Supporting Documentation · Jul 16, 2024
Drainage Report
49ec4d438ccec1138eb1cca049f5c30de587fe1769e55e2560bd7c9eea462d6cIndexed text
AS SHOWN PWA PWA
BCA BASIN 2-6 DB 2-6 OL #3 Designed by
Checked by Drawn by Proj. No. OL #2 OL #1
Scale Date BAYOWSKI ROAD E
E TERRAC KUZIK DRIVE FOWLE R DRIV PRELIMINARY AND FINAL SITE PLAN
PRELIMINARY AND FINAL SITE PLAN E NE BAKELY LA FT LU LAPIS CIRCLE PRE-DEVELOPMENT Tc
DA TO BASIN 1: 32.0 MIN DA TO BASIN 2: 32.0 MIN DA TO BASIN 3: 19.4 MIN DA TO 4: 15.9 MIN DA TO 5: 11.5 MIN LOD: 1,234,888.2 SF DA TO 6:
DA TO 6: 17.6 MIN DA TO CULVERT : 19.1 MIN 28.35 Acres DA-1 - POINT OF ANALYSIS R Know what's below.
SHEET 1 OF 3 Call before you dig.
SLAYBACK TERRACE PAUL W. ANDERSON
File revisions (1)
- Sep 29, 2026
49ec4d438cce35,736,806 bytes