Supporting Documentation · Jul 30, 2024
Revised Stormwater Management Report
69ec9df8b1f4567abd2a92749a074a179a57821dd07f0cd16dd61242156a3c29Indexed text
[Project Name Description Analysis Date BMP or LID e West Essex Highlands _|West Orange, Essex Coun’ 05/31/24 HI - = = a ay - Parameter Symbol Parameter Symbol Value Unit Parameter Symbol Value Unit Empty Portion BMP Area ABMP lof RWC under PostD | ERWC 0.39 |in inches of Runoft Qdesign | 0.70 Natural Recharge la BMP Effective Depth, ERWC Modified to F inches of Rainfall this is the design variable | _¢°MP Iconsider dEXC EDRWC [nce to capture Pelssion | iiimaas Upper level of the BMP lEmpty Portion surface (negative ifabove | dBMPu lof RWC under In Rerwe | 0.00 |in peeraras: revises 28.2. fin ponees ay Wg. over Imp. Area Sees Depth of lower surface of Runoff Captured IBMP, must be>=dBMPu EXC |Avg. over imp. Area eae" Post-development Land [Segment Location of BMP i Sega | input Ze # Location is distributed Jo-undetermined [BMP Calculated Size Parameters aT CULATION CHEC ABMPYAimp Aratio Volume Balance> Solve to satisfy Annual Recharge BMP Volume BMP Check—-> OK ance Ci dEXC Check-—> OK |Post-D Deficit Recharge lor desired recharge Vader cuit Snrual BMP Recharge 76,936 |cu.t volume) BMP Location> Location is selected as distributed or undetermined PostD Impervious Area | grap oqt lAvg BMP Recharge no, i (or target Impervious Area) Efficiency Recharnes Root Zone Water Capacity | RWC 237 {in PeRainfall 78.8% : became Runoff ee design is accurate only ater EMP cimensions are updated fo mcke rech volume= deft volume. The portion IRWC Modified to consider dEXC DRWO' eee BAS |. or BMP initration po and the ere occupies by BMP ere ignored in hese calculator, Results are peliietionreictot C-factor ay Ro units Recharged_ a % |senselive to EMP, make sure dBMP selected is small enough for BMP to empty in less than 3 days. Fer land Y6Rainfall Average Annual P Pavg 49.0 in Recharged 3.1% lo, ISegment Location of BMP if you select “impervious areas” RWC wil be minimal but not zero as determined by Recharge Requirement a |, jover Imp. Area = [the soil type and a shallow root zone for this Land Cover allowing consideration of lateral flow and other Iosses. How to solve for different recharge volumes: By default the spreadsheat assigns the values of total deficit recharge volume "Vd? and total proposed impervious area "Aimp” from the "Annual Recharge” sheet to der" and "Aimp" on this page. This allows solution for a single BMP to handle the entire recharge requirement
volume "Vd? and total proposed impervious area "Aimp” from the "Annual Recharge” sheet to der" and "Aimp" on this page. This allows solution for a single BMP to handle the entire recharge requirement assuming the runoff from entire impervious area is available to the BMP. To solve for a smaller BMP or a LID-IMP to recharge only part ofthe recharge requirement, set Vdef to your target value and Aimp to impervious erea directly connected to your infiration feclty and then solve for JABMP or dBMP. To go back to the default configuration clik the "Default Vdef & Aimp” button.
