Supporting Documentation · Jul 30, 2024
Revised Stormwater Management Report
69ec9df8b1f4567abd2a92749a074a179a57821dd07f0cd16dd61242156a3c29Indexed text
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 120 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Stage-Discharge for Pond 21P: Basin 3 Elevation (feet) 559.00 559.05 559.10 559.15 559.20 559.25 559.30 559.35 559.40 559.45 559.50 559.55 559.60 559.65 559.70 559.75 559.80 559.85 559.90 559.95 560.00 560.05 560.10 560.15 560.20 560.25 560.30 560.35 560.40 560.45 560.50 560.55 560.60 560.65 560.70 560.75 560.80 560.85 560.90 560.95 561.00 561.05 561.10 561.15 Discharge (cfs) 0.00 1.21 1.21 1.21 1.21 1.28 1.50 1.82 2.20 2.64 3.12 3.65 4.22 4.82 5.46 6.12 6.82 7.54 8.30 9.07 9.87 10.69 11.53 12.40 13.28 14.18 15.10 16.03 16.99 17.96 18.94 19.94 20.95 21.98 23.02 24.07 25.14 26.21 27.30 28.40 29.51 30.63 31.76 32.90 Discarded (cfs) 0.00 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 Primary (cfs) 0.00 0.00 0.00 0.00 0.00 0.07 0.29 0.61 0.99 1.43 1.91 2.44 3.01 3.61 4.25 4.91 5.61 6.33 7.09 7.86 8.66 9.48 10.32 11.19 12.07 12.97 13.89 14.82 15.78 16.75 17.73 18.73 19.74 20.77 21.81 22.86 23.93 25.00 26.09 27.19 28.30 29.42 30.55 31.69
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 121 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 21P: Basin 3 Elevation (feet) 559.00 559.05 559.10 559.15 559.20 559.25 559.30 559.35 559.40 559.45 559.50 559.55 559.60 559.65 559.70 559.75 559.80 559.85 559.90 559.95 560.00 560.05 560.10 560.15 560.20 560.25 560.30 560.35 560.40 560.45 560.50 560.55 560.60 560.65 560.70 560.75 560.80 560.85 560.90 560.95 561.00 561.05 561.10 561.15 Surface (sq-ft) 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 5,227 Storage (cubic-feet) 0 105 209 314 418 523 627 732 836 941 1,045 1,150 1,254 1,359 1,464 1,568 1,673 1,777 1,882 1,986 2,091 2,195 2,300 2,404 2,509 2,614 2,718 2,823 2,927 3,032 3,136 3,241 3,345 3,450 3,554 3,659 3,763 3,868 3,973 4,077 4,182 4,286 4,391 4,495
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 122 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Summary for Pond 22P: Basin 4 Inflow Area = 57,587 sf, 86.93% Impervious, Inflow Depth = 4.66" for 10-Year event Inflow = 6.28 cfs @ 12.12 hrs, Volume= 22,381 cf Outflow = 1.47 cfs @ 12.39 hrs, Volume= 22,381 cf, Atten= 77%, Lag= 16.5 min Discarded = 1.13 cfs @ 11.72 hrs, Volume= 21,553 cf Primary = 0.35 cfs @ 12.39 hrs, Volume= 828 cf Routed to Pond 27P : Basin 2 Routing by Stor-Ind method, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs Peak Elev= 572.89' @ 12.39 hrs Surf.Area= 12,197 sf Storage= 4,328 cf Plug-Flow detention time= 17.4 min calculated for 22,381 cf (100% of inflow) Center-of-Mass det. time= 17.4 min ( 772.4 - 755.0 ) Volume #1 Invert 572.00' Elevation (feet) 572.00 573.00 574.00 574.91 Device #1 #2 #3 Avail.Storage 14,197 cf Surf.Area (sq-ft) 12,197 12,197 12,197 12,197 Routing Primary Primary Discarded Invert 574.00' 572.50' 572.00' Storage Description Custom Stage Data (Prismatic) Listed below 35,493 cf Overall x 40.0% Voids Inc.Store (cubic-feet) 0 12,197 12,197 11,099 Cum.Store (cubic-feet) 0 12,197 24,394 35,493 Outlet Devices 4.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) 6.0" Vert. Orifice C= 0.600 Limited to weir flow at low heads 4.000 in/hr Exfiltration over Surface area Discarded OutFlow Max=1.13 cfs @ 11.72 hrs HW=572.03' (Free Discharge) 3=Exfiltration (Exfiltration Controls 1.13 cfs) Primary OutFlow Max=0.35 cfs @ 12.39 hrs HW=572.89' (Free Discharge) 1=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) 2=Orifice (Orifice Controls 0.35 cfs @ 2.12 fps)
