THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATION FROM BOHLER. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES © BOHLER SITE CIVIL AND CONSULTING ENGINEERING LAND SURVEYING PROGRAM MANAGEMENT LANDSCAPE ARCHITECTURE SUSTAINABLE DESIGN PERMITTING SERVICES TRANSPORTATION SERVICES TM PRELIMINARY & FINAL MAJOR SITE PLAN FOR REVISIONS PROPOSED RETAIL STORE REV DATE 1 09/17/2025 2 COMMENT DRAWN BY CHECKED BY REV. PER SCD COMMENTS. REV. PER TOWNSHIP 12/10/2025 COMMENTS TGH TXL AWS TXL 457 MOUNT PLEASANT AVENUE TOWNSHIP OF WEST ORANGE USGS MAP ESSEX COUNTY, NEW JERSEY SCALE: 1" = 1,000' SOURCE: USGS MAP LOCATOR CALDWELL QUADRANGLE (2023) Know what's below. GOVERNING AGENCIES REFERENCES ¨ALTA/NSPS LAND TITLE SURVEY: Callbefore you dig. ¨PLANNING & DEVELOPMENT CONTROL POINT ASSOCIATES, INC. 30 INDEPENDENCE BLVD., SUITE 100 WARREN, NJ 07059 DATED: 08/05/2025 (REV. 2) JOB #/SURVEY JOB #: 01-230064-00 ELEVATIONS: NAVD 1988 66 MAIN STREET WEST ORANGE, NJ 07052 PHONE: (973) 325-4110 FAX: (973) 325-6359 NEW JERSEY YOU MUST CALL 811 BEFORE ANY EXCAVATION WHETHER IT'S ON PRIVATE OR PUBLIC LAND. 1-800-272-1000 www.nj1-call.org SHEET INDEX N RA NT A VE N RA BLOCK 171.04 Y WA VA NT BLOCK 155.05 D LEA S BLOCK 155.03 BLOCK 155.04 BLOCK 155.02 ANT AVE ZONE R-2 CE RR A TE L OO KP E AC RR BLOCK 155.06 MT P ER R ST E SH IRE HE BLOCK 155.08 ET SA PL EA BLOCK 157 ZONE B-2 BLOCK 155.20 ON BLOCK 155.10 L HW R DD NC BLOCK 155.07 ZONE R-2 ZONE BLOCK 171.03 R-4 MA TP ' BLOCK 155.09 RD DE V BLOCK 172.16 PLE BLOCK 155.11 ASA N 200 BLOCK 172.03 BLOCK 155.14 HA M ES HIR TE BLOCK 172.14 BLOCK 172.02 ING BLOCK 155.12 BLOCK 155 BLOCK 155.13 CH ELT ROO SEV MT CK ZONE R-5 BR CE RR A ZONE B-2 ER BLOCK 155.02 BLOCK 172.04 LORELEI RD BLOCK 155.01 BU RIV RIV BLOCK 155.03 BLOCK 155.04 EAS A AY ER R RD ZONE OB-1 AY BLOCK 155.06 MT P L ER AC E BLOCK 157 BLOCK 155.05 SH IRE TE R ET ES BLOCK 155.08 ON BLOCK 155.10 LL EY AVE WA SAN NC H BLOCK 172.12 ZONE R-5 BLOCK 172.15 ZONE R-5 BLOCK 172.13 SHELLEY TERRACE BLOCK 172.07 SHEET TITLE RA R DD MA BLOCK 175.32 BLOCK 155.20 HW ZONE
ON BLOCK 155.10 LL EY AVE WA SAN NC H BLOCK 172.12 ZONE R-5 BLOCK 172.15 ZONE R-5 BLOCK 172.13 SHELLEY TERRACE BLOCK 172.07 SHEET TITLE RA R DD MA BLOCK 175.32 BLOCK 155.20 HW ZONE BLOCK 171.03 R-4 RD BLOCK 155.09 BLOCK 155.07 ZONE B-2 BLOCK 172.18 M NA AVE NA AVE BLOCK 172.16 ' BLOCK 172.05 RA WITHIN 200' RADIUS BLOCK 155.11 TP L 200 BLOCK 172.03 HA BLOCK 155.12 LEA BLOCK 172.02 BLOCK 172.10 BLOCK 172.06 CAROLI BLOCK 172.14 LL EY MT P BLOCK 155 BLOCK 155.13 ING ZONE R-5 BLOCK 155.14 ZONE B-2 LORELEI RD CAROLI PROPERTY OWNERS LIST ZONE R-5 BLOCK 172.15 BLOCK 172.07 CK DE V SHELLEY TERRACE THE ABOVE REFERENCED