[Project Name West Essex Highlands ig Description West Orange, Essex Count Value Analysis Date rameters [Recharge Design Fa Symbol Parameter Parameter Empty Portion BMP Area ABMP lof RWC under Post-D | ERWC 0.39 |in Meee Qdesign | 2.49 Natural Recharge EMP Effective Depth, IERWC Modified to Inches of Rainfall this is the design variable | _SSMP consider dEXC EDRWG. otis)" to capture Pdesion [iaae ‘Upper level of the BMP Empty Portion ~ surface (negative ifabove | dBMPu lof RWC under inf, | RERWC | 0.00 |in mance lage 37.4 ground) BMP wg. over Imp. Area = = eo Depth of lower surface of Runoff Captured BMP, must be==aBMPu_ | EXC lAvg. over imp. Area ort jin Post-development Land [Segment Location of BMP | ; SegBMP input Zero it Location is dstibuted ev uncetermined E Volume Balance> Sol BMP Volume VeMP 2,600 Joust BMP Check—> OK a z 7 EXC Check—> OK Post-D Deficit Recharge (or desired recharge Ver cust BMP Recharge 49,877 lout volume) BMP Location» Location is selected as distributed or undetermined Represents 7 Fost-D Impervious Area Javg BMP Recharge 3 Aimp sq.ft 100.0% _|% Infitration (or target Impervious Area) Efficiency Rafeues | a Rainfall Root Zone Water Gapaciy’| RUC aaa" lbecame Runoff ghd Paesion is accurate ony after BMP éimensions are updated fo iske rach volume deft volume. The portion RWC Modiied to eoRunoff Z consider dEXC. RWG! Ci infiltrated Ganka Jot EMP intitration pir to fing and the area occupied by BMP are ignored in these calculations. Results are . eeRunoff eiiniatie soto’ C-factor AGT |rounits tRecharged 25% | sensetive to dBMP, make sure dEMP selected is small enough for BMP to empty ia tess than 3 days. Fer land Rainfall verge Annual Pavg a" lRecharged 2.0% Im [Segment Location of BMP if you select “impervious areas” RUVC wil be minimal but nt zero as determined by Recharge Requirement lover Imp. Area er getra |" ihe soi ype and a shetow rect zene for his Land Cover allowing oorsideration of How to solve for different recharge volumes: By default the spreadsheet assigns the values of total deficit recharge volume "VdeF and total proposed impervious area "Aimp” from the "Annual Recharge” sheet to "der" and "Aimp" on this page. This allows solution for a single BMP to handle the entire recharge requirement assuming the runoff from entire impervious area is available to the BMP. ‘To solve for a smaller BMP or a LID-IMP to
ge. This allows solution for a single BMP to handle the entire recharge requirement assuming the runoff from entire impervious area is available to the BMP. ‘To solve for a smaller BMP or a LID-IMP to recharge only part of the recharge requirement, set Vdef to your target value and Aimp to impervious area directly connected to your infiltration facility and then solve for |ABMP or dBMP. To go back to the default configuration clik the "Default Vdef & Aimp" button
[Project Name Description Analysis Date BMP or LID Type West Essex Highlands [West Orange, Essex Coun 05/31/24 ae 3 a neter's Pai Parameter Value Unit Parameter Symbol Value Unit Parameter Symbol Value Unit Empty Portion BMP Area lof RWC under PostD | ERWC 0.39 Jin paces of nak Qdesign | 0.30 Natural Recharge: ui BMP Effective Depth, ERWC Modified to , inches of Rainfall ; this is the design variable Jconsider dEXC EDRWC [eons |" to capture Pdesion [moceant” Upper level of the EMP Empty Portion ‘ surface (negative if above Jof RWC under infil. | RERWC | 0.00 [in jeeonaiee Broviied 174 fin ground) BMP vg. over Imp. Area eee Eh Depth of lower surface of Runoff Captured a In BMP, must be>=dBMPu JAvg. over imp, Area 3 Post-development Land [Segment Location of BMP Location is distributed| Jor undetermined LCULATION CHECK MESS: Volume Balance-> Solve Problem BMP Check---> OK dEXC Check—> OK to satisfy Annual Recharge BMP Volume: arameters from System P Post-D Deficit Recharge (or desired recharge 2 uel aM: Recharge volume) [ si BMP Location—-> Location is selected