Supporting Documentation · Dec 19, 2024
2024 07 10 Twp Submission Letter
2ec3231207cf0478d6aad2d552715317f14d2df19275d80a58df61416c487f2cIndexed text
www.dynamicec.com Lake Como, NJ • Chester, NJ • Toms River, NJ • Newark, NJ • Marlton, NJ • Newtown, PA • Philadelphia, PA Bethlehem, PA • Allen, TX • Houston, TX • Austin, TX • Delray Beach, FL • Annapolis, MD Dynamic Engineering Consultants, PC 1904 Main Street Lake Como, NJ 07719 T. 732-974-0198 July 10, 2024 Via FedEx 2-Day & Newforma Township of West Orange Planning Board 66 Main Street West Orange, NJ 07052 RE: Aaron Friedman Proposed Single-Family Residential Dwelling 10 Ridge Road Block 80.03, Lot 10 Township of West Orange Essex County, New Jersey DEC# 5142-24-00053 To Whom it May Concern, On behalf of the applicant, Aaron Friedman, this letter shall serve as the formal application to the Township of West Orange Planning Board towards issuance of Soil Removal Permit Approval for the above referenced project. Enclosed please find the following documents for your review: • One (1) check in the amount of $125.00, made payable to the “Township of West Orange”, to satisfy the Soil Permit Removal Application fee; • The Applicant will provide a check for the required escrow fee upon confirmation from the Township on the amount; • The Applicant will provide the certification of taxes being current under separate cover; • One (1) copy of the Township of West Orange Buffer Report for Block 80.03, Lot 10, created on 7/2/2024; • Six (6) completed and endorsed copies of the Township of West Orange Application Form for the Planning Board or Zoning Board of Adjustment for a Soil Removal Permit; • Six (6) completed and endorsed copies of the W-9 Form; • Six (6) signed and sealed copies of the ALTA/NSPS Land Title Survey, prepared by Dynamic Survey, LLC, dated 5/11/2022;
Township of West Orange July 10, 2024 Page 2 of 2 • Six (6) signed and sealed copies of the Soil Movement Permitting Plan, prepared by our office, dated 6/27/2024; and • Six (6) signed and sealed copies of the Site Plan drawings, prepared by our office, dated 3/5/2024, last revised 6/14/2024. Upon receipt, please review the enclosed documents towards issuance of Soil Removal Permit Approval for the above referenced project. Should you have any questions, comments or require additional information, please do not hesitate to contact our office. Sincerely, DYNAMIC ENGINEERING CONSULTANTS, PC Matthew J. Bersch, PE Danny Goncalves Enclosures cc: Aaron Friedman (via email)
File revisions (1)
- Sep 29, 2026
2ec3231207cf651,805 bytes