Supporting Documentation · Jul 30, 2024
Revised Stormwater Management Report
69ec9df8b1f4567abd2a92749a074a179a57821dd07f0cd16dd61242156a3c29Indexed text
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 250 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 25S: Basin 2 - Perv Time Precip. Excess (hours) (inches) (inches) 0.00 0.00 0.00 0.80 0.23 0.00 1.60 1.18 0.11 2.40 1.25 0.13 3.20 1.25 0.13 4.00 1.25 0.13 4.80 1.25 0.13 5.60 1.25 0.13 6.40 1.25 0.13 7.20 1.25 0.13 8.00 1.25 0.13 8.80 1.25 0.13 9.60 1.25 0.13 10.40 1.25 0.13 11.20 1.25 0.13 12.00 1.25 0.13 12.80 1.25 0.13 13.60 1.25 0.13 14.40 1.25 0.13 15.20 1.25 0.13 16.00 1.25 0.13 16.80 1.25 0.13 17.60 1.25 0.13 18.40 1.25 0.13 19.20 1.25 0.13 20.00 1.25 0.13 20.80 1.25 0.13 21.60 1.25 0.13 22.40 1.25 0.13 23.20 1.25 0.13 24.00 1.25 0.13 24.80 1.25 0.13 25.60 1.25 0.13 26.40 1.25 0.13 27.20 1.25 0.13 28.00 1.25 0.13 28.80 1.25 0.13 29.60 1.25 0.13 30.40 1.25 0.13 31.20 1.25 0.13 32.00 1.25 0.13 32.80 1.25 0.13 33.60 1.25 0.13 34.40 1.25 0.13 35.20 1.25 0.13 36.00 1.25 0.13 36.80 1.25 0.13 37.60 1.25 0.13 38.40 1.25 0.13 39.20 1.25 0.13 40.00 1.25 0.13 Runoff (cfs) 0.00 0.00 0.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Time Precip. Excess (hours) (inches)
00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Time Precip. Excess (hours) (inches) (inches) 40.80 1.25 0.13 41.60 1.25 0.13 42.40 1.25 0.13 43.20 1.25 0.13 44.00 1.25 0.13 44.80 1.25 0.13 45.60 1.25 0.13 46.40 1.25 0.13 47.20 1.25 0.13 48.00 1.25 0.13 48.80 1.25 0.13 49.60 1.25 0.13 50.40 1.25 0.13 51.20 1.25 0.13 52.00 1.25 0.13 52.80 1.25 0.13 53.60 1.25 0.13 54.40 1.25 0.13 55.20 1.25 0.13 56.00 1.25 0.13 56.80 1.25 0.13 57.60 1.25 0.13 58.40 1.25 0.13 59.20 1.25 0.13 60.00 1.25 0.13 60.80 1.25 0.13 61.60 1.25 0.13 62.40 1.25 0.13 63.20 1.25 0.13 64.00 1.25 0.13 64.80 1.25 0.13 65.60 1.25 0.13 66.40 1.25 0.13 67.20 1.25 0.13 68.00 1.25 0.13 68.80 1.25 0.13 69.60 1.25 0.13 70.40 1.25 0.13 71.20 1.25 0.13 72.00 1.25 0.13 72.80 1.25 0.13 73.60 1.25 0.13 74.40 1.25 0.13 75.20 1.25 0.13 76.00 1.25 0.13 76.80 1.25 0.13 77.60 1.25 0.13 78.40 1.25 0.13 79.20 1.25 0.13 80.00 1.25 0.13 Runoff (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 251 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Summary for Subcatchment 28S: Basin 2 - Imp Runoff = 1.76 cfs @ 1.15 hrs, Volume= Routed to Pond 27P : Basin 2 2,601 cf, Depth= 1.