIREMENTS. C INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 18" (450 mm) ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER. GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR PROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER. AASHTO M145¹ A-1, A-2-4, A-3 OR AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 BEGIN COMPACTIONS AFTER 12" (300 mm) OF MATERIAL OVER THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN 6" (150 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR PROCESSED AGGREGATE MATERIALS. ROLLER GROSS VEHICLE WEIGHT NOT TO EXCEED 12,000 lbs (53 kN). DYNAMIC FORCE NOT TO EXCEED 20,000 lbs (89 kN). B EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE. CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 NO COMPACTION REQUIRED. A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3 D C B A 18" (450 mm) MIN* 8' (2.4 m) MAX 6" (150 mm) MIN 12" (300 mm) MIN 12" (300 mm) MIN34" (864 mm) 6" (150 mm) MIN ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEAN CRUSHED, ANGULAR STONE IN A & B LAYERS *TO BOTTOM OF
4 m) MAX 6" (150 mm) MIN 12" (300 mm) MIN 12" (300 mm) MIN34" (864 mm) 6" (150 mm) MIN ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEAN CRUSHED, ANGULAR STONE IN A & B LAYERS *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 24" (600 mm). PERIMETER STONE (SEE NOTE 5) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) SC-310 END CAP SUBGRADE SOILS (SEE NOTE 4) PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) DEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 6" (150 mm) MIN 16" (406 mm) **THIS CROSS SECTION DETAIL REPRESENTS MINIMUM REQUIREMENTS FOR INSTALLATION. PLEASE SEE THE LAYOUT SHEET(S) FOR PROJECT SPECIFIC REQUIREMENTS. 1 © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS SCALE: 1" = 200' USGS LOCATION MAP AR AR AR AR DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: BYDATENO. DESCRIPTION ISSUED FOR PERMIT APPLICATION PROPOSED 3-STORY APARTMENT BUILDING 410 MAIN ST, WEST ORANGE, NJ SCALE: SITE FRANKLIN TOWNSHIP, SOMERSET COUNTY, NJ CIVIL & STRUCTURAL ENGINEERS 293 RT. 18 SOUTH, #D-152 EAST BRUNSWICK, NJ 08816 TEL. 347-762-8364 FAX 201-753-5251 ALI@SMBTCONSULTANTS.COM CERTIFICATE OF AUTHORIZATION NO.: 24GA28353100 SHEET: DWG: N.J. PROFESSIONAL ENGINEER LIC. NO. 53255 ALIASGAR RANGWALA, P.E. N DATE: 1/16/2024 OF 13 COPYRIGHT 2022 ALL RIGHTS RESERVED. THE COPY OR REUSE OF THIS DOCUMENT OR ANY PORTION THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SMBT CONSULTANTS. THIS DRAWING IS THE SOLE PROPERTY OF SMBT CONSULTANTS AND HAS BEEN PREPARED SPECIFICALLY FOR USE BY THE OWNER OF THIS PROJECT AT THIS SITE. NEW JERSEY INDUSTRIAL CODE REQUIRES DRILL, OR BLAST - STOP CALL STORMWATER MANAGEMENT DETAILS10 NOT TO SCALE C10
MAIN STREET S16°20'00"W 104.98' S21°20'00"W 20.94' S68°40'00"E 97.52' N11°49'00"E N77°11'00"W LOT 262 LOT 265 LOT 308 LOT 264 LOT 263 LOT 304 LOT 307 84.46' 139.95' CONTAINER CONTAINER RAMP RAMP PROPOSED 3 STORY BUILDING PROPOSED WATER VALVE AND WATER MAIN TO BE INSTALLED PER CITY OF ORANGE STANDARDS EXISTING GAS LINE AND WATER MAIN TO BE ABANDONED PER CITY OF ORANGE STANDARDS SS PROPOSED CLEANOUT TO BE CONNECTED TO CLOSEST POSSIBLE SEWER MANHOLE W W W W W G G G G G PROPOSED GAS LINE TO BE INSTALLED PER CITY OF ORANGE STANDARDS W W W W W PROPOSED WATER FIRE LINE FOR SPRINKLERS CONNECTION, PER CITY OF ORANGE STANDARDS G G PROPOSED GAS METER SS PARK DRIVE NORTH MAIN STREET © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS SCALE: 1" = 200' USGS LOCATION MAP AR AR AR AR DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: BYDATENO. DESCRIPTION ISSUED FOR PERMIT APPLICATION PROPOSED 3-STORY APARTMENT