DOCUMENTS ARE INCORPORATED BY REFERENCE AS PART OF THESE PLANS, HOWEVER, BOHLER DOES NOT CERTIFY THE ACCURACY OF THE WORK REFERENCED OR DERIVED FROM THESE DOCUMENTS, BY OTHERS. BU ES HIR BLOCK 172.04 BLOCK 172.08 BLOCK 172.22 NT BLOCK 172.12 CH BLOCK 172.18 BLOCK 172.11 ZONE OB-1 L BLOCK 172.05 BLOCK 172.13 PL EA BLOCK 172.06 BLOCK 172.09 VA BLOCK 172.22 ¨OPERATIONS AND MAINTENANCE MANUAL: BOHLER 30 INDEPENDENCE BLVD., SUITE 200 WARREN, NJ 07059 DATED: 08/2025 BLOCK 172.10 SEV BOHLER 30 INDEPENDENCE BLVD., SUITE 200 WARREN, NJ 07059 DATED: 08/2025 (REVISED 12/2025) BLOCK 172.08 ROO ¨STORMWATER MANAGEMENT REPORT: 415 VALLEY ROAD WEST ORANGE, NJ 07052 PHONE: (973) 325-4175 FAX: (973) 669-1080 ELT ¨FIRE DEPARTMENT ZONE R-5 OO KP BLOCK 172.11 BLOCK 175.32 BR BLOCK 172.09 AVE JEFFREY TAYLOR ARCHITECTS 572 NORTH BROADWAY WHITE PLAINS, NY 10603 DATED: 06/16/25 (REVISED 11/24/2025) SA 66 MAIN STREET WEST ORANGE, NJ 07052 PHONE: (973) 325-4112 FAX: (973) 325-3959 Y ¨BUILDING DEPARTMENT ¨ARCHITECTURAL PLAN: BLOCK 155.01 SHEET NUMBER COVER SHEET C-101 GENERAL NOTES C-102 GENERAL LEGEND C-103 EXISTING CONDITIONS/DEMOLITION PLAN C-201 SITE PLAN C-301 TRUCK TURNING PLAN WB-67 (TITLE 39) C-302 TRUCK TURNING PLAN SU-30 (GARBAGE) C-303 GRADING PLAN C-401 DRAINAGE PLAN C-402 UTILITY PLAN C-501 SOIL EROSION AND SEDIMENT CONTROL PLAN C-801 SOIL EROSION & SEDIMENT CONTROL PLAN NOTES & DETAILS C-802 SOIL EROSION & SEDIMENT CONTROL PLAN NOTES & DETAILS C-803 DETAIL SHEET 'A' C-901 DETAIL SHEET 'B' C-902 TREE REMOVAL PLAN L-101 LANDSCAPE PLAN L-201 LANDSCAPE NOTES AND DETAILS L-202 LIGHTING PLAN L-301 LIGHTING SPECIFICATIONS AND
DETAILS C-803 DETAIL SHEET 'A' C-901 DETAIL SHEET 'B' C-902 TREE REMOVAL PLAN L-101 LANDSCAPE PLAN L-201 LANDSCAPE NOTES AND DETAILS L-202 LIGHTING PLAN L-301 LIGHTING SPECIFICATIONS AND DETAILS L-302 ALTA/NSPS LAND TITLE SURVEY (BY CONTROL POINT ASSOCIATES) 1 OF 1 ISSUED FOR MUNICIPAL & AGENCY REVIEW & APPROVAL THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: NJA230139.00-2A CRA / TGH TXL 08/14/2025 P-CIVL-CNDS PROJECT: PRELIMINARY & FINAL MAJOR SITE PLAN FOR PROPOSED RETAIL STORE MAP: 87 | BLK: 157 | LOT: 5 457 MOUNT PLEASANT AVENUE TOWNSHIP OF WEST ORANGE ESSEX COUNTY, NEW JERSEY BLOCK 171.04 TM BOHLER ENGINEERING NJ, LLC 30 INDEPENDENCE BLVD., SUITE 200 WARREN, NJ 07059 Phone: Fax: TAX MAP AERIAL MAP SCALE: 1" = 500' SOURCE: GIS ESSEX COUNTY PARCEL DATA MAP SCALE: 1" = 500' SOURCE: NEARMAP (2025) (908) 668-8300 (908) 754-4401 www.BohlerEngineering.com APPROVAL BLOCK NJ CERT. OF AUTHORIZATION NO. 24GA28400600 & MH000122 TOWNSHIP PLANNING BOARD APPROVAL APPROVED BY THE PLANNING BOARD OF THE TOWNSHIP OF WEST ORANGE, NEW JERSEY. CHAIRMAN DATE