Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 30, 2024

Revised Stormwater Management Report

Preserved file SHA-25669ec9df8b1f4567abd2a92749a074a179a57821dd07f0cd16dd61242156a3c29

Indexed text

Page 446

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 294 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Hydrograph for Pond 33P: Basin 11 Time (hours) 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 28.00 30.00 32.00 34.00 36.00 38.00 40.00 42.00 44.00 46.00 48.00 50.00 52.00 54.00 56.00 58.00 60.00 62.00 64.00 66.00 68.00 70.00 72.00 74.00 76.00 78.00 80.00 Inflow (cfs) 0.00 0.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Elevation (feet) 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 590.00 Outflow (cfs) 0.00 0.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Discarded (cfs) 0.00 0.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Primary (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 447

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 295 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Stage-Discharge for Pond 33P: Basin 11 Elevation (feet) 590.00 590.05 590.10 590.15 590.20 590.25 590.30 590.35 590.40 590.45 590.50 590.55 590.60 590.65 590.70 590.75 590.80 590.85 590.90 590.95 591.00 591.05 591.10 591.15 591.20 591.25 591.30 591.35 591.40 591.45 591.50 591.55 591.60 591.65 591.70 591.75 591.80 591.85 591.90 591.95 592.00 592.05 592.10 592.15 592.20 592.25 592.30 592.35 592.40 Discharge (cfs) 0.00 3.13 3.13 3.31 3.64 4.07 4.58 5.15 5.78 6.46 7.20 7.97 8.79 9.65 10.54 11.47 12.43 13.43 14.45 15.50 16.58 17.69 18.82 19.98 21.16 22.36 23.59 24.83 26.10 27.39 28.69 30.02 31.36 32.72 34.10 35.49 36.90 38.33 39.77 41.22 42.69 44.17 45.67 47.18 48.70 50.24 51.78 53.34 54.91 Discarded (cfs) 0.00 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 Primary (cfs) 0.00 0.00 0.00 0.18 0.51 0.94 1.45 2.02 2.65 3.34 4.07 4.85 5.66 6.52 7.42 8.35 9.31 10.30 11.32 12.38 13.46 14.56 15.70 16.85 18.03 19.24 20.46 21.71 22.97 24.26 25.57 26.89 28.23 29.59 30.97 32.37 33.78 35.20 36.64 38.10 39.57 41.05 42.55 44.05 45.58 47.11 48.66 50.21 51.78

Page 448

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 296 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 33P: Basin 11 Elevation (feet) 590.00 590.05 590.10 590.15 590.20 590.25 590.30 590.35 590.40 590.45 590.50 590.55 590.60 590.65 590.70 590.75 590.80 590.85 590.90 590.95 591.00 591.05 591.10 591.15 591.20 591.25 591.30 591.35 591.40 591.45 591.50 591.55 591.60 591.65 591.70 591.75 591.80 591.85 591.90 591.95 592.00 592.05 592.10 592.15 592.20 592.25 592.30 592.35 592.40 Surface (sq-ft) 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 13,504 Storage (cubic-feet) 0 270 540 810 1,080 1,350 1,620 1,891 2,161 2,431 2,701 2,971 3,241 3,511 3,781 4,051 4,321 4,591 4,861 5,132 5,402 5,672 5,942 6,212 6,482 6,752 7,022 7,292 7,562 7,832 8,102 8,372 8,643 8,913 9,183 9,453 9,723 9,993 10,263 10,533 10,803 11,073 11,343 11,613 11,884 12,154 12,424 12,694 12,964