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs NJ DEP 2-hr WQ Rainfall=1.25" Area (sf) 28,866 1,307 30,173 30,173 Tc (min) 9.0 CN 98 98 98 Description Paved parking, HSG C Paved parking, HSG D Weighted Average 100.00% Impervious Area Length (feet) 93 Slope Velocity Capacity Description (ft/ft) (ft/sec) (cfs) 0.0500 0.17 Sheet Flow, Sheet Flow (A-B) Grass: Dense n= 0.240 P2= 3.47" Using McCuen-Spiess flow length 370 0.0650 4.10 Shallow Concentrated Flow, SCF (B-C) Unpaved Kv= 16.1 fps 463 Total 1.5 10.5 Subcatchment 28S: Basin 2 - Imp Hydrograph Runoff Flow (cfs) 1.76 cfs 1 0 NJ DEP 2-hr WQ Rainfall=1.25" Runoff Area=30,173 sf Runoff Volume=2,601 cf Runoff Depth=1.03" Flow Length=463' Tc=10.5 min CN=98 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 Time (hours)
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 252 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 28S: Basin 2 - Imp Time Precip. Excess (hours) (inches) (inches) 0.00 0.00 0.00 0.80 0.23 0.09 1.60 1.18 0.97 2.40 1.25 1.03 3.20 1.25 1.03 4.00 1.25 1.03 4.80 1.25 1.03 5.60 1.25 1.03 6.40 1.25 1.03 7.20 1.25 1.03 8.00 1.25 1.03 8.80 1.25 1.03 9.60 1.25 1.03 10.40 1.25 1.03 11.20 1.25 1.03 12.00 1.25 1.03 12.80 1.25 1.03 13.60 1.25 1.03 14.40 1.25 1.03 15.20 1.25 1.03 16.00 1.25 1.03 16.80 1.25 1.03 17.60 1.25 1.03 18.40 1.25 1.03 19.20 1.25 1.03 20.00 1.25 1.03 20.80 1.25 1.03 21.60 1.25 1.03 22.40 1.25 1.03 23.20 1.25 1.03 24.00 1.25 1.03 24.80 1.25 1.03 25.60 1.25 1.03 26.40 1.25 1.03 27.20 1.25 1.03 28.00 1.25 1.03 28.80 1.25 1.03 29.60 1.25 1.03 30.40 1.25 1.03 31.20 1.25 1.03 32.00 1.25 1.03 32.80 1.25 1.03 33.60 1.25 1.03 34.40 1.25 1.03 35.20 1.25 1.03 36.00 1.25 1.03 36.80 1.25 1.03 37.60 1.25 1.03 38.40 1.25 1.03 39.20 1.25 1.03 40.00 1.25 1.03 Runoff (cfs) 0.00 0.16 0.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Time Precip. Excess (hours) (inches)
00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Time Precip. Excess (hours) (inches) (inches) 40.80 1.25 1.03 41.60 1.25 1.03 42.40 1.25 1.03 43.20 1.25 1.03 44.00 1.25 1.03 44.80 1.25 1.03 45.60 1.25 1.03 46.40 1.25 1.03 47.20 1.25 1.03 48.00 1.25 1.03 48.80 1.25 1.03 49.60 1.25 1.03 50.40 1.25 1.03 51.20 1.25 1.03 52.00 1.25 1.03 52.80 1.25 1.03 53.60 1.25 1.03 54.40 1.25 1.03 55.20 1.25 1.03 56.00 1.25 1.03 56.80 1.25 1.03 57.60 1.25 1.03 58.40 1.25 1.03 59.20 1.25 1.03 60.00 1.25 1.03 60.80 1.25 1.03 61.60 1.25 1.03 62.40 1.25 1.03 63.20 1.25 1.03 64.00 1.25 1.03 64.80 1.25 1.03 65.60 1.25 1.03 66.40 1.25 1.03 67.20 1.25 1.03 68.00 1.25 1.03 68.80 1.25 1.03 69.60 1.25 1.03 70.40 1.25 1.03 71.20 1.25 1.03 72.00 1.25 1.03 72.80 1.25 1.03 73.60 1.25 1.03 74.40 1.25 1.03 75.20 1.25 1.03 76.00 1.25 1.03 76.80 1.25 1.03 77.60 1.25 1.03 78.40 1.25 1.03 79.20 1.25 1.03 80.00 1.25 1.03 Runoff (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 253 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Summary for Subcatchment 29S: Basin 8 - Imp Runoff = 2.44 cfs @ 1.13 hrs, Volume= Routed to Pond 48P : Basin 8 3,397 cf, Depth= 1.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs NJ DEP 2-hr WQ Rainfall=1.25" Area (sf) 24,632 14,771 39,403 39,403 Tc (min) 8.3 Length (feet) 100 0.3 65 8.6 165 CN 98 98 98 Description Paved parking, HSG C Paved parking, HSG D Weighted Average 100.00% Impervious Area Slope Velocity Capacity Description (ft/ft) (ft/sec) (cfs) 0.0700 0.20 Sheet Flow, Sheet Flow (A-B) Grass: Dense n= 0.240 P2= 3.47" 0.0600 3.94 Shallow Concentrated Flow, SCF (B-C) Unpaved Kv= 16.1 fps Total Subcatchment 29S: Basin 8 - Imp Hydrograph Runoff 2.44 cfs Flow (cfs) 2 1 0 NJ DEP 2-hr WQ Rainfall=1.25" Runoff Area=39,403 sf Runoff Volume=3,397 cf Runoff Depth=1.03" Flow Length=165' Tc=8.6 min CN=98 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 Time (hours)
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 254 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 29S: Basin 8 - Imp Time Precip. Excess (hours) (inches) (inches) 0.00 0.00 0.00 0.80 0.23 0.09 1.60 1.18 0.97 2.40 1.25 1.03 3.20 1.25 1.03 4.00 1.25 1.03 4.80 1.25 1.03 5.60 1.25 1.03 6.40 1.25 1.03 7.20 1.25 1.03 8.00 1.25 1.03 8.80 1.25 1.03 9.60 1.25 1.03 10.40 1.25 1.03 11.20 1.25 1.03 12.00 1.25 1.03 12.80 1.25 1.03 13.60 1.25 1.03 14.40 1.25 1.03 15.20 1.25 1.03 16.00 1.25 1.03 16.80 1.25 1.03 17.60 1.25 1.03 18.40 1.25 1.03 19.20 1.25 1.03 20.00 1.25 1.03 20.80 1.25 1.03 21.60 1.25 1.03 22.40 1.25 1.03 23.20 1.25 1.03 24.00 1.25 1.03 24.80 1.25 1.03 25.60 1.25 1.03 26.40 1.25 1.03 27.20 1.25 1.03 28.00 1.25 1.03 28.80 1.25 1.03 29.60 1.25 1.03 30.40 1.25 1.03 31.20 1.25 1.03 32.00 1.25 1.03 32.80 1.25 1.03 33.60 1.25 1.03 34.40 1.25 1.03 35.20 1.25 1.03 36.00 1.25 1.03 36.80 1.25 1.03 37.60 1.25 1.03 38.40 1.25 1.03 39.20 1.25 1.03 40.00 1.25 1.03 Runoff (cfs) 0.00 0.23 0.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Time Precip. Excess (hours) (inches)
00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Time Precip. Excess (hours) (inches) (inches) 40.80 1.25 1.03 41.60 1.25 1.03 42.40 1.25 1.03 43.20 1.25 1.03 44.00 1.25 1.03 44.80 1.25 1.03 45.60 1.25 1.03 46.40 1.25 1.03 47.20 1.25 1.03 48.00 1.25 1.03 48.80 1.25 1.03 49.60 1.25 1.03 50.40 1.25 1.03 51.20 1.25 1.03 52.00 1.25 1.03 52.80 1.25 1.03 53.60 1.25 1.03 54.40 1.25 1.03 55.20 1.25 1.03 56.00 1.25 1.03 56.80 1.25 1.03 57.60 1.25 1.03 58.40 1.25 1.03 59.20 1.25 1.03 60.00 1.25 1.03 60.80 1.25 1.03 61.60 1.25 1.03 62.40 