BUILDING 410 MAIN ST, WEST ORANGE, NJ SCALE: SITE FRANKLIN TOWNSHIP, SOMERSET COUNTY, NJ CIVIL & STRUCTURAL ENGINEERS 293 RT. 18 SOUTH, #D-152 EAST BRUNSWICK, NJ 08816 TEL. 347-762-8364 FAX 201-753-5251 ALI@SMBTCONSULTANTS.COM CERTIFICATE OF AUTHORIZATION NO.: 24GA28353100 SHEET: DWG: N.J. PROFESSIONAL ENGINEER LIC. NO. 53255 ALIASGAR RANGWALA, P.E. N DATE: 1/16/2024 OF 13 COPYRIGHT 2022 ALL RIGHTS RESERVED. THE COPY OR REUSE OF THIS DOCUMENT OR ANY PORTION THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SMBT CONSULTANTS. THIS DRAWING IS THE SOLE PROPERTY OF SMBT CONSULTANTS AND HAS BEEN PREPARED SPECIFICALLY FOR USE BY THE OWNER OF THIS PROJECT AT THIS SITE. NEW JERSEY INDUSTRIAL CODE REQUIRES DRILL, OR BLAST - STOP CALL 0 FEET 10 20 SCALE 1"-10' UTILITIES PLAN 1" = 10'1 UTILITIES PLAN LEGEND PROPOSED BUILDING PROPOSED CONCRETE PROPOSED RETAINING WALL PROPERTY LINE N 11 PROPOSED WATER LINE PROPOSED SANITARY SEWER PROPOSED GAS LINE W SS G PROPOSED WATER VALVE UTILITIES NOTES: 1. CONTRACTOR TO FIELD VERIFY LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. IF ANY DISCREPANCY OCCURS THAT AFFECTS THE DESIGN, CONTACT ENGINEER OF PROJECT TO PROVIDE A SITE VISIT AND DESIGN UPDATE. 2. UTILITIES DIAMETERS TO BE DESIGNED BY OTHERS. NOT PART OF CURRENT PROJECT. 1" = 10' C11
S16°20'00"W 104.98' S21°20'00"W 20.94' S68°40'00"E 97.52' N11°49'00"E N77°11'00"W LOT 262 LOT 265 LOT 308 LOT 264 LOT 263 LOT 304 LOT 307 84.46' 139.95' CONTAINER CONTAINER RAMP RAMP PROPOSED 3 STORY BUILDING 4 BXV 4 BXV IVY 52 LF 4 BXV 4 BXV3 CLA 2 CLA 2 CLA 3 CLA PARK DRIVE NORTH MAIN STREET 3 CLA © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS SCALE: 1" = 200' USGS LOCATION MAP AR AR AR AR DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: BYDATENO. DESCRIPTION ISSUED FOR PERMIT APPLICATION PROPOSED 3-STORY APARTMENT BUILDING 410 MAIN ST, WEST ORANGE, NJ SCALE: SITE FRANKLIN TOWNSHIP, SOMERSET COUNTY, NJ CIVIL & STRUCTURAL ENGINEERS 293 RT. 18 SOUTH, #D-152 EAST BRUNSWICK, NJ 08816 TEL. 347-762-8364 FAX 201-753-5251 ALI@SMBTCONSULTANTS.COM CERTIFICATE OF AUTHORIZATION NO.: 24GA28353100 SHEET: DWG: N.J. PROFESSIONAL ENGINEER LIC. NO. 53255 ALIASGAR RANGWALA, P.E. N DATE: 1/16/2024 OF 13 COPYRIGHT 2022 ALL RIGHTS RESERVED. THE COPY OR REUSE OF THIS DOCUMENT OR ANY PORTION THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SMBT CONSULTANTS. THIS DRAWING IS THE SOLE PROPERTY OF SMBT CONSULTANTS AND HAS BEEN PREPARED SPECIFICALLY FOR USE BY THE OWNER OF THIS PROJECT AT THIS SITE. NEW JERSEY INDUSTRIAL CODE REQUIRES DRILL, OR BLAST - STOP CALL 0 FEET 10 20 SCALE 1"-10' LANDSCAPE PLAN 1" = 10'1 LANDSCAPE PLAN LEGEND PROPOSED BUILDING PROPOSED CONCRETE PROPOSED RETAINING WALL PROPERTY LINE N 12 FINAL SYMBOL BOTANICAL NAME COMMON NAME SIZE CONTAINER SPACING COMMENTS QUANTITY PLANT SCHEDULE AMERICAN BOXWOOD SHRUBS AND GROUNDCOVER BUXUS SEMPERVIRENSBXW44 3'-4' HT. 3 GAL. CONT. 3'-5' O.C. CLETHRA ALNIFOLIACLA13 CLETHRA ALNIFOLIA (SUMMERSWEET) 1'-2' HT. 3 GAL. CONT. 4'-6' O.C. MULCH SHREDDED HARDWOOD MULCH -MULCH-- - GENERAL LANDSCAPING AND SEEDING NOTES: 1. ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES WHERE NO OTHER SURFACE TREATMENT IS SPECIFIED SHALL BE SEEDED WITH AUTUMN BENTGRASS (APB ECOTYPE) AT 30 LBS/ACRE. 2. CONTRACTOR SHALL ADJUST PLANT LOCATIONS AS NECESSARY BASED ON LOCATIONS OF UTILITY STRUCTURES. CONTRACTOR SHALL LAYOUT PLANT MATERIALS AND ENGINEER SHALL APPROVE LAYOUT PRIOR TO INSTALLATION. 3. PLANT MATERIAL SHALL BE INSPECTED UPON DELIVERY. PLANT MATERIAL THAT DOES NOT MEET THE SPECIFICATIONS FOR SIZE AND HEALTH SHALL BE REJECTED AND REPLACED AT CONTRACTOR'S EXPENSE. 4. CONTRACTOR SHALL MAINTAIN PLANT MATERIALS FOR A