SECRETARY DATE MUNICIPAL ENGINEER DATE T. LAM PROFESSIONAL ENGINEER ALSO TO BE NOTIFIED: PREPARED BY NEW JERSEY LICENSE No. 47863 NEW YORK LICENSE No. 092942 CONNECTICUT LICENSE No. 30024 PENNSYLVANIA LICENSE No. 76746 SHEET TITLE: COVER SHEET SHEET NUMBER: GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES. AS G:\2023\NJA230139.00\CAD\DRAWINGS\PLAN SETS\CIVIL SITE PLANS\P-CIVL-CNDS-NJA230139.00-2A----->LAYOUT: C-101 COVR SCALE: 1" = 1,000' SOURCE: GOOGLE MAPS MAP: 87 | BLK: 157 | LOT: 5 REFERENCES Dec 15, 2025 KEY
30139.00\CAD\DRAWINGS\PLAN SETS\CIVIL SITE PLANS\P-CIVL-CNDS-NJA230139.00-2A----->LAYOUT: C-101 COVR SCALE: 1" = 1,000' SOURCE: GOOGLE MAPS MAP: 87 | BLK: 157 | LOT: 5 REFERENCES Dec 15, 2025 KEY MAP C-101 REVISION 2 - 12/10/2025
1. 2. 3. 4. 5. 6. 7. 8. (Rev. 1/2020) THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN, AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. PRIOR TO THE COMMENCEMENT OF GENERAL CONSTRUCTION, THE CONTRACTOR MUST INSTALL SOIL EROSION CONTROL AND ANY STORMWATER POLLUTION PREVENTION PLAN (SWPPP) MEASURES NECESSARY, AS INDICATED ON THE APPROVED SOIL EROSION AND SEDIMENT CONTROL PLAN AND IN ACCORDANCE WITH APPLICABLE AND/OR APPROPRIATE AGENCIES' GUIDELINES TO PREVENT SEDIMENT AND/OR LOOSE DEBRIS FROM WASHING ONTO ADJACENT PROPERTIES OR THE RIGHT OF WAY. ALL DIRECTIONAL/TRAFFIC SIGNING AND PAVEMENT STRIPING MUST CONFORM TO THE LATEST STANDARDS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND ANY APPLICABLE STATE OR LOCALLY APPROVED SUPPLEMENTS, GUIDELINES, RULES, REGULATIONS, STANDARDS AND THE LIKE. THE LOCATIONS OF PROPOSED UTILITY POLES AND TRAFFIC SIGNS SHOWN ON THE PLANS ARE SCHEMATIC AND PRELIMINARY. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR FIELD-VERIFYING THEIR LOCATION. THE CONTRACTOR MUST COORDINATE THE RELOCATION OF TRAFFIC SIGNS WITH THE ENTITY WITH JURISDICTION OVER THE PROJECT. ALL DIMENSIONS SHOWN ARE TO BOTTOM FACE OF CURB, EDGE OF PAVEMENT, OR EDGE OF BUILDING, EXCEPT WHEN DIMENSION IS TO A PROPERTY LINE, STAKE OUT OF LOCATIONS OF INLETS, LIGHT POLES, ETC. MUST BE PERFORMED IN STRICT ACCORDANCE WITH THE DETAILS, UNLESS NOTED CLEARLY OTHERWISE. WHEN APPLICABLE, OWNER/ OPERATOR MUST FILE THE NOI FOR NPDES PERMITS AT APPROPRIATE AND/OR REQUIRED TIMEFRAMES BASED UPON THE DESIRED START OF CONSTRUCTION. LAND DISTURBING ACTIVITIES MUST NOT COMMENCE UNTIL APPROVAL TO DO SO HAS BEEN RECEIVED FROM GOVERNING AUTHORITIES (INCLUDING STORMWATER POLLUTION PREVENTION PLAN, PER NJDEP REQUIREMENTS). THE CONTRACTOR MUST STRICTLY ADHERE TO THE APPROVED SWPPP PLAN DURING CONSTRUCTION OPERATIONS (IF PROVIDED). ALL WEATHERED CONCRETE MUST BE AIR ENTRAINED AND INCLUDE THE MINIMUM COMPRESSIVE STRENGTH OF 4,500 PSI AT 28 DAYS UNLESS OTHERWISE NOTED ON THE PLANS, DETAILS AND/OR GEOTECHNICAL REPORT. THE CONTRACTOR MUST REPAIR OR REPLACE, AT THE CONTRACTOR'S SOLE COST AND EXPENSE, ALL