Page 449

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 297 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Summary for Pond 41P: Basin 10 Inflow Area = 97,058 sf, 61.64% Impervious, Inflow Depth = 0.67" for WQ event Inflow = 3.54 cfs @ 1.16 hrs, Volume= 5,427 cf Outflow = 2.22 cfs @ 1.12 hrs, Volume= 5,427 cf, Atten= 37%, Lag= 0.0 min Discarded = 2.22 cfs @ 1.12 hrs, Volume= 5,427 cf Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routed to Link 28L : POA 2 Routing by Stor-Ind method, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs Peak Elev= 576.09' @ 1.28 hrs Surf.Area= 9,583 sf Storage= 900 cf Plug-Flow detention time= 3.7 min calculated for 5,424 cf (100% of inflow) Center-of-Mass det. time= 3.7 min ( 79.2 - 75.5 ) Volume #1 Invert 576.00' Elevation (feet) 576.00 577.00 578.00 579.00 Avail.Storage 28,749 cf Surf.Area (sq-ft) 9,583 9,583 9,583 9,583 Device #1 Routing Primary Invert 576.15' #2 Primary 576.15' #3 Discarded 576.00' Storage Description Custom Stage Data (Prismatic) Listed below (Recalc) Inc.Store (cubic-feet) 0 9,583 9,583 9,583 Cum.Store (cubic-feet) 0 9,583 19,166 28,749 Outlet Devices 42.0" x 48.0" Horiz. Grate C= 0.600 Limited to weir flow at low heads 42.0" x 48.0" Horiz. Grate C= 0.600 Limited to weir flow at low heads 10.000 in/hr Exfiltration over Surface area Discarded OutFlow Max=2.22 cfs @ 1.12 hrs HW=576.04' (Free Discharge) 3=Exfiltration (Exfiltration Controls 2.22 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=576.00' (Free Discharge) 1=Grate ( Controls 0.00 cfs) 2=Grate ( Controls 0.00 cfs)

Page 450

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 298 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Pond 41P: Basin 10 Hydrograph 3.54 cfs Inflow Area=97,058 sf Peak Elev=576.09' Storage=900 cf Inflow Outflow Discarded Primary 3 2.22 cfs Flow (cfs) 2.22 cfs 2 1 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 Time (hours) 50 55 60 65 70 75 80 Pond 41P: Basin 10 Stage-Discharge Total Discarded Primary 579 Elevation (feet) 578 577 Grate + Grate Exfiltration 576 0 20 40 60 80 100 120 140 Discharge (cfs) 160 180 200 220

Page 451

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 299 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Hydrograph for Pond 41P: Basin 10 Time (hours) 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 28.00 30.00 32.00 34.00 36.00 38.00 40.00 42.00 44.00 46.00 48.00 50.00 52.00 54.00 56.00 58.00 60.00 62.00 64.00 66.00 68.00 70.00 72.00 74.00 76.00 78.00 80.00 Inflow (cfs) 0.00 0.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage (cubic-feet) 0 31 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Elevation (feet) 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 576.00 Outflow (cfs) 0.00 0.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Discarded (cfs) 0.00 0.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Primary (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 452

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 300 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Stage-Discharge for Pond 41P: Basin 10 Elevation (feet) 576.00 576.05 576.10 576.15 576.20 576.25 576.30 576.35 576.40 576.45 576.50 576.55 576.60 576.65 576.70 576.75 576.80 576.85 576.90 576.95 577.00 577.05 577.10 577.15 577.20 577.25 577.30 577.35 577.40 577.45 577.50 577.55 577.60 577.65 577.70 577.75 577.80 577.85 577.90 577.95 578.00 578.05 578.10 578.15 578.20 578.25 578.30 578.35 578.40 578.45 578.50 Discharge (cfs) 0.00 2.22 2.22 2.22 3.32 5.32 7.92 10.99 14.48 18.34 22.53 27.04 31.83 36.90 42.23 47.81 53.63 59.67 65.94 72.41 79.10 85.98 93.05 100.32 107.77 115.40 123.20 131.17 139.32 147.62 156.09 161.74 164.56 167.34 170.07 172.75 175.40 178.00 180.57 183.10 185.59 188.05 190.48 192.88 195.25 197.59 199.90 202.19 204.45 206.68 208.89 Discarded (cfs) 0.00 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 Primary (cfs) 0.00 0.00 0.00 0.00 1.10 3.10 5.70 8.77 12.26 16.12 20.31 24.82 29.61 34.68 40.01 45.59 51.41 57.45 63.72 70.19 76.88 83.76 90.84 98.10 105.55 113.18 120.98 128.96 137.10 145.41 153.88 159.52 162.34 165.12 167.85 170.53 173.18 175.78 178.35 180.88 183.37 185.84 188.26 190.66 193.03 195.37 197.68 199.97 202.23 204.46 206.67 Elevation (feet) 578.55 578.60 578.65 578.70 578.75 578.80 578.85 578.90 578.95 579.00 Discharge (cfs) 211.08 213.24 215.39 217.51 219.61 221.69 223.75 225.79 227.81 229.82 Discarded (cfs) 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22 Primary (cfs) 208.86 211.03 213.17 215.29 217.39 219.47 221.53 223.57 225.60 227.60

