Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Printed 5/13/2024 Page 20 Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Reach 3R: TD-01 Inflow Area = 0.147 ac, 0.00% Impervious, Inflow Depth = 0.13" for WQ event Inflow = 0.04 cfs @ 1.17 hrs, Volume= 0.002 af Outflow = 0.04 cfs @ 1.18 hrs, Volume= 0.002 af, Atten= 0%, Lag= 0.5 min Routed to Pond 12P : SD-03, SD-04, SD-05 Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs Max. Velocity= 1.55 fps, Min. Travel Time= 0.7 min Avg. Velocity = 1.31 fps, Avg. Travel Time= 0.9 min Peak Storage= 2 cf @ 1.18 hrs Average Depth at Peak Storage= 0.02' , Surface Width= 1.50' Bank-Full Depth= 1.50' Flow Area= 2.3 sf, Capacity= 30.28 cfs 1.50' x 1.50' deep channel, n= 0.012 Concrete pipe, finished Length= 67.2' Slope= 0.0298 '/' Inlet Invert= 606.00', Outlet Invert= 604.00' Reach 3R: TD-01 Flow (cfs) Hydrograph Inflow Outflow 0.04 cfs 0.046 0.044 0.042 0.04 0.038 0.036 0.034 0.032 0.03 0.028 0.026 0.024 0.022 0.02 0.018 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 Inflow Area=0.147 ac Avg. Flow Depth=0.02' Max Vel=1.55 fps n=0.012 L=67.2' S=0.0298 '/' Capacity=30.28 cfs 0.04 cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24

Page 294

Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Hydrograph for Reach 3R: TD-01 Time (hours) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00 10.50 11.00 11.50 12.00 12.50 13.00 13.50 14.00 14.50 15.00 15.50 16.00 16.50 17.00 17.50 18.00 18.50 19.00 19.50 20.00 20.50 21.00 21.50 22.00 22.50 23.00 23.50 24.00 Inflow (cfs) 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Elevation (feet) 606.00 606.00 606.00 606.01 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 606.00 Outflow (cfs) 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Printed 5/13/2024 Page 21

Page 295

Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Printed 5/13/2024 Page 22 Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Reach 4R: TD-02 Inflow Area = 0.086 ac, 0.00% Impervious, Inflow Depth = 0.10" for WQ event Inflow = 0.02 cfs @ 1.15 hrs, Volume= 0.001 af Outflow = 0.02 cfs @ 1.15 hrs, Volume= 0.001 af, Atten= 1%, Lag= 0.5 min Routed to Pond 15P : SD-06, SD-07, SD-08 Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs Max. Velocity= 1.24 fps, Min. Travel Time= 0.5 min Avg. Velocity = 1.24 fps, Avg. Travel Time= 0.5 min Peak Storage= 1 cf @ 1.15 hrs Average Depth at Peak Storage= 0.01' , Surface Width= 1.50' Bank-Full Depth= 1.50' Flow Area= 2.3 sf, Capacity= 29.34 cfs 1.50' x 1.50' deep channel, n= 0.012 Concrete pipe, finished Length= 34.0' Slope= 0.0279 '/' Inlet Invert= 604.25', Outlet Invert= 603.30' Reach 4R: TD-02 Flow (cfs) Hydrograph Inflow Outflow 0.02 cfs 0.021 0.02 0.019 0.018 0.017 0.016 0.015 0.014 0.013 0.012 0.011 0.01 0.009 0.008 0.007 0.006 0.005 0.004 0.003 0.002 0.001 0 Inflow Area=0.086 ac Avg. Flow Depth=0.01' Max Vel=1.24 fps n=0.012 L=34.0' S=0.0279 '/' Capacity=29.34 cfs 0.02 cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24

Page 296

Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Hydrograph for Reach 4R: TD-02 Time (hours) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00 10.50 11.00 11.50 12.00 12.50 13.00 13.50 14.00 14.50 15.00 15.50 16.00 16.50 17.00 17.50 18.00 18.50 19.00 19.50 20.00 20.50 21.00 21.50 22.00 22.50 23.00 23.50 24.00 Inflow (cfs) 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Elevation (feet) 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 604.25 Outflow (cfs) 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Printed 5/13/2024 Page 23

