Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 10, 2024

complete drainage report rev 9

Preserved file SHA-2560e69db2cf67e6dbdea5b757902b09270a6560667c8ebecd3dc74327e4422cf0d

Indexed text

Page 594

POA-2 NJ DEP 2-hr WQ Rainfall=1.25" 2024-05-12 HydroCad - Proposed POA 2B-1 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 332 Summary for Subcatchment 28S: Basin 2 - Imp Runoff = 1.76 cfs @ 1.15 hrs, Volume= Routed to Pond 27P : Basin 2 2,601 cf, Depth= 1.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs NJ DEP 2-hr WQ Rainfall=1.25" * * Area (sf) 28,866 1,307 30,173 30,173 CN 98 98 98 Description Paved parking, sidewalk, other imp Paved parking, sidewalk other imp Weighted Average 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 93 0.0500 0.17 Sheet Flow, Sheet Flow (A-B) Grass: Dense n= 0.240 P2= 3.47" Using McCuen-Spiess flow length 1.5 370 0.0650 4.10 Shallow Concentrated Flow, SCF (B-C) Unpaved Kv= 16.1 fps 10.5 463 Total Sheet Flow (A-B) SCF (B-C) Subcatchment 28S: Basin 2 - Imp

Page 595

POA-2 NJ DEP 2-hr WQ Rainfall=1.25" 2024-05-12 HydroCad - Proposed POA 2B-1 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 333 Subcatchment 28S: Basin 2 - Imp Hydrograph Runoff Flow (cfs) 1.76 cfs 1 NJ DEP 2-hr WQ Rainfall=1.25" Runoff Area=30,173 sf Runoff Volume=2,601 cf Runoff Depth=1.03" Flow Length=463' Tc=10.5 min CN=98 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 Time (hours)

Page 596

POA-2 NJ DEP 2-hr WQ Rainfall=1.25" 2024-05-12 HydroCad - Proposed POA 2B-1 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 28S: Basin 2 - Imp Time Precip. Excess (hours) (inches) (inches) 0.00 0.00 0.00 0.80 0.23 0.09 1.60 1.18 0.97 2.40 1.25 1.03 3.20 1.25 1.03 4.00 1.25 1.03 4.80 1.25 1.03 5.60 1.25 1.03 6.40 1.25 1.03 7.20 1.25 1.03 8.00 1.25 1.03 8.80 1.25 1.03 9.60 1.25 1.03 10.40 1.25 1.03 11.20 1.25 1.03 12.00 1.25 1.03 12.80 1.25 1.03 13.60 1.25 1.03 14.40 1.25 1.03 15.20 1.25 1.03 16.00 1.25 1.03 16.80 1.25 1.03 17.60 1.25 1.03 18.40 1.25 1.03 19.20 1.25 1.03 20.00 1.25 1.03 20.80 1.25 1.03 21.60 1.25 1.03 22.40 1.25 1.03 23.20 1.25 1.03 24.00 1.25 1.03 24.80 1.25 1.03 25.60 1.25 1.03 26.40 1.25 1.03 27.20 1.25 1.03 28.00 1.25 1.03 28.80 1.25 1.03 29.60 1.25 1.03 30.40 1.25 1.03 31.20 1.25 1.03 32.00 1.25 1.03 32.80 1.25 1.03 33.60 1.25 1.03 34.40 1.25 1.03 35.20 1.25 1.03 36.00 1.25 1.03 36.80 1.25 1.03 37.60 1.25 1.03 38.40 1.25 1.03 39.20 1.25 1.03 40.00 1.25 1.03 Runoff (cfs) 0.00 0.16 0.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Time Precip. Excess (hours) (inches)

