Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text
Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Printed 5/13/2024 Page 20 Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Reach 3R: TD-01 Inflow Area = 0.147 ac, 0.00% Impervious, Inflow Depth = 0.13" for WQ event Inflow = 0.04 cfs @ 1.17 hrs, Volume= 0.002 af Outflow = 0.04 cfs @ 1.18 hrs, Volume= 0.002 af, Atten= 0%, Lag= 0.5 min Routed to Pond 12P : SD-03, SD-04, SD-05 Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs Max. Velocity= 1.55 fps, Min. Travel Time= 0.7 min Avg. Velocity = 1.31 fps, Avg. Travel Time= 0.9 min Peak Storage= 2 cf @ 1.18 hrs Average Depth at Peak Storage= 0.02' , Surface Width= 1.50' Bank-Full Depth= 1.50' Flow Area= 2.3 sf, Capacity= 30.28 cfs 1.50' x 1.50' deep channel, n= 0.012 Concrete pipe, finished Length= 67.2' Slope= 0.0298 '/' Inlet Invert= 606.00', Outlet Invert= 604.00' Reach 3R: TD-01 Flow (cfs) Hydrograph Inflow Outflow 0.04 cfs 0.046 0.044 0.042 0.04 0.038 0.036 0.034 0.032 0.03 0.028 0.026 0.024 0.022 0.02 0.018 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 Inflow Area=0.147 ac Avg. Flow Depth=0.02' Max Vel=1.55 fps n=0.012 L=67.2' S=0.0298 '/' Capacity=30.28 cfs 0.04 cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24
Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Hydrograph for Reach 3R: TD-01 Time (hours) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00 10.50 11.00 11.50 12.00 12.50 13.00 13.50 14.00 14.50 15.00 15.50 16.00 16.50 17.00 17.50 18.00 18.50 19.00 19.50 20.00 20.50 21.00 21.50 22.00 22.50 23.00 23.50 24.00 Inflow (cfs) 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Elevation (feet) 606.00 606.00 606.00 606.01 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 Outflow (cfs) 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Printed 5/13/2024 Page 21
Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Printed 5/13/2024 Page 22 Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Reach 4R: TD-02 Inflow Area = 0.086 ac, 0.00% Impervious, Inflow Depth = 0.10" for WQ event Inflow = 0.02 cfs @ 1.15 hrs, Volume= 0.001 af Outflow = 0.02 cfs @ 1.15 hrs, Volume= 0.001 af, Atten= 1%, Lag= 0.5 min Routed to Pond 15P : SD-06, SD-07, SD-08 Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs Max. Velocity= 1.24 fps, Min. Travel Time= 0.5 min Avg. Velocity = 1.24 fps, Avg. Travel Time= 0.5 min Peak Storage= 1 cf @ 1.15 hrs Average Depth at Peak Storage= 0.01' , Surface Width= 1.50' Bank-Full Depth= 1.50' Flow Area= 2.3 sf, Capacity= 29.34 cfs 1.50' x 1.50' deep channel, n= 0.012 Concrete pipe, finished Length= 34.0' Slope= 0.0279 '/' Inlet Invert= 604.25', Outlet Invert= 603.30' Reach 4R: TD-02 Flow (cfs) Hydrograph Inflow Outflow 0.02 cfs 0.021 0.02 0.019 0.018 0.017 0.016 0.015 0.014 0.013 0.012 0.011 0.01 0.009 0.008 0.007 0.006 0.005 0.004 0.003 0.002 0.001 0 Inflow Area=0.086 ac Avg. Flow Depth=0.01' Max Vel=1.24 fps n=0.012 L=34.0' S=0.0279 '/' Capacity=29.34 cfs 0.02 cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24
Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Hydrograph for Reach 4R: TD-02 Time (hours) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00 10.50 11.00 11.50 12.00 12.50 13.00 13.50 14.00 14.50 15.00 15.50 16.00 16.50 17.00 17.50 18.00 18.50 19.00 19.50 20.00 20.50 21.00 21.50 22.00 22.50 23.00 23.50 24.00 Inflow (cfs) 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Elevation (feet) 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 Outflow (cfs) 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Printed 5/13/2024 Page 23
Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Printed 5/13/2024 Page 24 Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Reach 5R: TD-03 Inflow Area = 0.236 ac, 0.00% Impervious, Inflow Depth = 0.07" for WQ event Inflow = 0.03 cfs @ 1.23 hrs, Volume= 0.001 af Outflow = 0.03 cfs @ 1.28 hrs, Volume= 0.001 af, Atten= 6%, Lag= 2.9 min Routed to Pond 16P : SD-09, SD-10 Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs Max. Velocity= 0.72 fps, Min. Travel Time= 3.1 min Avg. Velocity = 0.55 fps, Avg. Travel Time= 4.0 min Peak Storage= 5 cf @ 1.28 hrs Average Depth at Peak Storage= 0.03' , Surface Width= 1.50' Bank-Full Depth= 1.50' Flow Area= 2.3 sf, Capacity= 11.66 cfs 1.50' x 1.50' deep channel, n= 0.012 Concrete pipe, finished Length= 133.7' Slope= 0.0044 '/' Inlet Invert= 601.81', Outlet Invert= 601.22' Reach 5R: TD-03 Hydrograph 0.032 Inflow Outflow 0.03 cfs Inflow Area=0.236 ac Avg. Flow Depth=0.03' Max Vel=0.72 fps n=0.012 L=133.7' S=0.0044 '/' Capacity=11.66 cfs 0.03 0.03 cfs 0.028 0.026 0.024 0.022 Flow (cfs) 0.02 0.018 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24
Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Hydrograph for Reach 5R: TD-03 Time (hours) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00 10.50 11.00 11.50 12.00 12.50 13.00 13.50 14.00 14.50 15.00 15.50 16.00 16.50 17.00 17.50 18.00 18.50 19.00 19.50 20.00 20.50 21.00 21.50 22.00 22.50 23.00 23.50 24.00 Inflow (cfs) 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 0 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Elevation (feet) 601.81 601.81 601.81 601.83 601.82 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 Outflow (cfs) 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Printed 5/13/2024 Page 25
Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Printed 5/13/2024 Page 26 Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Reach 6R: TD-04 Inflow Area = 0.183 ac, 0.00% Impervious, Inflow Depth = 0.08" for WQ event Inflow = 0.03 cfs @ 1.26 hrs, Volume= 0.001 af Outflow = 0.03 cfs @ 1.27 hrs, Volume= 0.001 af, Atten= 0%, Lag= 0.4 min Routed to Pond 20P : SD-11, SD-12 Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs Max. Velocity= 1.04 fps, Min. Travel Time= 0.9 min Avg. Velocity = 0.96 fps, Avg. Travel Time= 1.0 min Peak Storage= 1 cf @ 1.27 hrs Average Depth at Peak Storage= 0.02' , Surface Width= 1.50' Bank-Full Depth= 1.50' Flow Area= 2.3 sf, Capacity= 22.41 cfs 1.50' x 1.50' deep channel, n= 0.012 Concrete pipe, finished Length= 54.6' Slope= 0.0163 '/' Inlet Invert= 600.77', Outlet Invert= 599.88' Reach 6R: TD-04 Hydrograph 0.028 Inflow Outflow 0.03 cfs Inflow Area=0.183 ac Avg. Flow Depth=0.02' Max Vel=1.04 fps n=0.012 L=54.6' S=0.0163 '/' Capacity=22.41 cfs 0.03 cfs 0.026 0.024 0.022 0.02 Flow (cfs) 0.018 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24
Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Hydrograph for Reach 6R: TD-04 Time (hours) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00 10.50 11.00 11.50 12.00 12.50 13.00 13.50 14.00 14.50 15.00 15.50 16.00 16.50 17.00 17.50 18.00 18.50 19.00 19.50 20.00 20.50 21.00 21.50 22.00 22.50 23.00 23.50 24.00 Inflow (cfs) 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Elevation (feet) 600.77 600.77 600.77 600.78 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 Outflow (cfs) 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Printed 5/13/2024 Page 27
Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Printed 5/13/2024 Page 28 Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Pond 7P: O-1A Inflow Area = Inflow = Primary = 1.409 ac, 2.20% Impervious, Inflow Depth = 0.08" for WQ event 0.18 cfs @ 1.23 hrs, Volume= 0.010 af 0.18 cfs @ 1.23 hrs, Volume= 0.010 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs Pond 7P: O-1A Flow (cfs) Hydrograph 0.2 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 Inflow Primary 0.18 cfs Inflow Area=1.409 ac 0.18 cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24
Post-Developed (O-1A) West Orange HydroCAD_Post NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Hydrograph for Pond 7P: O-1A Time (hours) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00 10.50 11.00 11.50 12.00 12.50 13.00 13.50 14.00 14.50 15.00 15.50 16.00 16.50 17.00 17.50 18.00 18.50 19.00 19.50 20.00 20.50 21.00 21.50 22.00 22.50 23.00 23.50 24.00 Inflow Elevation (cfs) (feet) 0.00 0.00 0.02 0.09 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Primary (cfs) 0.00 0.00 0.02 0.09 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Printed 5/13/2024 Page 29
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes