2025 10 27 Drainage Statement Rev 1

Preserved file SHA-2568d4b255846f012285be5aec51796ac932dc55498b218e135d5c8dd1a27a1a606

Indexed text

Page 1

DRAINAGE STATEMENT FOR CHIT CHAT DINER 410 EAGLE ROCK AVENUE TOWNSHIP OF WEST ORANGE ESSEX COUNTY, NEW JERSEY SUBMITTED TO: WEST ORANGE PLANNING BOARD PREPARED BY: PETRY ENGINEERING, LLC 155 PASSAIC AVENUE FAIRFIELD, NEW JERSEY 07004 973-227-7004 J. Michael Petry J. MICHAEL PETRY, PE NJ PROFESSIONAL ENGINEER # 36662 JANUARY 24, 2025 REVISED: OCTOBER 27, 2025 PROJECT: #24-085 155 Passaic Avenue, Suite 350, Fairfield, New Jersey 07004 973-227-7004 963-227-7074 (fax) www.petryengineering.com

Page 2

EXISTING CONDITIONS The property in question is located on Block 109, Lot 1.01 and Block 111, Lot 1.05 per the Township of West Orange Tax Map. The property is further identified as Chit Chat Diner and is located on the southerly side of Eagle Rock Avenue. The property is comprised of two irregularly shaped lots and has an area of approximately 192,631 square feet (4.42 acres). The site generally slopes from east to west with stormwater runoff flowing from the rear south-westerly portion of the property to the front of the property towards Eagle Rock Avenue. The property is developed with a two-story stone building, paver walkway, outdoor seating and paved parking area. The existing impervious coverage of the subject site is approximately 50,932 square feet (1.17 acres). Stormwater currently flows into a subsurface detention basin located at the rear parking area and into a subsurface detention basin located on the easterly parking area. Both systems ultimately flow into the county drainage system along Eagle Rock Avenue. SOILS INVESTIGATION Prior to the stormwater management design, a soils investigation was performed to determine the soil’s permeability as well as to locate potential groundwater and bedrock. Three (3) test pits were performed in the desired parking expansion area, and the test results provided a soil permeability rate of 0.2 to 0.6 inch per hour. Additionally, bedrock was observed in all the test pits between 4’0” and 5’-6” below the surface. With the bedrock established relatively close to the surface and the clay material above the rock, the existing surfaces act as impervious in the un-built condition. PROPOSED DEVELOPMENT The Applicant is proposing an expansion of the parking area for additional parking spaces to accommodate existing customers and to lessen the reliance on off-site employee parking. The Applicant is proposing a net additional fifteen (15) physical parking spaces, of which four (4) will be EV-ready. With the EV credit applied, the total number of additional spaces proposed in relation to the zoning requirement is nineteen (19) spaces. Surrounding the proposed parking area will be block curb, a metal fence and a timber guide rail that matches the existing. The proposed parking area will include twelve (12) new plantings within the proposed islands and around the parking area to meet West Orange Tree Ordinance. It

Page 2

er guide rail that matches the existing. The proposed parking area will include twelve (12) new plantings within the proposed islands and around the parking area to meet West Orange Tree Ordinance. It should be noted that the circulation for the proposed parking area will be one way with the appropriate signage provided. Additionally, the parking area will be illuminated with the proposed fixtures similar to those recently installed as shown on the plans. 2