Page 453

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 301 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 41P: Basin 10 Elevation (feet) 576.00 576.05 576.10 576.15 576.20 576.25 576.30 576.35 576.40 576.45 576.50 576.55 576.60 576.65 576.70 576.75 576.80 576.85 576.90 576.95 577.00 577.05 577.10 577.15 577.20 577.25 577.30 577.35 577.40 577.45 577.50 577.55 577.60 577.65 577.70 577.75 577.80 577.85 577.90 577.95 578.00 578.05 578.10 578.15 578.20 578.25 578.30 578.35 578.40 578.45 578.50 Surface (sq-ft) 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 Storage (cubic-feet) 0 479 958 1,437 1,917 2,396 2,875 3,354 3,833 4,312 4,792 5,271 5,750 6,229 6,708 7,187 7,666 8,146 8,625 9,104 9,583 10,062 10,541 11,020 11,500 11,979 12,458 12,937 13,416 13,895 14,375 14,854 15,333 15,812 16,291 16,770 17,249 17,729 18,208 18,687 19,166 19,645 20,124 20,603 21,083 21,562 22,041 22,520 22,999 23,478 23,958 Elevation (feet) 578.55 578.60 578.65 578.70 578.75 578.80 578.85 578.90 578.95 579.00 Surface (sq-ft) 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 9,583 Storage (cubic-feet) 24,437 24,916 25,395 25,874 26,353 26,832 27,312 27,791 28,270 28,749

Page 454

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 302 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Summary for Pond 42P: Basin 9 Inflow Area = 25,049 sf, 64.41% Impervious, Inflow Depth = 0.71" for WQ event Inflow = 1.08 cfs @ 1.12 hrs, Volume= 1,491 cf Outflow = 0.61 cfs @ 1.04 hrs, Volume= 1,491 cf, Atten= 44%, Lag= 0.0 min Discarded = 0.61 cfs @ 1.04 hrs, Volume= 1,491 cf Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routed to Link 28L : POA 2 Routing by Stor-Ind method, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs Peak Elev= 562.11' @ 1.24 hrs Surf.Area= 6,534 sf Storage= 284 cf Plug-Flow detention time= 3.9 min calculated for 1,490 cf (100% of inflow) Center-of-Mass det. time= 3.9 min ( 76.4 - 72.5 ) Volume #1 Invert 562.00' Elevation (feet) 562.00 563.00 564.00 564.42 Device #1 #2 #3 Avail.Storage 6,325 cf Surf.Area (sq-ft) 6,534 6,534 6,534 6,534 Routing Primary Primary Discarded Invert 564.00' 563.00' 562.00' Storage Description Custom Stage Data (Prismatic) Listed below (Recalc) 15,812 cf Overall x 40.0% Voids Inc.Store (cubic-feet) 0 6,534 6,534 2,744 Cum.Store (cubic-feet) 0 6,534 13,068 15,812 Outlet Devices 4.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) 3.0" Vert. Orifice C= 0.600 Limited to weir flow at low heads 4.000 in/hr Exfiltration over Surface area Discarded OutFlow Max=0.61 cfs @ 1.04 hrs HW=562.03' (Free Discharge) 3=Exfiltration (Exfiltration Controls 0.61 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=562.00' (Free Discharge) 1=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) 2=Orifice ( Controls 0.00 cfs)

Page 455

POA 2 proposed 2024-05-12 HydroCad - Proposed POA 2 NJ DEP 2-hr WQ Rainfall=1.25" Prepared by Anderson Consulting Services Printed 6/29/2024 Page 303 HydroCAD® 10.20-5a s/n 06666 © 2023 HydroCAD Software Solutions LLC Pond 42P: Basin 9 Hydrograph 1.08 cfs Inflow Area=25,049 sf Peak Elev=562.11' Storage=284 cf 1 Inflow Outflow Discarded Primary 0.61 cfs Flow (cfs) 0.61 cfs 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 Time (hours) 50 55 60 65 70 75 80 Pond 42P: Basin 9 Stage-Discharge Total Discarded Primary Sharp-Crested Rectangular Weir Elevation (feet) 564 Orifice 563 Exfiltration 562 0 1 2 Discharge (cfs) 3 4

File revisions (1)