Supporting Documentation · Jan 7, 2026
01 WO PB Application Form 32265751
c8e559c783364133ab05689ad8b7acdf8b0aebcf92b3ac980e45e0f11e26e1caIndexed text
160 Federal Street, Floor 12 25 Main Street, Suite 200, Hackensack, NJ 07601 201 342-6137 LBDiener@optimum.net B-2 See attached Previous Planning Board and Zoning Board of Adjustment Decisions
X X Tree Removal 25-8.4(d) See also attached List of Variances, Design Exceptions and Submission Waivers Non-residential screening wall may not exceed 6' 8' screen wall 25-14.3 0.6 footcandles 2.0 footcandles required for illumination in parking areas (B-2 zone) 25-15.4.l 8'-7" Canopy projection (with sign) 25-15.4.l 1'-6" Canopy sign height Property is currently improved with a multi-tenant retail shopping center consisting of two buildings with approx. 32,556 sf (combined). Applicant proposes to fit-out and occupy approx. 17,245 sf (1st floor)+ 1,522 sf (Mezzanine) of existing tenant space into a Trader Joe's retail grocery store. See attached Proposal for further details. 161,597 3.71 83.8% 82.1% 24.7% 19.1%
Gibbons P.C. (Howard D. Geneslaw, Esq.) 973 596-4647 hgeneslaw@gibbonslaw.com One Gateway Center, Newark NJ 07102 Bohler Engineering (Tung-To Lam, P.E.) tlam@bohlereng.com 30 Independence Blvd., Suite 200, Warren, NJ 07059 Taylor Associates- Architects (Jeffrey Taylor, AIA) jt@taylorarchitects.com 914 572 N. Broadway, White Plains, NY 10603 Traffic Planning & Design, Inc. ("TPD") (Paul B. Going, P.E. / David W. Fahim, P.E.) 908 769-5588 30 Independence Boulevard, Suite 110, Warren, NJ 07059 pgoing@TPDinc.com
See attached Proposal See attached List of Variances and Reasons for Relief See attached List of Variances and Reasons for Relief See attached List of Variances and Reasons for Relief N/A See attached List of Variances and Reasons for Relief See attached List of Plans & Exhibits. Acknowledged
SIGNATURE IS REQUIRED FOR ALL OF THE FOLLOWING: APPLICANT’S VERIFICATION I hereby certify that the above statements made by me and the information contained in the papers submitted in connection with this application are true. I am aware that if any of the foregoing statements are willfully false, 1 am subject to punishment. Trader Joe's East, Inc. A Vobcae ___Date: July _31__, 2025 Applicant's Signature: _ Andy Tobias, Director of Construction CONTINUANCE Should the Planning Board/Zoning Board of Adjustment have a full and heavy agenda, or discussion and meeting regarding this application requiring carrying the matter past the statue time limit, the applicant grants permission for such an extension. Trader Joe's East, Inc. A Ta hieg Date; July 31_, 2028 Applicant's Signature: _ 7 Andy TobidS, Director of Construction OWNER’S AUTHORIZATION ~ MUST BE SIGNED Thereby certify that | maintain a principal office at 25 Main Street, Suite 200 in Hackensack inthe County of Bergen and the State of NewJersey eee and that I am the owner of all that certain lot, piece or parcel of land known as Block(s) 157, Los) 5 _ on the Tax Map of _87 _ __which property is the subject of the above application, and that said application is hereby authorized by me. Furthermore, | authorize inspection of the site which is the subject of this application. : rom Mt ree amis Ltd. LA ro Owner's Signature: WY ~ __. Date: July _34__, 2025 Printed rik ee weet “Orr? Title: LY, THIS APPLICATION DOES NOT RELIEVE THE APPLICANT FROM COMPLYING WITH OTHER TOWNSHIP ORDINANCES SUCH AS THE TREE REMOVAL ORDINANCE AND OBTAINING THE NECESSARY APPROVALS AND PERMITS UNDER SUCH ORDINANCES. TAPLANMING.BRDDuctument Library\PHeZIA Application 420-L Sdn
File revisions (1)
- Sep 29, 2026
c8e559c783361,417,041 bytes