Page 3

The total amount of disturbance on these lots for all the proposed work is 19,200 square feet (0.441 acres). The proposed improvements consist of 8,313 square feet (0.191 acres) of impervious coverage of which 7,878 square feet (0.181 acres) of improvements are motor vehicle surface. Because of the increase in impervious coverage on site, two (2) type ‘B’ inlets will be constructed within the expanded parking area. These inlets will connect to two (2) manholes via 12” HDPE pipes which will tie into the existing type ‘B’ inlet on site. STORMWATER MANAGEMENT Both the limit of disturbance (0.441 acres) and the new motor vehicle surface area (0.181 acres) are below the major development thresholds. No detention is provided since the shallow bedrock and clay material already represent an impervious condition. To account for the additional impervious coverage, the Applicant is proposing to install inlets and manholes to connect into the existing stormwater management system on site. This added pipe network will capture the stormwater runoff within the expanded parking area and direct it towards the existing storm sewer system located within the developed portion of the property. CONCLUSION To summarize, the improvements have been designed to provide additional parking stalls on the subject property. It is especially important to note that the proposed development will not have a negative impact on the neighboring properties as the stormwater runoff from the expansion will be captured by the proposed inlets and manholes and connect into the existing system in the parking lot. As such, there will be slight reduction in runoff that currently discharges to the steep slopes. 3

Page 4

DIVISION OF CONSUMER AFFAIRS LICENSE NUMBER 24GA28155900 155 PASSAIC AVENUE FAIRFIELD NEW JERSEY 07004 TEL. (973) 227-7004 FAX (973) 227-7074 PETRYENGINEERING.COM ENGINEERING , LLC REV DESCRIPTION DATE CHECKED BY: SPD DRAFTED BY: LCD ENGINEERING , LLC PREPARED FOR CHIT CHAT DINER 410 EAGLE ROCK AVENUE LOT 1.01, BLOCK 109 LOT 1.05, BLOCK 111 TOWNSHIP OF WEST ORANGE ESSEX COUNTY, NEW JERSEY TITLE: INLET DRAINAGE AREA MAP PROJECT #: 24-085 SHEET: FIG-1

Page 5

STORM SEWER COMPUTATIONS RATIONAL METHOD - (Q=CIA) 25 YR. STORM Date: 01-24-25, Revised: By: LCD AxC-Incremental AxC Cumulative Tc (MIN.) I-Rainfall Int. (in./hr) Qp-Peak Runoff (cfs) Pipe/Box Length (FT.) Slope (%) Pipe/Box Size (IN.) Capacity (FULL) (cfs) Velocity (Design) (fps) Pipe Travel Time(min) MH #1-2 MH #1-1 MH #1-1 EX. INLET C-Runoff Coef. TO Inlet #1-3 MH #1-2 Inlet #1-4 MH #1-1 A-Incremental FROM PIPE SEGMENT 0.11 0 0.051 0 0.99 0.99 0.99 0.99 0.10 0.00 0.05 0.00 0.10 0.10 0.16 0.16 6.0 6.0 6.0 6.0 5.60 5.60 5.60 5.60 0.59 0.59 0.87 0.87 50 34 55 25 1% 1% 1% 1% 12" HDPE 12" HDPE 12" HDPE 12" HDPE 3.87 3.87 3.87 3.87 4.93 4.93 4.93 4.93 0.17 0.11 0.19 0.08 GOOD GOOD GOOD GOOD

Page 6

DIVISION OF CONSUMER AFFAIRS LICENSE NUMBER 24GA28155900 155 PASSAIC AVENUE FAIRFIELD NEW JERSEY 07004 TEL. (973) 227-7004 FAX (973) 227-7074 PETRYENGINEERING.COM ENGINEERING , LLC TP-2 TP-3 REV DESCRIPTION DATE TP-1 CHECKED BY: SPD DRAFTED BY: LCD ENGINEERING , LLC PREPARED FOR CHIT CHAT DINER 410 EAGLE ROCK AVENUE LOT 1.01, BLOCK 109 LOT 1.05, BLOCK 111 TOWNSHIP OF WEST ORANGE ESSEX COUNTY, NEW JERSEY TITLE: TEST PIT LOCATIONS AND SOIL PERMEABILITY MAP PROJECT #: 24-085 SHEET: FIG-2