PRESSIVE STRENGTH OF 4,500 PSI AT 28 DAYS UNLESS OTHERWISE NOTED ON THE PLANS, DETAILS AND/OR GEOTECHNICAL REPORT. THE CONTRACTOR MUST REPAIR OR REPLACE, AT THE CONTRACTOR'S SOLE COST AND EXPENSE, ALL SIDEWALKS, CURBS, AND PAVEMENT DAMAGED BY CONSTRUCTION ACTIVITIES WHETHER SPECIFIED ON THIS PLAN OR NOT. PARTIAL SITE PLAN NOTE (Rev. 1/2025) THE SITE DESIGN INFORMATION INCLUDING, BUT NOT LIMITED TO, DRAWINGS, NOTATIONS AND/OR CALCULATIONS WHICH THE ENGINEER OF RECORD AND BOHLER, LLC (HEREIN "BOHLER") ARE PROVIDING WITHIN THIS PLAN IS STRICTLY LIMITED TO THE AREA OF THE SITE WHICH IS DESCRIBED AS THE "SUBJECT AREA OF THIS PLAN". ANY INFORMATION WHICH IS INCLUDED ON THIS PLAN, BUT IS NOT INCLUDED IN THE AREA DESCRIBED AS THE "SUBJECT AREA OF THIS PLAN" CONSTITUTE GRAPHICAL REPRESENTATIONS OF EXISTING CONDITIONS ONLY, TAKEN FROM THE REFERENCED DOCUMENTS AND INFORMATION. THIS INFORMATION IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. "GRAPHICAL REPRESENTATIONS OF THE EXISTING CONDITIONS" ARE NOT PART OF ENGINEER OF RECORD AND BOHLER WORK AND ARE NOT PART OF THE SITE DESIGN. THE ENGINEER OF RECORD AND BOHLER, CONSEQUENTLY, ARE NOT RESPONSIBLE FOR THE ACCURACY OF THE GRAPHICAL REPRESENTATIONS. DEMOLITION NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. (Rev. 1/2023) THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN, AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. THE CONTRACTOR MUST CONDUCT DEMOLITION/REMOVALS ACTIVITIES IN SUCH A MANNER AS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, SIDEWALKS, WALKWAYS, AND ALL OTHER ADJACENT FACILITIES. THE CONTRACTOR MUST OBTAIN ALL APPLICABLE PERMITS FROM THE APPROPRIATE GOVERNMENTAL AUTHORITY(IES) PRIOR TO THE COMMENCEMENT OF ANY ROAD OPENING OR DEMOLITION ACTIVITIES IN OR ADJACENT TO THE RIGHT-OF-WAY. WHEN DEMOLITION-RELATED ACTIVITIES IMPACT ROADWAYS AND/OR ROADWAY RIGHT-OF-WAY, THE CONTRACTOR MUST PROVIDE TRAFFIC CONTROL AND GENERALLY ACCEPTED SAFE PRACTICES IN CONFORMANCE WITH THE CURRENT FEDERAL HIGHWAY ADMINISTRATION "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD), AND THE FEDERAL, STATE,
