105 Grove Street, Suite 3 Montclair, NJ 07042 973.954.2677 www.NishuaneGroup.com MEMORANDUM TO: Township of West Orange Planning Board CC: Jamilet Baquerizo Vite, Board Secretary John R. Dusinberre, Attorney for the Applicant Geniece Gary-Adams, Township of West Orange Zoning Official Philip Scott, PE, Planning Board Engineer FR: Gerard M. Haizel, PP, AICP, Principal & Consulting Planner RE: PB-24-15 - 31-35 Harrison Avenue (Block 141, Lot 1) Site Plan Review Advisory Board Report DT: October 8, 2024 Attendance: John R. Dusinberre, Esq., Attorney for the Applicant Luis Crespo, Principal of the Applicant Joseph Haines, Applicant’s Architect Lee Klein - Planning Board Member Jerry Guarino - Planning Board Member Mike Dannemiller - Zoning Board Member Irv Schwarbaum - Zoning Board Member Michale A. Fonzino - Director of Health Department Officer Pat Matullo - WOPD Traffic Division Jamilet Baquerizo Vite, Board Secretary Geniece Gary-Adams, Director of Planning & Development/Zoning Official Gerard M. Haizel - Nishuane Group, Board Planner Phil Scott - Matrix New World Engineering, Board Engineer The Township of West Orange Site Plan Review Advisory Board (SPRAB) held a meeting on October 8, 2024. At this meeting, the SPRAB reviewed the above referenced application with the applicant’s attorney and architect. The applicant was also present and provided information about the operation of the business and the need for the proposed addition. The applicant is proposing to construct a one-story, 2,130-SF addition to the rear of an existing commercial building. The proposed addition will trigger a side yard variance in addition to a parking variance.
October 8, 2024 Page 2 of 2 Site Plan Review Board Report 31-35 Harrison Avenue (PB-24-15) Block 141, Lot 1 105 Grove Street, Suite 3, Montclair, NJ 07042 ∙ Phone: (973) 954-2677 ∙ www.NishuaneGroup.com The following site plan and design issues were discussed at the meeting: Þ Layout of the Addition & Side Yard Variance The applicant’s architect, Joseph Haines, provided an overview of the proposed addition and how it will relate to the existing building. He explained the need for the proposed addition, which will accommodate equipment used in the applicant’s business. He explained how the proposed addition would fit and relate to the topography of the site, which decreases from its high point in the northwestern area of the site. He was asked about the stormwater runoff from the site in light of the topography and how the proposed addition would impact that. He further explained that the existing topography, coupled with the proposed grading on the southern side of the addition would channel the runoff into the rear yard of the adjoining property as is the current situation. Additionally, the roof runoff will be channeled to the existing drains and flow into the street. Þ Drainage Mr. Haines also identified the side yard setback variance being requested and how it relates to the adjacent property to the south. He explained how the desire to locate an 8- foot door at the southeastern area of the addition was driving the need for the variance. This door would facilitate deliveries and pickups of merchandise. He further detailed the alternative configurations that were considered to position the door so as to reduce or eliminate the need for the side yard variance. After some discussion, the applicant agreed to reduce the size of the door to a 6-foot width, which would reduce the side yard encroachment. Þ Parking Variance The business has an existing parking deficiency, which will be increased by the proposed addition. The applicant, Luis Crespo disclosed the number of employees and stated that there was no increase planned as a result of the proposed expansion. He explained how the business operated currently with the parking deficiency and how it would following the addition. He contended that the existing on-street parking was adequate, due to the nature of the business and the flow of customers. Þ Garbage and Recycling Mr. Crespo stated that the business
ng the addition. He contended that the existing on-street parking was adequate, due to the nature of the business and the flow of customers. Þ Garbage and Recycling Mr. Crespo stated that the business does not produce much garbage. Most of their refuse was cardboard boxes etc., which is kept in the building and put out for recycling pickup. The applicant’s professional team will make modifications to their submission, based on the input and discussions with the Township and Board Professionals and will work towards meeting the notice requirement for the Planning Board’s November 6 hearing date.
File revisions (1)
- Sep 29, 2026
d14d383d1b34156,839 bytes