Supporting Documentation · Mar 20, 2025
2025 02 West Orange EIS Signed
7f503eace1b7a490079cdcad56c2e9c8d55276909bfdbc54084af3b2f3c201cbIndexed text
e state of New Jersey has been Environmental Impact Statement 4 June 2024 DEC #1021-99-025 Last Revised February 2025
monitoring air quality since 1965. During that time, as a result of state, regional and national air pollution reduction efforts, pollution levels have improved significantly. This report includes detailed chapters for ozone, particulate matter, sulfur dioxide, nitrogen dioxide, carbon monoxide and lead. These are the criteria pollutants, that is, those for which National Ambient Air Quality Standards (NAAQS), or criteria, have been set. Other measurements made at our air monitoring stations and discussed in this report include air toxics, ozone precursors, and chemical components of airborne fine particles. The Air Quality Index (AQI) is a national air quality rating system based on the National Ambient Air Quality Standards (NAAQS). An index value of 100 is equal to the primary, or health-based, NAAQS for each pollutant. This allows for a comparison of each of the pollutants used in the AQI. These pollutants are ozone, particulate matter, carbon monoxide, sulfur dioxide, and nitrogen dioxide. Although air concentrations of pollutants have been dropping over the past few years, the U.S. Environmental Protection Agency (USEPA) periodically reviews the NAAQS to make sure that they are protective of public health, and adjusts them accordingly in response to new research.” Environmental Impact Statement 5 June 2024 DEC #1021-99-025 Last Revised February 2025
The nearest monitoring location is in Paterson, NJ and this monitoring station includes ozone and particle matter. The 2022 report is provided below: Environmental Impact Statement 6 June 2024 DEC #1021-99-025 Last Revised February 2025
K. Noise The project site is located in a suburban residential atmosphere. Ambient noise conditions onsite are mostly associated with the traffic along Eagle Rock Avenue. The property is currently vacant and therefore does not generate any noise. Per the NJDEP Compliance and Enforcement website: “the NJDEP promulgated noise regulations to control noise from stationary commercial and industrial sources in 1974, pursuant to the Noise Control Act of 1971, N.J.S.A. 13:1G-1 et seq. Within the noise regulations, there are established sound level standards of 50 decibels during nighttime (10:00 p.m. to 7:00 a.m.) and 65 decibels during daytime.” The local noise regulation is set forth in Chapter 4 of the Code of the Township of West Orange. Section 4-4 (Noise) provides language that subjectively prohibits “excessively loud and disturbing noise which injures or endangers the health, comfort or safety of others within the limits of the township,” and does not provide any quantitative sound level limits. L. Cultural/Historical Resources Per NJDEP GeoWeb Mapping, there are no mapped historic districts nor historic properties associated with the site or at adjacent properties. The site is also not located within an archaeological site grid. The NJDEP NJ-GeoWeb Map Viewer data layers entitled “NJDEP Historic Properties of New Jersey”, “NJDEP Historic Districts of New Jersey” and “NJDEP Archaeological Site Grid of New Jersey” were reviewed. The Historic Properties, Historic Districts and Archaeological Site Grid data layers display historic properties and archaeological grids that are either included in the New Jersey or National Registers of Historic Places, have been determined eligible for inclusion through federal or state processes as administered by the Environmental Impact Statement 7 June 2024 DEC #1021-99-025 Last Revised February 2025
New Jersey Historic Preservation Office (HPO), or have been identified through cultural resource survey or other documentation on file at the HPO. There are no historic properties, historic districts or archaeological grid sites mapped on or within the vicinity of the site. M. Land Use The site is located at 470 Eagle Rock Avenue (CR 611) and is identified as Block 153, Lot 38 on the Township of West Orange Tax Map Sheet No. 84. The site is currently occupied by a vacant 1-story building which was previously used as a restaurant. The site is located within the B-2 (General Business) Zone where restaurants are a permitted use with fast food restaurants being a permitted conditional use. The B-2 Zone permitted principal uses include: • Retail stores • Personal service stores or studios • Offices or office buildings • Businesses or vocational schools • Restaurants • Bars • Massage, bodywork, or somatic therapy establishments • Fitness centers/health clubs The B-2 Zone extends to the north, east and southwest of the property. The R-6 Residential Zone borders the property to the west along Rosney Terrace. 4. Potential Impacts and Environmental Performance Controls and Mitigation This section describes the potential impacts of the proposed development and the environmental performance controls and mitigation measures that will be utilized to minimize or eliminate potentially adverse environmental impacts. These controls and mitigation measures will be planned and implemented during construction and operated subsequent to completion of the proposed project. Environmental Impact Statement 8 June 2024 DEC #1021-99-025 Last Revised February 2025