Page 596

00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Time Precip. Excess (hours) (inches) (inches) 40.80 1.25 1.03 41.60 1.25 1.03 42.40 1.25 1.03 43.20 1.25 1.03 44.00 1.25 1.03 44.80 1.25 1.03 45.60 1.25 1.03 46.40 1.25 1.03 47.20 1.25 1.03 48.00 1.25 1.03 48.80 1.25 1.03 49.60 1.25 1.03 50.40 1.25 1.03 51.20 1.25 1.03 52.00 1.25 1.03 52.80 1.25 1.03 53.60 1.25 1.03 54.40 1.25 1.03 55.20 1.25 1.03 56.00 1.25 1.03 56.80 1.25 1.03 57.60 1.25 1.03 58.40 1.25 1.03 59.20 1.25 1.03 60.00 1.25 1.03 60.80 1.25 1.03 61.60 1.25 1.03 62.40 1.25 1.03 63.20 1.25 1.03 64.00 1.25 1.03 64.80 1.25 1.03 65.60 1.25 1.03 66.40 1.25 1.03 67.20 1.25 1.03 68.00 1.25 1.03 68.80 1.25 1.03 69.60 1.25 1.03 70.40 1.25 1.03 71.20 1.25 1.03 72.00 1.25 1.03 72.80 1.25 1.03 73.60 1.25 1.03 74.40 1.25 1.03 75.20 1.25 1.03 76.00 1.25 1.03 76.80 1.25 1.03 77.60 1.25 1.03 78.40 1.25 1.03 79.20 1.25 1.03 80.00 1.25 1.03 Runoff (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Printed 10/25/2024 Page 334

Page 597

POA-2 NJ DEP 2-hr WQ Rainfall=1.25" 2024-05-12 HydroCad - Proposed POA 2B-1 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 335 Summary for Subcatchment 29S: Basin 8 - Imp Runoff = 2.37 cfs @ 1.13 hrs, Volume= Routed to Pond 48P : Basin 8 3,298 cf, Depth= 1.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs NJ DEP 2-hr WQ Rainfall=1.25" * * Area (sf) 8,924 11,475 17,858 38,257 38,257 CN 98 98 98 98 Description other impervious Roofs, HSG C pavement surface Weighted Average 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.3 100 0.0700 0.20 Sheet Flow, Sheet Flow (A-B) Grass: Dense n= 0.240 P2= 3.47" 0.3 65 0.0600 3.94 Shallow Concentrated Flow, SCF (B-C) Unpaved Kv= 16.1 fps 8.6 165 Total Sheet Flow (A-B) Subcatchment 29S: Basin 8 - Imp SCF (B-C)

Page 598

POA-2 NJ DEP 2-hr WQ Rainfall=1.25" 2024-05-12 HydroCad - Proposed POA 2B-1 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 336 Subcatchment 29S: Basin 8 - Imp Hydrograph Runoff 2.37 cfs Flow (cfs) 2 1 NJ DEP 2-hr WQ Rainfall=1.25" Runoff Area=38,257 sf Runoff Volume=3,298 cf Runoff Depth=1.03" Flow Length=165' Tc=8.6 min CN=98 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 Time (hours)

Page 599

POA-2 NJ DEP 2-hr WQ Rainfall=1.25" 2024-05-12 HydroCad - Proposed POA 2B-1 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 29S: Basin 8 - Imp Time Precip. Excess (hours) (inches) (inches) 0.00 0.00 0.00 0.80 0.23 0.09 1.60 1.18 0.97 2.40 1.25 1.03 3.20 1.25 1.03 4.00 1.25 1.03 4.80 1.25 1.03 5.60 1.25 1.03 6.40 1.25 1.03 7.20 1.25 1.03 8.00 1.25 1.03 8.80 1.25 1.03 9.60 1.25 1.03 10.40 1.25 1.03 11.20 1.25 1.03 12.00 1.25 1.03 12.80 1.25 1.03 13.60 1.25 1.03 14.40 1.25 1.03 15.20 1.25 1.03 16.00 1.25 1.03 16.80 1.25 1.03 17.60 1.25 1.03 18.40 1.25 1.03 19.20 1.25 1.03 20.00 1.25 1.03 20.80 1.25 1.03 21.60 1.25 1.03 22.40 1.25 1.03 23.20 1.25 1.03 24.00 1.25 1.03 24.80 1.25 1.03 25.60 1.25 1.03 26.40 1.25 1.03 27.20 1.25 1.03 28.00 1.25 1.03 28.80 1.25 1.03 29.60 1.25 1.03 30.40 1.25 1.03 31.20 1.25 1.03 32.00 1.25 1.03 32.80 1.25 1.03 33.60 1.25 1.03 34.40 1.25 1.03 35.20 1.25 1.03 36.00 1.25 1.03 36.80 1.25 1.03 37.60 1.25 1.03 38.40 1.25 1.03 39.20 1.25 1.03 40.00 1.25 1.03 Runoff (cfs) 0.00 0.23 0.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Time Precip. Excess (hours) (inches)