Page 7

66 Glen Avenue Glen Rock, NJ 07452 Telephone: 201-301-1045 Fax: 201-857-8002 Email: info@johnsonsoils.com JOHNSON Solis OMPANY. January 13, 2025 PETRY ENGINEERING, LLC 155 Passaic Avenue, Suite 350 Fairfield, NJ 07004 Re: 410 Eagle Rock Ave. West Orange, NJ JSC Job #25-026 Dear Sir: Following are the test results for the sample received on January 8, 2025. The hydrometer analysis was done accordingly to ASTM-D-422 as per N.J.A.C. 7:9A-6.3 (a). Sample | % Sand % Silt % Clay Pe fad Mae He Bae (% of BO oe cies! TP-1 54 32 14 52 34 K-1** TP-2 50 34 16 58 50 K-1** TP-3 55 31 14 55 48 K-1#* SOIL PERMEABILITY RATING IS FROM THE SOIL PERMEABILITY/TEXTURAL TRIANGLE. Based on the average textural analysis, the soil permeability rating for ‘TP-1 is K-1** (0.2-0.6 in/hr.) ‘TP-2 is K-1** (0.2-0.6 in/hr.) TP-3 is K-1** (0.2-0.6 in/hr.) hd Please note the permeability rating has been adjusted to the next slowest class due to the high percentage of fine and very fine SAND as per Chapter 9A Standards for Individual Subsurface Sewage Disposal Systems 7:9A-6.3 (h)2. Very truly yours, JOHNSON SOILS COMP. Lisa V. Mahle-Greco, PE. CA Engineering Manager NJ Lic. No. 43197 * Subsurface Investigation * Geotechnical Engineering * Construction Testing «

Page 8

DNA :Ag peyoeyd Cd :Ag pejseL PN ‘Yooy uals “SAV YOY IS"q Or podey uoNqu}siq eZIg eed ANVdINOO STIOS NOSNHOrF @anBi3 OTI Bunscursug Aneg wed 970-SZ “ON 8lO1d Garr 90-C'0) TA SPAT SPDOUTBELT SS1VOD % VE pues oul AIA pue SULT % CS ABD % VI WES Ye TE PUPS % HF wv T Tal lo woRduaseg |!og “nearpdeg | #aidweg @04n0g UOREDOT ce) | Ws ~ uly [ ‘uunIpeyy [981209 ‘uly | esle0g o+% SOULS % pues % PARI % “ “Mw SZis NivVeS 400°0 10-0 Lo L OL OOL 0 OL fe. NI ne 4 NI oe ~ NS o 3 N 6 N mM ~ Cl os s a Zz NS o = OL SN N 08 06 ime Hitt | L | | i 1 ia It | L ool O0CH OOO Oar OF uge an uae ug USBLSWONGAH 7 ‘SUSSWNN SARIS GHVGNYLS ‘S'N. SSHONI NI ONINSdO SAIS ‘S'n

Page 9

SWAT :Ag pexoey dd :Ag peso, PN ‘Y90u Ua[D “IAW YOOY SET OTP yodey uoANquysiq ezIg ajomed ANVdINOSD STlIOS NOSNHOr eanBiy OT] ‘sunsoursuq Anog weld 9Z0-SZ “ON }98!01g Cat 9°0-7'0) xe I-A MPA STUSULSeI] OSIBOD % OS pues oury AISA pur oulyT% Bo ARTO % OT HWS % VE “PUS % OF u9S T Cdl lO} uopdyosed 10S ~nelanndeg | #eidures 3ainog wOREDOT Reid I ws Ould 1 ‘WunIpeyy | @SI20D, ‘uly | ‘@SILOD e+ % SOUL % PUES % PAEID % anes “WU = 3ZIS NIVED L00°0 Loo Fo L OL OL ° OL ™ ro I 0% EN oe \ ov e B ANI LNSOYAd 09 a oo a oe N N 06 NS Mi td hh ime ! by wd Hit oo1 Oplit use” “Uy a UHL rere "8 MSLSINOUGAH SUFEWAN SARIS GUVANVIS ‘s'n ‘S3HONI NI ONINAdO SAIS “S'N

File revisions (1)