A. Vegetation There will be an unavoidable impact regarding the removal of existing vegetation in order to construct the proposed development. Areas within the development footprint of the site will be cleared for construction. Existing vegetation cannot be preserved in the development area due to the proposed site improvements and changes in grading. The proposed development results in a decrease in impervious coverage, which will provide for an increase in vegetated areas post construction. There will be controls implemented to mitigate disturbance to vegetation outside the development footprint. The limits of disturbance will be field located and construction activities will be limited accordingly. Areas beyond the established limits of disturbance will be preserved in their existing condition. Where appropriate, silt fence and tree protection fence will be utilized to establish the limit of construction and/or to protect vegetation that is to remain. As a mitigation to offset the loss of vegetation, additional landscaping will be incorporated into the proposed pervious areas. The landscaping is designed to generally comply with the Township of West Orange Ordinance requirements, complement the proposed buildings, roadways and other hardscape improvements, to provide aesthetic appeal to the development and to provide shade, screening and buffering of proposed improvements and to/from adjacent properties. B. Wildlife There are no known wildlife habitats within the site or at adjacent properties. Therefore, it is not anticipated that the proposed project will adversely affect any wildlife. C. Soil There is a temporary impact to existing on-site soil. On-site soil will be regraded as part of the development. However, the proposed development has been designed in accordance with the New Jersey Standards for Soil Erosion and Sediment Control in order to mitigate any impacts of soil erosion and sedimentation resulting from construction and the completed development. The first set of controls that will be implemented prior to and during construction will include the following: Environmental Impact Statement 9 June 2024 DEC #1021-99-025
include the following: Environmental Impact Statement 9 June 2024 DEC #1021-99-025 Last Revised February 2025
• Stabilized construction entrance (stone anti-tracking pad) at construction entrance; • Haybale sediment filters; • Silt fencing along limit of disturbance; • Tree protection fence where appropriate along limit of disturbance; • Stabilizing soil stockpiles with temporary vegetative cover; • Minimizing disturbance to vegetation; • Inlet filters; • Storm inlet filter bags; and • Conduit outlet protection. The second set of controls that will be utilized is construction timing. • Install stone anti-tracking pad, tree protection and silt fencing; • Clear and rough grade; • Excavate, construct and stabilize the underground piping and drainage structures; • Complete building construction; • Excavate and install remaining on-site improvements; • Final grading; and • Install paving, concrete and landscaping. Upon completion, most of these devices will be removed except for those that will become part of the permanent system. The final controls will include the completed stormwater management system and the permanent landscaping. D. Degradation of Groundwater Quality There is no predicted impact to groundwater quality. The major impacts to groundwater quality from the development are typically untreated stormwater recharge and subsurface sewage disposal systems. Due to the proposed reduction in impervious coverage, the proposed development meets the water quality requirements for stormwater design under NJAC 7:8. Additionally, the project does not propose any subsurface sewage disposal system. All sanitary effluent will be serviced by public sanitary sewer mains and public wastewater treatment facilities. E. Flooding There is no predicted impact associated with flooding. Stormwater runoff resulting from the proposed improvements has been designed to maintain existing drainage patterns. Ten (10) Environmental Impact Statement 10 June 2024 DEC #1021-99-025 Last Revised February 2025
additional inlets are proposed within the site to assist in collecting stormwater runoff from the project area, which are routed via a series of underground reinforced concrete pipes ultimately tributary to the existing inlet within Rosney Terrace. Due to the reduction in impervious coverage, the volume and peak discharge runoff rates for the 2-, 10- & 100-year design storms have been reduced. As such, there shall be no adverse impacts to the properties located upstream and downstream of the site. Based upon the fact that the proposed improvements will result in more than one (1) acre of land disturbance, this project is classified as a “major development” and is subject to compliance with the Stormwater Regulations set forth in NJAC 7:8. The proposed development has been designed to meet the water quantity and groundwater recharge requirements set forth by the Township of West Orange Land Development Ordinance and NJAC 7:8. F. Degradation of Surface Water Quality There is no predicted impact to surface water quality. The proposed development results in a decrease in motor vehicle surface and therefore provides for an increase in surface water quality complying with the water quality standards set forth in NJAC 7:8. G. Degradation of Freshwater Wetlands The proposed development does not impact freshwater wetlands or wetlands transition areas, therefore there will be no degradation to freshwater wetlands or transition areas on- site. H. Water Supply There is no predicted impact to water supply. The water service for the proposed development will be provided by a proposed 2” water line for domestic service and a proposed 6” water line for fire service. Each line will connect to the existing water main within Rosney Terrace. The estimated domestic water demand for the two uses is approximately 3,180 GPD. I. Sewage Disposal There is no predicted impact to sewage disposal. Each of the two uses will be serviced by a proposed 4” sanitary sewer lateral. The laterals will each discharge to the existing sanitary sewer main located within Eagle Rock Avenue via separate saddle connections. Each use Environmental Impact Statement 11 June 2024 DEC #1021-99-025
ate saddle connections. Each use Environmental Impact Statement 11 June 2024 DEC #1021-99-025 Last Revised February 2025
File revisions (1)
- Sep 29, 2026
7f503eace1b716,151,162 bytes