as distributed or undetermined Post-D Impervious Area Ava BMP Recharge ec | pera i (or target Impervious Area) 9 4 Efficiency Recharged | " 4 Rainfall Root Zone Water Capacity Rwe 237 bi lbecame Runoff hs hy |Pdesign is accurate only after EMP dimensions are updated to make rech volume= deficit volume. The portion RWC Modified to fauna consider dEXC RWC |e infiltrated Sa ly Jot BMP infitation price > fing and the area occupied by BMP oro ignored in these caleulatons. Results are eeRunoff alc Rector Crector aeRO ocharped 44% |y sensetve io GBM, make sure GBMP selected is small enough for BMP te emp in ess then 3 days. Ferland FeRainfall JAverage Annual P Pavg #0 In Recharged SoEiln Segment Location of EMP if you select “impervious areas” RUVC wil be minimal but not zero as determined by Recharge Requirement @ it ln lover Imp. Area tne soil ype and a shallew root zane fr this Land Cover alowing consideration of lateral flow and ater losses, How to solve for different recharge volumes: By default the spreadsheet assigns the values of total "der" and "Aimp" on this page. This allows solution for a single BMP to handle the entire recharge To solve fora smaller BMP or a LID-IMP to imp” from the “Annual Recharge” sheet to ity and then solve for
[Project Name West Essex Highlands Description [West Oran Parameter Symbol _ Parameter Value — Unit ae Empty Portion BMP Area lof RWC under Post | ERWC 0.39 |in jes oF Rune Qdesign | 0.10 fin Natural Recharge. si BMP Effective Depth, ERWC Modified to inches of Rainfall this is the design variable consider dEXC EORWC | ace” to capture Peesion | genone|" Upper level of the BMP JEmpty Portion ; surface (negative if above lof RWC under Infilt RERWC | 0.00 |in secant ieee 75 ground) BARE vg. over Imp. Area Beiter Depth of lower surface of BMP, must be>=dBMPu Post-development Land Segment Location of BMP ft Zer0 if Loca for undetermined Runoff Captured Avg. over imp. Area 78 in Volume Balance Solve Problem to satisfy Annual Recharge BMP Check-—> OK dEXC Check-—-> OK To solve for a smaller BMP or a LI |ABMP or dBMP. To go back to the def fault configuration clik the "Default Vdef & Aimp" button. P to recharge only part of the recharge requirement, set Vdef to your target value and Aimp to impervious area directly connected to your infiltration facility and then solve for (or desired recharge ea 40,659 Jourt volume) BMP Location--> Location is selected as distributed or undetermined arg BMP Racharge 100.0% |sintivaton (or target Impervious Area) Efficiency Petene? | ; SGRainfal fRodtzone Welar Capacity] WC: 28" lbecame Runoff oe esq accurate only aie BMP dimensions are updated to mske ech vlume= defi volume. The retion RWC Modified to eRunoff consider EXC DRWC jects)" Iinfitrates Looe ot BME i prior to ling and the area occupied by BMP cre ignored in these calculations. Results are ‘ faRunoft ont Feetot Grtacton tbat no units Recharged 2ax % |sensetive to dBMP, make sure dEMP selected is small enough for BMP to empty in less than 3 days. For land a oRainfall Average Annual P Pava he Recharged 18% Ig [Segment Location of BUP i you select “impervious areas" RWC vil be minimal but nol zero a3 determined by Recharge Requirement lover Imp. Area ar 124 [in the sol type and a shallow roat zene for this Land Cover allowing consideration of lateral ow and other losses. ow to selve for different recharge volumes: By default the spreadshest assions the values of total defi recharge volume "VdeP and total proposed imparvious area "Aimp” fom the “Annual Hovhorge’ cheat Te [der and "Aimp* on this page. This allows solution for a single BMP to handle the entire
f total defi recharge volume "VdeP and total proposed imparvious area "Aimp” fom the “Annual Hovhorge’ cheat Te [der and "Aimp* on this page. This allows solution for a single BMP to handle the entire recharge requirement assuming the runoff from entire impervious area is available to the BMP.