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 123 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Pond 22P: Basin 4 Hydrograph 6.28 cfs Inflow Area=57,587 sf Peak Elev=572.89' Storage=4,328 cf 7 6 Inflow Outflow Discarded Primary Flow (cfs) 5 4 3 1.47 cfs 2 1.13 cfs 1 0.35 cfs 0 0 5 10 15 20 25 30 35 40 45 Time (hours) 50 55 60 65 70 75 80 Pond 22P: Basin 4 Stage-Discharge Total Discarded Primary Sharp-Crested Rectangular Weir Elevation (feet) 574 573 Orifice Exfiltration 572 0 1 2 3 4 5 6 7 8 Discharge (cfs) 9 10 11 12 13
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 124 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Hydrograph for Pond 22P: Basin 4 Time (hours) 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 28.00 30.00 32.00 34.00 36.00 38.00 40.00 42.00 44.00 46.00 48.00 50.00 52.00 54.00 56.00 58.00 60.00 62.00 64.00 66.00 68.00 70.00 72.00 74.00 76.00 78.00 80.00 Inflow (cfs) 0.00 0.04 0.07 0.09 0.15 0.28 3.54 0.33 0.18 0.12 0.10 0.09 0.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 5 9 12 19 34 1,029 845 23 16 13 11 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Elevation (feet) 572.00 572.00 572.00 572.00 572.00 572.01 572.21 572.17 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 572.00 Outflow (cfs) 0.00 0.04 0.07 0.09 0.15 0.27 1.13 1.13 0.18 0.12 0.10 0.09 0.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Discarded (cfs) 0.00 0.04 0.07 0.09 0.15 0.27 1.13 1.13 0.18 0.12 0.10 0.09 0.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Primary (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 125 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Stage-Discharge for Pond 22P: Basin 4 Elevation (feet) 572.00 572.05 572.10 572.15 572.20 572.25 572.30 572.35 572.40 572.45 572.50 572.55 572.60 572.65 572.70 572.75 572.80 572.85 572.90 572.95 573.00 573.05 573.10 573.15 573.20 573.25 573.30 573.35 573.40 573.45 573.50 573.55 573.60 573.65 573.70 573.75 573.80 573.85 573.90 573.95 574.00 574.05 574.10 574.15 574.20 574.25 574.30 574.35 574.40 574.45 574.50 Discharge (cfs) 0.00 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.14 1.16 1.19 1.24 1.30 1.36 1.43 1.49 1.55 1.60 1.65 1.69 1.73 1.76 1.80 1.83 1.86 1.89 1.92 1.95 1.97 2.00 2.03 2.05 2.07 2.10 2.12 2.14 2.17 2.19 2.35 2.64 3.00 3.43 3.90 4.42 4.99 5.59 6.22 6.89 Discarded (cfs) 0.00 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 Primary (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.03 0.07 0.11 0.17 0.23 0.30 0.36 0.43 0.47 0.52 0.56 0.60 0.63 0.67 0.70 0.73 0.76 0.79 0.82 0.85 0.87 0.90 0.92 0.95 0.97 0.99 1.01 1.04 1.06 1.22 1.51 1.87 2.30 2.77 3.29 3.86 4.46 5.09 5.76 Elevation (feet) 574.55 574.60 574.65 574.70 574.75 574.80 574.85 574.90 Discharge (cfs) 7.59 8.31 9.06 9.84 10.64 11.47 12.31 13.18 Discarded (cfs) 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 Primary (cfs) 6.46 7.18 7.93 8.71 9.51 10.34 11.18 12.05