ROVIDE TRAFFIC CONTROL AND GENERALLY ACCEPTED SAFE PRACTICES IN CONFORMANCE WITH THE CURRENT FEDERAL HIGHWAY ADMINISTRATION "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD), AND THE FEDERAL, STATE, AND LOCAL REGULATIONS. THE DEMOLITION (AND/OR REMOVALS) PLAN IS INTENDED TO PROVIDE GENERAL INFORMATION AND TO IDENTIFY ONLY CONDITIONS REGARDING ITEMS TO BE DEMOLISHED, REMOVED, AND/OR TO REMAIN. A. THE CONTRACTOR MUST ALSO REVIEW ALL CONSTRUCTION DOCUMENTS AND INCLUDE WITHIN THE DEMOLITION ACTIVITIES ALL INCIDENTAL WORK NECESSARY FOR THE CONSTRUCTION OF THE NEW SITE IMPROVEMENTS. B. THIS PLAN IS NOT INTENDED TO AND DOES NOT PROVIDE DIRECTION REGARDING THE MEANS, METHODS, SEQUENCING, TECHNIQUES AND PROCEDURES TO BE EMPLOYED TO ACCOMPLISH THE WORK. ALL MEANS, METHODS, SEQUENCING, TECHNIQUES AND PROCEDURES TO BE USED MUST BE IN STRICT ACCORDANCE AND CONFORMANCE WITH ALL STATE, FEDERAL, LOCAL, AND JURISDICTIONAL REQUIREMENTS. THE CONTRACTOR MUST COMPLY WITH ALL OSHA AND OTHER SAFETY PRECAUTIONS NECESSARY TO PROVIDE A SAFE WORK SITE FOR THE CONTRACTOR AND THE PUBLIC. THE CONTRACTOR MUST PROVIDE ALL "METHODS AND MEANS" NECESSARY TO PREVENT MOVEMENT, SETTLEMENT, OR COLLAPSE OF EXISTING STRUCTURES, AND ANY OTHER IMPROVEMENTS THAT ARE REMAINING ON OR OFF SITE. THE CONTRACTOR, AT THE CONTRACTOR'S SOLE COST, MUST REPAIR ALL DAMAGE TO ALL ITEMS AND FEATURES THAT ARE TO REMAIN. CONTRACTOR MUST USE NEW MATERIAL FOR ALL REPAIRS. CONTRACTOR'S REPAIRS MUST INCLUDE THE RESTORATION OF ALL ITEMS AND FEATURES REPAIRED TO THEIR PRE-DEMOLITION CONDITION, OR BETTER. CONTRACTOR MUST PERFORM ALL REPAIRS AT THE CONTRACTOR'S SOLE EXPENSE. THE PROFESSIONAL OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. THE CONTRACTOR MUST PROCEED WITH THE DEMOLITION IN A SYSTEMATIC AND SAFE MANNER, COMPLYING WITH ALL OSHA REQUIREMENTS, TO ENSURE PUBLIC AND CONTRACTOR SAFETY AND SAFETY TO ALL PROPERTY ON THE SITE OR ADJACENT OR NEAR TO THE SAME. THE CONTRACTOR IS RESPONSIBLE FOR JOB SITE SAFETY, WHICH MUST INCLUDE, BUT IS NOT LIMITED TO, THE INSTALLATION AND MAINTENANCE OF BARRIERS, FENCING, OTHER APPROPRIATE AND/OR NECESSARY SAFETY FEATURES AND ITEMS NECESSARY TO PROTECT THE PUBLIC FROM AREAS OF CONSTRUCTION AND CONSTRUCTION ACTIVITIES. THE CONTRACTOR MUST SAFEGUARD THE SITE AS NECESSARY TO PERFORM THE DEMOLITION IN SUCH A MANNER AS TO PREVENT THE ENTRY OF ALL UNAUTHORIZED
UBLIC FROM AREAS OF CONSTRUCTION AND CONSTRUCTION ACTIVITIES. THE CONTRACTOR MUST SAFEGUARD THE SITE AS NECESSARY TO PERFORM THE DEMOLITION IN SUCH A MANNER AS TO PREVENT THE ENTRY OF ALL UNAUTHORIZED PERSONS AT ANY TIME, TO OR NEAR THE DEMOLITION AREA. PRIOR TO THE COMMENCEMENT OF ANY SITE ACTIVITY AND ANY DEMOLITION ACTIVITY, THE CONTRACTOR MUST, IN WRITING, RAISE ANY QUESTIONS CONCERNING THE ACCURACY OR INTENT OF THESE PLANS AND/OR SPECIFICATIONS, ALL CONCERNS OR QUESTIONS REGARDING THE APPLICABLE SAFETY STANDARDS, AND/OR THE SAFETY OF THE CONTRACTOR AND/OR THIRD PARTIES IN PERFORMING THE WORK ON THIS PROJECT. ANY SUCH CONCERNS MUST BE CONVEYED TO THE PROFESSIONAL OF RECORD AND BOHLER, IN WRITING AND