1.25 1.03 63.20 1.25 1.03 64.00 1.25 1.03 64.80 1.25 1.03 65.60 1.25 1.03 66.40 1.25 1.03 67.20 1.25 1.03 68.00 1.25 1.03 68.80 1.25 1.03 69.60 1.25 1.03 70.40 1.25 1.03 71.20 1.25 1.03 72.00 1.25 1.03 72.80 1.25 1.03 73.60 1.25 1.03 74.40 1.25 1.03 75.20 1.25 1.03 76.00 1.25 1.03 76.80 1.25 1.03 77.60 1.25 1.03 78.40 1.25 1.03 79.20 1.25 1.03 80.00 1.25 1.03 Runoff (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 255 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Summary for Subcatchment 30S: Basin 8 - Perv Runoff = 0.13 cfs @ 1.21 hrs, Volume= Routed to Pond 48P : Basin 8 222 cf, Depth= 0.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs NJ DEP 2-hr WQ Rainfall=1.25" Area (sf) 11,542 11,245 22,787 22,787 Tc (min) 8.3 Length (feet) 100 0.3 65 8.6 165 CN 80 74 77 Description >75% Grass cover, Good, HSG D >75% Grass cover, Good, HSG C Weighted Average 100.00% Pervious Area Slope Velocity Capacity Description (ft/ft) (ft/sec) (cfs) 0.0700 0.20 Sheet Flow, Sheet Flow (A-B) Grass: Dense n= 0.240 P2= 3.47" 0.0600 3.94 Shallow Concentrated Flow, SCF (B-C) Unpaved Kv= 16.1 fps Total Subcatchment 30S: Basin 8 - Perv Hydrograph Runoff 0.14 0.13 cfs 0.13 0.12 0.11 0.1 Flow (cfs) 0.09 0.08 0.07 0.06 0.05 0.04 0.03 NJ DEP 2-hr WQ Rainfall=1.25" Runoff Area=22,787 sf Runoff Volume=222 cf Runoff Depth=0.12" Flow Length=165' Tc=8.6 min CN=77 0.02 0.01 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 Time (hours)
POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 256 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 30S: Basin 8 - Perv Time Precip. Excess (hours) (inches) (inches) 0.00 0.00 0.00 0.80 0.23 0.00 1.60 1.18 0.10 2.40 1.25 0.12 3.20 1.25 0.12 4.00 1.25 0.12 4.80 1.25 0.12 5.60 1.25 0.12 6.40 1.25 0.12 7.20 1.25 0.12 8.00 1.25 0.12 8.80 1.25 0.12 9.60 1.25 0.12 10.40 1.25 0.12 11.20 1.25 0.12 12.00 1.25 0.12 12.80 1.25 0.12 13.60 1.25 0.12 14.40 1.25 0.12 15.20 1.25 0.12 16.00 1.25 0.12 16.80 1.25 0.12 17.60 1.25 0.12 18.40 1.25 0.12 19.20 1.25 0.12 20.00 1.25 0.12 20.80 1.25 0.12 21.60 1.25 0.12 22.40 1.25 0.12 23.20 1.25 0.12 24.00 1.25 0.12 24.80 1.25 0.12 25.60 1.25 0.12 26.40 1.25 0.12 27.20 1.25 0.12 28.00 1.25 0.12 28.80 1.25 0.12 29.60 1.25 0.12 30.40 1.25 0.12 31.20 1.25 0.12 32.00 1.25 0.12 32.80 1.25 0.12 33.60 1.25 0.12 34.40 1.25 0.12 35.20 1.25 0.12 36.00 1.25 0.12 36.80 1.25 0.12 37.60 1.25 0.12 38.40 1.25 0.12 39.20 1.25 0.12 40.00 1.25 0.12 Runoff (cfs) 0.00 0.00 0.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Time Precip. Excess (hours) (inches)
File revisions (1)
- Sep 29, 2026
69ec9df8b1f435,202,335 bytes