Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 29, 2025

Ordinance Amaneding and Supplementing Chapter 2 Subsecton 61 Pedestrian Advisory Board

Preserved file SHA-256c02da48a424a87e5dc640255d14d7f6ec38bec7f2f09f5597ae4d44f8d67d0fc

Indexed text

Page 6

Transit Amenities: Include seating, shelter and shade, wayfinding signage, trash and recycling cans, lighting, route information, bike infrastructure (lockers, racks, fix-it stations, depots, bikeshare, etc.). Transportation Facility: A facility consisting of the means and equipment necessary for the movement of people or goods; any road, bridge, tunnel, overpass, ferry, airport, mass transit facility, vehicle parking facility, port facility or similar commercial facility used for the transportation of persons or goods together with any buildings, structures, parking areas, appurtenances, and other property needed to operate such facility; however, a commercial or retail use or enterprise not essential to the transportation of people or goods shall not be considered a transportation facility. Transportation Project: Any public and/or private land development, project, program, or practice that affects the transportation network or occurs in the public right-of-way, including any construction, reconstruction, retrofit, signalization operations, resurfacing, restriping, rehabilitation, maintenance (excluding routine maintenance that does not change the roadway geometry or operations, such as mowing, sweeping, and spot repair), operations, alteration, and repair of any public street or roadway within a jurisdiction (including alleys, bridges, frontage roads, and other elements of the transportation system). Public Participation 1. The Mayor shall establish a Complete and Green Streets Advisory Committee to help the Township of West Orange comply with the Complete and Green Streets Ordinance and to provide ongoing feedback to the Municipality related to the implementation of the Complete and Green Streets Ordinance. The Complete and Green Streets Advisory Committee shall consist of a broad group of stakeholders including: a. Municipal Elected Officials b. Law Enforcement c. Public Works d. Planners e. Engineers f. Emergency Medical Services (EMS) g. Appointed Municipal or County Commissioners h. Fire i. Schools j. Business and Developer Community k. Civic and Advocacy Groups l. Public Health Professionals m. Transit Professionals n. Community Members, including Persons with Disabilities, Senior and Youth Organizations, Persons Representing Priority Communities January 2025 6 of 26

Page 7

o. EZ Ride, Regional Transportation Management Association p. Pedestrian Safety Advisory Board. Beginning with the planning stage, Township of West Orange shall identify an existing process or develop a new process that allows for public participation in decision-making concerning the planning, design, and use of streets and roadways covered by this Policy. Exceptions 1. A transportation project may not be required to accommodate the needs of a particular user group if the Council’s representative determines in writing that: a. The use of the transportation facility by the particular user group is prohibited by law; b. Regulatory compliance requirements preclude accommodations. c. There is a demonstrated absence of both a current and future need to accommodate the category of user (absence of future need may be shown via demographic, school, employment, and public transportation route data that demonstrate, for example, a low likelihood of bicycle, pedestrian, or transit activity in an area over the next 20 years); and d. The adverse impacts of implementing this Complete and Green Streets Policy significantly outweigh the benefits e. In New Jersey, relatively few roads are closed to bicycle traffic. However, toll roads and some freeways, including interstates, are closed to bicyclists f. Wetlands on both sides of a narrow roadway could pose a significant environmental constraint, preventing the construction of separated and adjacent bicycle facilities. If so, other accommodations should be explored to improve safety for bicyclists, for example, adding “sharrows” or identifying alternative convenient bike routes. 2. However, every effort to work within the flexibility allowed should be made, including Design Exceptions for roadway projects. 3. An exception shall be granted only if: a. Request for an exception is submitted in writing to the Council with supporting documentation, and made publicly available with a minimum of 30 days allowed for public input; and b. The exception is approved in writing by the Council, and the written approval is made publicly available. Program Reporting January 2025 7 of 26

Page 8

1. The Land Use Board for Planning and Zoning shall establish benchmarks reflecting the ability of all users to travel safely and conveniently along highways, roads and streets. 2. Each such Land Use Board for Planning and Zoning shall also develop plans and set benchmarks to ensure the successful implementation of the Complete and Green Streets policy in Priority Communities consistent with Environmental Justice principals. On or before of each end of the fiscal year each such agency shall prepare an initial report to identify barriers, and propose solutions to successful implementation of the Complete and Green Streets policy including in Priority Communities. 3. Each such Land Use Board for Planning and Zoning shall assign appropriate responsibility to collect and monitor data under municipal jurisdiction, including in Priority Communities, to determine compliance with the Township’s benchmarks. Benchmarks shall include but are not limited to: a. Mileage of new and existing bicycle infrastructure, including in Priority Communities (e.g., bicycle lanes, bike parking, paths, and boulevards) b. Linear feet (or mileage) of new and existing pedestrian infrastructure (e.g., sidewalks, trails, transit amenities) c. Number of new and existing ADA-compliant infrastructure (e.g., curb ramps, pedestrian buttons) d. Number of new and existing street trees e. Number of green street practices (e.g., rain gardens, bioswales, permeable pavement) f. Number of new and existing pedestrian and bicycle lighting improvements g. Bicycle and pedestrian counts h. Commute mode percentages (e.g., drive alone, carpool, transit, bicycle, walk) i. The number and percentage of designated transit stops accessible via sidewalks and curb ramps j. The number, locations, and causes of collisions, injuries, and fatalities by each mode of transportation k. The percentage of children walking or bicycling to school 4. All benchmarks established by the Township of West Orange shall be disaggregated by race/ethnicity, neighborhood, and vehicle ownership when feasible. 5. Each such Land Use Board for Planning and Zoning shall provide a report on an annual basis to the Council to allow them to evaluate implementation of the Complete Street policy. Each annual report shall include the data collected pursuant to Program Reporting, as well as a list of ongoing and completed transportation projects

