155 Passaic Avenue, Suite 350, Fairfield, New Jersey 07004 973-227-7004 963-227-7074 (fax) www.petryengineering.com DRAINAGE STATEMENT FOR CHIT CHAT DINER 410 EAGLE ROCK AVENUE TOWNSHIP OF WEST ORANGE ESSEX COUNTY, NEW JERSEY SUBMITTED TO: WEST ORANGE PLANNING BOARD PREPARED BY: PETRY ENGINEERING, LLC 155 PASSAIC AVENUE FAIRFIELD, NEW JERSEY 07004 973-227-7004 J. Michael Petry J. MICHAEL PETRY, PE NJ PROFESSIONAL ENGINEER # 36662 JANUARY 24, 2025 PROJECT: #24-085

Page 2

2 EXISTING CONDITIONS The property in question is located on Block 109, Lot 1.01 and Block 111, Lot 1.05 per the Township of West Orange Tax Map. The property is further identified as Chit Chat Diner and is located on the southerly side of Eagle Rock Avenue. The property is comprised of two irregularly shaped lots and has an area of approximately 192,631 square feet (4.42 acres). The site generally slopes from east to west with stormwater runoff flowing from the rear south-westerly portion of the property to the front of the property towards Eagle Rock Avenue. The property is developed with a two-story stone building, paver walkway, outdoor seating and paved parking area. The existing impervious coverage of the subject site is 50,932 square feet (1.17 acres). Stormwater currently flows into a subsurface detention basin located at the rear parking area and into a subsurface detention basin located on the easterly parking area. Both systems ultimately flow into the county drainage system along Eagle Rock Avenue. SOILS INVESTIGATION Prior to the stormwater management design, a soils investigation was performed to determine the soil’s permeability as well as to locate potential groundwater and bedrock. Three (3) test pits were performed in the desired parking expansion area and the test results provided a soil permeability rate of 0.2 to 0.6 inch per hour. Additionally, bedrock was observed in all the test pits between 4’- 0” and 5’-6” below the surface. With the bedrock established relatively close to the surface and the clay material above the rock, the existing surfaces act as impervious in the un-built condition. PROPOSED DEVELOPMENT The Applicant is proposing an expansion of the parking area for additional parking spaces to accommodate existing customers and to lessen the reliance on off-site employee parking. The Applicant is proposing a net additional fifteen (15) physical parking spaces, of which four (4) will be EV-ready. With the EV credit applied, the total number of additional spaces proposed in relation to the zoning requirement is nineteen (19) spaces. Surrounding the proposed parking area will be block curb, a metal fence and a timber guide rail that matches the existing. The proposed parking area will include twelve (12) new plantings within the proposed islands and around the parking area to meet West Orange Tree Ordinance. It shall be noted

Page 2

hat matches the existing. The proposed parking area will include twelve (12) new plantings within the proposed islands and around the parking area to meet West Orange Tree Ordinance. It shall be noted that the circulation for the proposed parking area will be one way with the appropriate signage provided. Additionally, the parking area will be illuminated with the proposed fixtures similar to those recently installed as shown on the plans.

Page 3

3 The total amount of disturbance on these lots for all the proposed work is 19,100 square feet (0.438 acres). The proposed improvements consist of 8,244 (0.189 acres) square feet of impervious coverage. Because of the increase in impervious coverage on site, two (2) type ‘B’ inlets will be constructed within the expanded parking area. These inlets will connect to two (2) manholes via 12” HDPE pipes which will tie into the existing type ‘B’ inlet on site. STORMWATER MANAGEMENT Both the limit of disturbance (0.438 acres) and the new motor vehicle surface area (0.189 acres) are below the major development thresholds. No detention is provided since the shallow bedrock and clay material already represent an impervious condition. To account for the additional impervious coverage, the Applicant is proposing to install inlets and manholes to connect into the existing stormwater management system on site. This added pipe network will capture the stormwater runoff within the expanded parking area and direct it towards the existing storm sewer system located within the developed portion of the property. CONCLUSION To summarize, the improvements have been designed to provide additional parking stalls on the subject property. It is especially important to note that the proposed development will not have a negative impact on the neighboring properties as the stormwater runoff from the expansion will be captured by the proposed inlets and manholes and connect into the existing system in the parking lot. As such, there will be slight reduction in runoff that currently discharges to the steep slopes.

Page 4

PREPARED FOR CHIT CHAT DINER 410 EAGLE ROCK AVENUE LOT 1.01, BLOCK 109 LOT 1.05, BLOCK 111 TOWNSHIP OF WEST ORANGE ESSEX COUNTY, NEW JERSEY SHEET: TITLE: REV DESCRIPTION DATE INLET DRAINAGE AREA MAP PROJECT #: FIG-124-085 DRAFTED BY: LCD CHECKED BY: SPD ENGINEERING , LLC NEW JERSEYFAIRFIELD155 PASSAIC AVENUE DIVISION OF CONSUMER AFFAIRS LICENSE NUMBER 24GA28155900 ENGINEERING , LLC FAX (973) 227-7074TEL. (973) 227-7004 PETRYENGINEERING.COM 07004

Page 5

STORM SEWER COMPUTATIONS RATIONAL METHOD - (Q=CIA) Date: 01-24-25, Revised: 25 YR. STORM Inlet #1-3 MH #1-2 0.11 0.99 0.10 0.10 6.0 5.60 0.59 50 1% 12" HDPE 3.87 4.93 0.17 GOOD MH #1-2 MH #1-1 0 0.99 0.00 0.10 6.0 5.60 0.59 34 1% 12" HDPE 3.87 4.93 0.11 GOOD Inlet #1-4 MH #1-1 0.051 0.99 0.05 0.16 6.0 5.60 0.87 55 1% 12" HDPE 3.87 4.93 0.19 GOOD MH #1-1 EX. INLET 0 0.99 0.00 0.16 6.0 5.60 0.87 25 1% 12" HDPE 3.87 4.93 0.08 GOOD Pipe Travel Time(min) I-Rainfall Int. (in./hr) By: LCD PIPE SEGMENT FROM TO A-Incremental C-Runoff Coef. AxC-Incremental AxC Cumulative Tc (MIN.) Velocity (Design) (fps) Qp-Peak Runoff (cfs) Pipe/Box Length (FT.) Slope (%) Pipe/Box Size (IN.) Capacity (FULL) (cfs)

Page 6

TP-3 TP-2 TP-1 PREPARED FOR CHIT CHAT DINER 410 EAGLE ROCK AVENUE LOT 1.01, BLOCK 109 LOT 1.05, BLOCK 111 TOWNSHIP OF WEST ORANGE ESSEX COUNTY, NEW JERSEY SHEET: TITLE: REV DESCRIPTION DATE TEST PIT LOCATIONS AND SOIL PERMEABILITY MAP PROJECT #: FIG-224-085 DRAFTED BY: LCD CHECKED BY: SPD ENGINEERING , LLC NEW JERSEYFAIRFIELD155 PASSAIC AVENUE DIVISION OF CONSUMER AFFAIRS LICENSE NUMBER 24GA28155900 ENGINEERING , LLC FAX (973) 227-7074TEL. (973) 227-7004 PETRYENGINEERING.COM 07004