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 126 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 22P: Basin 4 Elevation (feet) 572.00 572.05 572.10 572.15 572.20 572.25 572.30 572.35 572.40 572.45 572.50 572.55 572.60 572.65 572.70 572.75 572.80 572.85 572.90 572.95 573.00 573.05 573.10 573.15 573.20 573.25 573.30 573.35 573.40 573.45 573.50 573.55 573.60 573.65 573.70 573.75 573.80 573.85 573.90 573.95 574.00 574.05 574.10 574.15 574.20 574.25 574.30 574.35 574.40 574.45 574.50 Surface (sq-ft) 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 Storage (cubic-feet) 0 244 488 732 976 1,220 1,464 1,708 1,952 2,195 2,439 2,683 2,927 3,171 3,415 3,659 3,903 4,147 4,391 4,635 4,879 5,123 5,367 5,611 5,855 6,099 6,342 6,586 6,830 7,074 7,318 7,562 7,806 8,050 8,294 8,538 8,782 9,026 9,270 9,514 9,758 10,002 10,245 10,489 10,733 10,977 11,221 11,465 11,709 11,953 12,197 Elevation (feet) 574.55 574.60 574.65 574.70 574.75 574.80 574.85 574.90 Surface (sq-ft) 12,197 12,197 12,197 12,197 12,197 12,197 12,197 12,197 Storage (cubic-feet) 12,441 12,685 12,929 13,173 13,417 13,661 13,905 14,149
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 127 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Summary for Pond 27P: Basin 2 Inflow Area = 217,925 sf, 51.70% Impervious, Inflow Depth = 1.90" for 10-Year event Inflow = 10.85 cfs @ 12.19 hrs, Volume= 34,595 cf Outflow = 1.51 cfs @ 12.85 hrs, Volume= 16,342 cf, Atten= 86%, Lag= 39.6 min Primary = 1.51 cfs @ 12.85 hrs, Volume= 16,342 cf Routed to Link 28L : POA 2 Routing by Stor-Ind method, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs Peak Elev= 544.77' @ 12.85 hrs Surf.Area= 27,872 sf Storage= 20,640 cf Plug-Flow detention time= 300.1 min calculated for 16,333 cf (47% of inflow) Center-of-Mass det. time= 173.5 min ( 972.3 - 798.8 ) Volume #1 Invert 544.00' Elevation (feet) 544.00 546.00 Avail.Storage 56,873 cf Surf.Area (sq-ft) 26,023 30,850 Device #1 Routing Primary Invert 545.10' #2 Primary 544.68' Storage Description Custom Stage Data (Prismatic) Listed below (Recalc) Inc.Store (cubic-feet) 0 56,873 Cum.Store (cubic-feet) 0 56,873 Outlet Devices 42.0" x 48.0" Horiz. Grate C= 0.600 Limited to weir flow at low heads 18.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) 0.7' Crest Height Primary OutFlow Max=1.50 cfs @ 12.85 hrs HW=544.77' (Free Discharge) 1=Grate ( Controls 0.00 cfs) 2=Sharp-Crested Rectangular Weir (Weir Controls 1.50 cfs @ 0.97 fps)
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 128 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Pond 27P: Basin 2 Hydrograph 12 Inflow Primary 10.85 cfs Inflow Area=217,925 sf Peak Elev=544.77' Storage=20,640 cf 11 10 9 Flow (cfs) 8 7 6 5 4 3 2 1.51 cfs 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 Time (hours) Pond 27P: Basin 2 Stage-Discharge Elevation (feet) 546 Primary Grate 545 Sharp-Crested Rectangular Weir 544 0 20 40 60 80 Discharge (cfs) 100 120 140
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 129 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Hydrograph for Pond 27P: Basin 2 Time (hours) 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 28.00 30.00 32.00 34.00 36.00 38.00 40.00 42.00 44.00 46.00 48.00 50.00 52.00 54.00 56.00 58.00 60.00 62.00 64.00 66.00 68.00 70.00 72.00 74.00 76.00 78.00 80.00 Inflow (cfs) 0.00 0.02 0.04 0.06 0.10 0.26 3.53 0.56 0.31 0.21 0.18 0.16 0.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 49 287 644 1,179 2,355 8,111 19,698 19,139 18,939 18,845 18,797 18,723 18,317 18,261 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 18,254 Elevation (feet) 544.00 544.00 544.01 544.02 544.05 544.09 544.31 544.73 544.71 544.70 544.70 544.70 544.70 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 544.68 Primary (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.72 0.35 0.24 0.19 0.16 0.14 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
File revisions (1)
- Sep 29, 2026
69ec9df8b1f435,202,335 bytes