Page 8

uate implementation of the Complete Street policy. Each annual report shall include the data collected pursuant to Program Reporting, as well as a list of ongoing and completed transportation projects during that fiscal year. If any exceptions are applied to transportation projects pursuant to Exceptions to Complete and Green Streets Requirements herein, such projects and the relevant exceptions should be identified in the annual report. All benchmarks and reports shall be made publicly available online. January 2025 8 of 26

Page 9

Adoption of Complete and Green Streets Checklists 1. The Land Use Board for Planning and Zoning shall develop and adopt one or more Complete and Green Streets Checklists to be used during the project selection, planning, designing, construction, funding and maintenance of all transportation projects. 2. Each item in the checklist must include an area to provide a brief description for how the item is addressed, not addressed, or not applicable to the Complete and Green Streets policy. 3. The checklist shall explain the process for granting exceptions and indicate who is responsible for approving any exceptions before they are granted. 4. The Land Use Board for Planning and Zoning shall be responsible for completing the checklists and/or reviewing the checklists. 5. A Complete and Green Streets checklist shall entail but is not limited to: a. Existing pedestrian, bicycle, transit, motor vehicle, and truck/freight accommodations (facilities) and operations b. Traffic volumes c. Existing safety and/or access issues, and Americans with Disabilities Act (ADA) compliance d. Land use within the study area, including trip generators e. Existing and proposed streetscape elements including furniture, trees or other environmental and stormwater enhancements f. Review of existing plans g. Proposed pedestrian, bicycle, transit, motor vehicle, and truck/freight accommodations (facilities) and desired future operations h. ADA compliance of the proposed design i. Compatibility with the surrounding land use and density j. Consistency with applicable design standards and guidelines k. Opportunities to improve public health through physical activity and mobility options l. Opportunities to manage stormwater through green infrastructure 6. All Complete and Green Street checklists shall be made accessible online and available to the Complete and Green Streets Advisory Body. Effective Date The Complete and Green Streets policy shall take effect on February 11, 2025 provided that it shall not apply to any transportation project for which a preliminary design has been completed on or before December 31, 2024. January 2025 9 of 26

Page 10

NOW THEREFORE, BE IT RESOLVED, the Township of West Orange adopts the Complete and Green Streets Policy attached hereto, and made part of this Ordinance; NOW, THEREFORE, be it resolved that the Mayor and Municipal Council adopts the attached Complete Streets Policy, goals and objectives. BE IT FURTHER ORDAINED, that the remainder of Chapter 2 shall remain unchanged. BE IT FURTHER ORDAINED, that any ordinances or parts thereof in conflict with the provisions of this Ordinance are repealed to the extent of such conflict. BE IT FURTHER RESOLVED that a copy of this Resolution be published in the West Orange Chronicle within ten (10) days of its approval as required by State Statute. _______________________________________ _______________________________________ Karen J. Carnevale, Municipal Clerk Joe Krakoviak, Council President ___________________________________ Susan McCartney, Mayor Introduced: Adopted: January 2025 10 of 26

Page 11

XXXX-25 LEGISLATIVE HISTORY This Ordinance amends and supplements Chapter 2-61: “Pedestrian Safety Advisory Board” of the Township’s Revised General Ordinances to include to create a complete and green streets advisory committee and amending a complete and green streets policy. This policy provides the Township with a strong and effective strategy for achieving Complete and Green Streets. The complete green streets policy provides the Township the opportunity to meet the criteria needed to gain recognition and apply for grant funds. January 2025 11 of 26

Page 12

January 2025 12 of 26

Page 13

Concept Development Checklist item to be addressed EXISTING BICYCLE, PEDESTRIAN AND TRANSIT ACCOMMODATIONS checklist consideration yes no n/a required description Are there accommodations for bicyclists, pedestrians (including ADA compliance) and transit users included on or crossing the current facility? Examples include (but are not limited to): • Sidewalks • Signalized or protected crosswalks • Pedestrian-scale lighting • Multi-use trails • Public seating • Bike racks • Transit shelters EXISTING BICYCLE AND PEDESTRIAN OPERATIONS Has the existing bicycle level of traffic stress and pedestrian suitability on the current transportation facility been identified? Have the bicycle and pedestrian conditions within the study area, including pedestrian and/or bicyclist treatments, volumes, important connections and lighting been identified? Do bicyclists/pedestrians regularly use the transportation facility for commuting or recreation? Are there physical or perceived impediments to bicyclist or pedestrian use of the transportation facility? Revised January 2025 12 of 26

Page 14

Concept Development Checklist item to be addressed EXISTING BICYCLE AND PEDESTRIAN OPERATIONS (continued) checklist consideration yes no n/a required description Have the existing volumes of pedestrian and/or bicyclist crossing activity at intersections including midblock and nighttime crossing been collected/provided? Are there multi-use trails in the area that can be connected to this transit center/bus stop/network/area? EXISTING TRANSIT OPERATIONS Are there existing transit facilities within the project area, including bus and train stops/stations? Is the transportation facility on a transit route? Is the transportation facility within two miles of “park and ride” or “kiss and go” lots? PUBLIC PARTICIPATION Are there existing or proposed amenities including pedestrian seating/shelters, bicycle racks or parking available at these lots or transit stations? Are there bike racks on buses that travel along the facility? Has there been a clear process for public participation? Are project Concept Development Checklists currently available on-line? Revised January 2025 13 of 26

File revisions (1)