Page 599

00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Time Precip. Excess (hours) (inches) (inches) 40.80 1.25 1.03 41.60 1.25 1.03 42.40 1.25 1.03 43.20 1.25 1.03 44.00 1.25 1.03 44.80 1.25 1.03 45.60 1.25 1.03 46.40 1.25 1.03 47.20 1.25 1.03 48.00 1.25 1.03 48.80 1.25 1.03 49.60 1.25 1.03 50.40 1.25 1.03 51.20 1.25 1.03 52.00 1.25 1.03 52.80 1.25 1.03 53.60 1.25 1.03 54.40 1.25 1.03 55.20 1.25 1.03 56.00 1.25 1.03 56.80 1.25 1.03 57.60 1.25 1.03 58.40 1.25 1.03 59.20 1.25 1.03 60.00 1.25 1.03 60.80 1.25 1.03 61.60 1.25 1.03 62.40 1.25 1.03 63.20 1.25 1.03 64.00 1.25 1.03 64.80 1.25 1.03 65.60 1.25 1.03 66.40 1.25 1.03 67.20 1.25 1.03 68.00 1.25 1.03 68.80 1.25 1.03 69.60 1.25 1.03 70.40 1.25 1.03 71.20 1.25 1.03 72.00 1.25 1.03 72.80 1.25 1.03 73.60 1.25 1.03 74.40 1.25 1.03 75.20 1.25 1.03 76.00 1.25 1.03 76.80 1.25 1.03 77.60 1.25 1.03 78.40 1.25 1.03 79.20 1.25 1.03 80.00 1.25 1.03 Runoff (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Printed 10/25/2024 Page 337

Page 600

POA-2 NJ DEP 2-hr WQ Rainfall=1.25" 2024-05-12 HydroCad - Proposed POA 2B-1 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 338 Summary for Subcatchment 30S: Basin 8 - Perv Runoff = 0.13 cfs @ 1.21 hrs, Volume= Routed to Pond 48P : Basin 8 222 cf, Depth= 0.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-80.00 hrs, dt= 0.04 hrs NJ DEP 2-hr WQ Rainfall=1.25" Area (sf) 11,542 11,245 22,787 22,787 CN 80 74 77 Description >75% Grass cover, Good, HSG D >75% Grass cover, Good, HSG C Weighted Average 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.3 100 0.0700 0.20 Sheet Flow, Sheet Flow (A-B) Grass: Dense n= 0.240 P2= 3.47" 0.3 65 0.0600 3.94 Shallow Concentrated Flow, SCF (B-C) Unpaved Kv= 16.1 fps 8.6 165 Total Sheet Flow (A-B) Subcatchment 30S: Basin 8 - Perv SCF (B-C)

Page 601

POA-2 NJ DEP 2-hr WQ Rainfall=1.25" 2024-05-12 HydroCad - Proposed POA 2B-1 Prepared by Anderson Consulting Services HydroCAD® 10.20-5c s/n 06666 © 2023 HydroCAD Software Solutions LLC Printed 10/25/2024 Page 339 Subcatchment 30S: Basin 8 - Perv Hydrograph Runoff 0.14 0.13 cfs 0.13 0.12 0.11 0.1 Flow (cfs) 0.09 0.08 0.07 0.06 0.05 0.04 0.03 NJ DEP 2-hr WQ Rainfall=1.25" Runoff Area=22,787 sf Runoff Volume=222 cf Runoff Depth=0.12" Flow Length=165' Tc=8.6 min CN=77 0.02 0.01 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 Time (hours)

File revisions (1)