Page 297

Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Printed 5/13/2024 Page 24 Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Reach 5R: TD-03 Inflow Area = 0.236 ac, 0.00% Impervious, Inflow Depth = 0.07" for WQ event Inflow = 0.03 cfs @ 1.23 hrs, Volume= 0.001 af Outflow = 0.03 cfs @ 1.28 hrs, Volume= 0.001 af, Atten= 6%, Lag= 2.9 min Routed to Pond 16P : SD-09, SD-10 Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs Max. Velocity= 0.72 fps, Min. Travel Time= 3.1 min Avg. Velocity = 0.55 fps, Avg. Travel Time= 4.0 min Peak Storage= 5 cf @ 1.28 hrs Average Depth at Peak Storage= 0.03' , Surface Width= 1.50' Bank-Full Depth= 1.50' Flow Area= 2.3 sf, Capacity= 11.66 cfs 1.50' x 1.50' deep channel, n= 0.012 Concrete pipe, finished Length= 133.7' Slope= 0.0044 '/' Inlet Invert= 601.81', Outlet Invert= 601.22' Reach 5R: TD-03 Hydrograph 0.032 Inflow Outflow 0.03 cfs Inflow Area=0.236 ac Avg. Flow Depth=0.03' Max Vel=0.72 fps n=0.012 L=133.7' S=0.0044 '/' Capacity=11.66 cfs 0.03 0.03 cfs 0.028 0.026 0.024 0.022 Flow (cfs) 0.02 0.018 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24

Page 298

Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Hydrograph for Reach 5R: TD-03 Time (hours) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00 10.50 11.00 11.50 12.00 12.50 13.00 13.50 14.00 14.50 15.00 15.50 16.00 16.50 17.00 17.50 18.00 18.50 19.00 19.50 20.00 20.50 21.00 21.50 22.00 22.50 23.00 23.50 24.00 Inflow (cfs) 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 0 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Elevation (feet) 601.81 601.81 601.81 601.83 601.82 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 601.81 Outflow (cfs) 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Printed 5/13/2024 Page 25

Page 299

Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Printed 5/13/2024 Page 26 Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Reach 6R: TD-04 Inflow Area = 0.183 ac, 0.00% Impervious, Inflow Depth = 0.08" for WQ event Inflow = 0.03 cfs @ 1.26 hrs, Volume= 0.001 af Outflow = 0.03 cfs @ 1.27 hrs, Volume= 0.001 af, Atten= 0%, Lag= 0.4 min Routed to Pond 20P : SD-11, SD-12 Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs Max. Velocity= 1.04 fps, Min. Travel Time= 0.9 min Avg. Velocity = 0.96 fps, Avg. Travel Time= 1.0 min Peak Storage= 1 cf @ 1.27 hrs Average Depth at Peak Storage= 0.02' , Surface Width= 1.50' Bank-Full Depth= 1.50' Flow Area= 2.3 sf, Capacity= 22.41 cfs 1.50' x 1.50' deep channel, n= 0.012 Concrete pipe, finished Length= 54.6' Slope= 0.0163 '/' Inlet Invert= 600.77', Outlet Invert= 599.88' Reach 6R: TD-04 Hydrograph 0.028 Inflow Outflow 0.03 cfs Inflow Area=0.183 ac Avg. Flow Depth=0.02' Max Vel=1.04 fps n=0.012 L=54.6' S=0.0163 '/' Capacity=22.41 cfs 0.03 cfs 0.026 0.024 0.022 0.02 Flow (cfs) 0.018 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24

Page 300

Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Hydrograph for Reach 6R: TD-04 Time (hours) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00 10.50 11.00 11.50 12.00 12.50 13.00 13.50 14.00 14.50 15.00 15.50 16.00 16.50 17.00 17.50 18.00 18.50 19.00 19.50 20.00 20.50 21.00 21.50 22.00 22.50 23.00 23.50 24.00 Inflow (cfs) 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Elevation (feet) 600.77 600.77 600.77 600.78 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 600.77 Outflow (cfs) 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Printed 5/13/2024 Page 27

Page 301

Post-Developed (O-1A) NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" West Orange HydroCAD_Post Printed 5/13/2024 Page 28 Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Summary for Pond 7P: O-1A Inflow Area = Inflow = Primary = 1.409 ac, 2.20% Impervious, Inflow Depth = 0.08" for WQ event 0.18 cfs @ 1.23 hrs, Volume= 0.010 af 0.18 cfs @ 1.23 hrs, Volume= 0.010 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.0100 hrs Pond 7P: O-1A Flow (cfs) Hydrograph 0.2 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 Inflow Primary 0.18 cfs Inflow Area=1.409 ac 0.18 cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24

Page 302

Post-Developed (O-1A) West Orange HydroCAD_Post NJ DEP 2-hr WQ Rainfall=1.25", P2=3.42" Prepared by Burns & McDonnell HydroCAD® 10.20-4b s/n 08510 © 2023 HydroCAD Software Solutions LLC Hydrograph for Pond 7P: O-1A Time (hours) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00 10.50 11.00 11.50 12.00 12.50 13.00 13.50 14.00 14.50 15.00 15.50 16.00 16.50 17.00 17.50 18.00 18.50 19.00 19.50 20.00 20.50 21.00 21.50 22.00 22.50 23.00 23.50 24.00 Inflow Elevation (cfs) (feet) 0.00 0.00 0.02 0.09 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Primary (cfs) 0.00 0.00 0.02 0.09 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Printed 5/13/2024 Page 29