Stormwater Report 1
78d1b4e6ebbc56232a16c000e8163bf57cdac98dcbe40e7c7304162200bff44aIndexed text
4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Monday, 12 / 30 / 2024 Hyd. No. 1 DA-EX Pervious Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff Peak discharge = 2.575 cfs = 2 yrs Time to peak = 12.20 hrs = 6 min Hyd. volume = 10,947 cuft = 1.520 ac Curve number = 80 = 0.0 % Hydraulic length = 0 ft = User Time of conc. (Tc) = 11.70 min = 4.09 in Distribution = Custom = S:\Petry Engineering Cad Projects\2024\24-170 Shape factor - Baginski = 484 - Manor - West Orange DA-EX Pervious Q (cfs) Q (cfs) Hyd. No. 1 -- 2 Year 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 Hyd No. 1 6 8 10 12 14 16 18 20 22 24 26 Time (hrs)
5 Precipitation Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Monday, 12 / 30 / 2024 Hyd. No. 1 DA-EX Pervious Storm Frequency Total precip. Storm duration = 2 yrs Time interval = 6 min = 4.0900 in Distribution = Custom = S:\Petry Engineering Cad Projects\2024\24-170 - Baginski - Manor - West Orang Incremental Rainfall Precipitation Precip (in) Precip (in) Hyd. No. 1 : DA-EX Pervious - 2 Year 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 Time (hrs) Custom Design Storm -- S:\Petry Engineering Cad Projects\2024\24-170 - Baginski - Manor - West Orange\Civil\Curre
6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Monday, 12 / 30 / 2024 Hyd. No. 2 DA-EX Impervious Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff Peak discharge = 8.541 cfs = 2 yrs Time to peak = 12.20 hrs = 6 min Hyd. volume = 41,455 cuft = 3.160 ac Curve number = 98 = 0.0 % Hydraulic length = 0 ft = User Time of conc. (Tc) = 11.70 min = 4.09 in Distribution = Custom = S:\Petry Engineering Cad Projects\2024\24-170 Shape factor - Baginski = 484 - Manor - West Orange DA-EX Impervious Q (cfs) Q (cfs) Hyd. No. 2 -- 2 Year 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 Hyd No. 2 6 8 10 12 14 16 18 20 22 24 26 Time (hrs)
7 Precipitation Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Monday, 12 / 30 / 2024 Hyd. No. 2 DA-EX Impervious Storm Frequency Total precip. Storm duration = 2 yrs Time interval = 6 min = 4.0900 in Distribution = Custom = S:\Petry Engineering Cad Projects\2024\24-170 - Baginski - Manor - West Orang Incremental Rainfall Precipitation Precip (in) Precip (in) Hyd. No. 2 : DA-EX Impervious - 2 Year 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 Time (hrs) Custom Design Storm -- S:\Petry Engineering Cad Projects\2024\24-170 - Baginski - Manor - West Orange\Civil\Curre
8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Monday, 12 / 30 / 2024 Hyd. No. 3 <no description> Hydrograph type Storm frequency Time interval Inflow hyds. = Combine = 2 yrs = 6 min = 1, 2 Peak discharge Time to peak Hyd. volume Contrib. drain. area = 11.12 cfs = 12.20 hrs = 52,402 cuft = 4.680 ac <no description> Q (cfs) Q (cfs) Hyd. No. 3 -- 2 Year 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 Hyd No. 3 6 8 10 Hyd No. 1 12 14 16 Hyd No. 2 18 20 22 24 26 Time (hrs)
9 Hydrograph Summary Report Hyd. Hydrograph No. type (origin) Peak flow (cfs) Time Time to interval Peak (min) (min) Hyd. volume (cuft) Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 4.965 6 732 21,295 ------ ------ ------ DA-EX Pervious 2 SCS Runoff 13.37 6 732 65,937 ------ ------ ------ DA-EX Impervious 3 Combine 18.33 6 732 87,232 1, 2 ------ ------ <no description> Proposed - Future Projected.gpw Return Period: 10 Year Monday, 12 / 30 / 2024
10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Monday, 12 / 30 / 2024 Hyd. No. 1 DA-EX Pervious Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff Peak discharge = 4.965 cfs = 10 yrs Time to peak = 12.20 hrs = 6 min Hyd. volume = 21,295 cuft = 1.520 ac Curve number = 80 = 0.0 % Hydraulic length = 0 ft = User Time of conc. (Tc) = 11.70 min = 6.37 in Distribution = Custom = S:\Petry Engineering Cad Projects\2024\24-170 Shape factor - Baginski = 484 - Manor - West Orange DA-EX Pervious Q (cfs) Q (cfs) Hyd. No. 1 -- 10 Year 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 Hyd No. 1 6 8 10 12 14 16 18 20 22 24 26 Time (hrs)
11 Precipitation Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Monday, 12 / 30 / 2024 Hyd. No. 1 DA-EX Pervious Storm Frequency Total precip. Storm duration = 10 yrs Time interval = 6 min = 6.3700 in Distribution = Custom = S:\Petry Engineering Cad Projects\2024\24-170 - Baginski - Manor - West Orang Incremental Rainfall Precipitation Precip (in) Precip (in) Hyd. No. 1 : DA-EX Pervious - 10 Year 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 Time (hrs) Custom Design Storm -- S:\Petry Engineering Cad Projects\2024\24-170 - Baginski - Manor - West Orange\Civil\Curre
12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Monday, 12 / 30 / 2024 Hyd. No. 2 DA-EX Impervious Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff Peak discharge = 13.37 cfs = 10 yrs Time to peak = 12.20 hrs = 6 min Hyd. volume = 65,937 cuft = 3.160 ac Curve number = 98 = 0.0 % Hydraulic length = 0 ft = User Time of conc. (Tc) = 11.70 min = 6.37 in Distribution = Custom = S:\Petry Engineering Cad Projects\2024\24-170 Shape factor - Baginski = 484 - Manor - West Orange DA-EX Impervious Q (cfs) Q (cfs) Hyd. No. 2 -- 10 Year 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 Hyd No. 2 6 8 10 12 14 16 18 20 22 24 26 Time (hrs)
13 Precipitation Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Monday, 12 / 30 / 2024 Hyd. No. 2 DA-EX Impervious Storm Frequency Total precip. Storm duration = 10 yrs Time interval = 6 min = 6.3700 in Distribution = Custom = S:\Petry Engineering Cad Projects\2024\24-170 - Baginski - Manor - West Orang Incremental Rainfall Precipitation Precip (in) Precip (in) Hyd. No. 2 : DA-EX Impervious - 10 Year 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 Time (hrs) Custom Design Storm -- S:\Petry Engineering Cad Projects\2024\24-170 - Baginski - Manor - West Orange\Civil\Curre
File revisions (1)
- Sep 29, 2026
78d1b4e6ebbc7,693,322 bytes