[Project Name Description West Essex Highlands Analysis Date 05/31/24 Value Symbol Empty Portion BMP Area lof RWC under PostD | ERWG 0.39 [in hater of Runoff Qdesign | 3.08 fin to capture Natural Recharge EMP Effective Depth, ERWC Modified to inches of Rainfall this is the design variable Jconsider dEXC EDRWC (imac) to capture Peston |iiiiecmema|” Upper level of the BMP Empty Portion surface (negative if above lof RWC under Infit RERWC | 0,00 |in Peet Heel 38.3 {in ground) BMP. 9. P. eekeer eee get Depth of lower surface oF Runoff Captured al, BMP, must be>=dBMPu JAvg. over imp. Area i Post-development Land Segment Location of BMP Input Zero if Lecation is distributed for undetermines CHECK MESSAGE ce-> Solve Problem to satisfy Annual Recharge BMP Check-—> OK dEXC Check—> OK [System Performance Cal Post-D Deficit Recharge " ciate lannual BMP Recharge Volume volume) ; Represents Post-D Impervious Area lavg BMP Recharge Aimp sq.ft 100.0% {2% infitration (or target Impervious Area) Efficiency Rosana? , Rainfall Root Zone Water Capacity Rwe re became Runoff ieee i [Pdesign is accurate only after BMP dimensions are updated to make rech volume= deficit volume. The portion IRWC Modified to consider dEXC RWC [iam Seren |% or ewPi prierto fling and the area occupied by BMP cra ignored in these calculations. Resits are %Runoft g Factor EAtactor 167 [pounts IRecharged Sah ly sensetve to dBMP, make sure GEMP selected is small enough for BMP to emply in ess than 3 days. For land i. Rainfall Avereeie Atal P Fava hee bl Recharged eames |% Segment Location of BWP if you select “impervious areas” RWC vel be minimal bu nt zero a determined by Recharge Requirement " saee,, lover Imp. Area 2 i the soiltype and as is Lend Cover allowing consideration of lateral low and other losses, How to solve for different recharge volumes: By default the spreadshect assigns the values of tolal deficit recharge volume "VdeF and total proposed impervious area “Aimp” from the “Annual Recharge” sheet to "VdeF" and "Aimp" on this page. This allows solution for a single BMP to hanale the enlire recharge requirement assuming the runoff from entire impervious area is available to the BMP. To solve for a smaller BMP or a LID-IMP to recharge only part of the recharge requirement, set Vdef to your target value and Aimp to impervious area directly connected to your infiltration fi |ABMP
P. To solve for a smaller BMP or a LID-IMP to recharge only part of the recharge requirement, set Vdef to your target value and Aimp to impervious area directly connected to your infiltration fi |ABMP or BMP. To go back to the default configuration clik the "Default Vdef & Aimp" button, and then solve for
R Know what's below. Callbefore you dig. 11 2 1 - 14 4 NEW SOIL PERMEABILITY AND SEASONAL HIGH GROUNDWATER TESTING LOCATION FOWLE R DRIVE LAPIS CIRCLE HSG-D SOIL AREA = 421,633 SF 9.68 AC 10 9 8 15 SHEET AS SHOWN 18 40 Miller Drive Boonton, NJ 07005 TEl: 973.975.0703 CERTIFICATE OF AUTHORIZATION Fax: 973.975.0703 24GA28182400 www.pwanderson-cs.com 29 Scale DOG PARK Anderson Consulting Services LLC 27 PWA PWA Designed by 39 BCA C Checked by 5 35 ROSEMONT TERRACE C SLAYBACK TERRACE SIGNATURE INVALID WITHOUT RAISED SEAL OF P.E. N.J. PROFESSIONAL ENGINEER LIC. NO. 33410 PAUL W. ANDERSON 26 Drawn by P.S. IVE 30 HOWELL DRIVE Date Proj. No. 13 38 DR BU ILD IN G 32 PRELIMINARY AND FINAL SITE PLAN 19 FAIR MAY 28 RACE 12 P.S. Y TER 21 G D.2 22 BAKEL 3 33 BUILD IN BUILDING BAYOWSKI ROAD 6 OAD 16 .1 24 GD DIN BUILDING WARNE R R IL BU B BUILDING 7 NE B 17 LA G 20 FT IN LU SS CE NCY AC D IL KUZIK DRIVE 31 GE EMER BU HOLTON LANE HOWELL DRIVE 25 23 34 36 37 CLUBHOUSE BUILDING A.2 A.1 OA OF 66
File revisions (1)
- Sep 29, 2026
69ec9df8b1f435,202,335 bytes