as been provided. 10. The Applicant must provide the routing analysis of the revised stormwater management design to verify compliance with the applicable stormwater runoff quantity standards. 11. The drainage areas in Post-Developed Watershed Map must be revised to reflect the stormwater management design changes. 12. The Stormwater Management Measures Maintenance Plan and Field Manuals must be revised to reflect the stormwater management design changes.

Page 7

Chairman and Members of the West Orange Township Zoning Board December 12, 2025 Re: PSE&G Company (ZB-24-06) Our File No. 115.WRZ0155.V04 Preliminary & Final Site Plan with ‘C’ and ‘D’ Page 7 Variances and Tree Removal Permit - Review #3 H:\Legacy\Howell-FS1\SEC\West Orange\Zoning Board\115.WRZ0155.V04 - PSE&G Company\2025-12-12 - Review #3.docx 13. The List of Stormwater Management Measures in Stormwater Management Measures Maintenance Plan and Field Manuals must be revised to include the state plane coordinates for each basin. 14. The source of the Infiltration Testing listed within the table on page 8 of the Stormwater Management Measures Maintenance Plan and Field Manuals must be shown. 15. The Stormwater Management Measures Maintenance Plan and Field Manuals should be revised to include the name, address, and telephone number of the person or persons responsible for maintenance of the system. 16. The Stormwater Management Measures Maintenance Plan and Field Manuals for Stormwater Management Facilities and any future revisions to the plan must be recorded upon the deed of record for each property on which the maintenance described in the plan must be undertaken. Prior to recording, the form of the deed must be approved by the Zoning Board Attorney and our office. 17. Revise the Stormwater Management Measures Maintenance Plan and Field Manuals to include the preventive maintenance actions and the corrective maintenance actions for the existing AquaShield. D. LIGHTING COMMENTS 1. Revise the plans to clarify the proposed timers and hours of operation for all light fixtures. Currently, proposed ‘down lights’ are indicated to be on “at night” or when activated. 2. The Applicant should provide testimony regarding the necessity of uplighting. In accordance with Section 25-14.2, lighting is to be directed downwards, as up lights are not dark sky compliant. 3. Provide manufacturer’s catalog cuts for all proposed light fixtures, for further review. Also, include proposed color and finish. The Applicant is hereby advised that any revised plans or other documents submitted to the Board should be accompanied by a cover letter which addresses each of the comments in this review letter and also details any other changes that have been made to the plans as these may not be readily apparent.

File revisions (1)