MUST ADDRESS ALL ISSUES AND ITEMS RESPONDED TO, BY THE PROFESSIONAL OF RECORD AND BY BOHLER, IN WRITING. ALL DEMOLITION ACTIVITIES MUST BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS AND SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, RULES, REQUIREMENTS, STATUTES, ORDINANCES AND CODES. THE CONTRACTOR MUST BECOME FAMILIAR WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENTS AND IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLITION AND/OR DISCONNECTION AS IDENTIFIED OR REQUIRED FOR THE PROJECT. THE CONTRACTOR MUST PROVIDE THE OWNER WITH WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED, REMOVED AND/OR ABANDONED IN ACCORDANCE WITH THE JURISDICTION AND UTILITY COMPANY REQUIREMENTS AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. PRIOR TO COMMENCING ANY DEMOLITION, THE CONTRACTOR MUST: A. OBTAIN ALL REQUIRED PERMITS AND MAINTAIN THE SAME ON SITE FOR REVIEW BY THE PROFESSIONAL OF RECORD AND ALL PUBLIC AGENCIES WITH JURISDICTION THROUGHOUT THE DURATION OF THE PROJECT, SITE WORK, AND DEMOLITION WORK. B. NOTIFY, AT A MINIMUM, THE MUNICIPAL ENGINEER, DESIGN ENGINEER, AND LOCAL SOIL CONSERVATION JURISDICTION, AT LEAST 72 BUSINESS HOURS PRIOR TO THE COMMENCEMENT OF WORK. C. INSTALL THE REQUIRED SOIL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO SITE DISTURBANCE, AND MAINTAIN SAID CONTROLS UNTIL SITE IS STABILIZED D. IN ACCORDANCE WITH STATE LAW, THE CONTRACTOR MUST CALL THE STATE ONE-CALL DAMAGE PROTECTION SYSTEM FOR UTILITY MARK OUT, IN ADVANCE OF ANY EXCAVATION. E. LOCATE AND PROTECT ALL UTILITIES AND SERVICES, INCLUDING BUT NOT LIMITED TO GAS,
CONTRACTOR MUST CALL THE STATE ONE-CALL DAMAGE PROTECTION SYSTEM FOR UTILITY MARK OUT, IN ADVANCE OF ANY EXCAVATION. E. LOCATE AND PROTECT ALL UTILITIES AND SERVICES, INCLUDING BUT NOT LIMITED TO GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. WITHIN AND ADJACENT TO THE LIMITS OF PROJECT ACTIVITIES. THE CONTRACTOR MUST USE AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL UNDERGROUND UTILITIES. F. PROTECT AND MAINTAIN IN OPERATION, ALL ACTIVE UTILITIES AND SYSTEMS THAT ARE NOT BEING REMOVED DURING ANY DEMOLITION ACTIVITIES. G. ARRANGE FOR AND COORDINATE WITH THE APPLICABLE UTILITY SERVICE PROVIDER(S) FOR THE TEMPORARY OR PERMANENT TERMINATION OF SERVICE REQUIRED BY THE PROJECT PLANS AND SPECIFICATIONS REGARDING THE METHODS AND MEANS TO CONSTRUCT SAME. THESE ARE NOT THE PROFESSIONAL OF RECORD'S OR BOHLER RESPONSIBILITY. IN THE EVENT OF ABANDONMENT, THE CONTRACTOR MUST PROVIDE THE UTILITY ENGINEER AND OWNER WITH IMMEDIATE WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE WITH JURISDICTIONAL AND UTILITY COMPANY REQUIREMENTS. H. ARRANGE FOR AND COORDINATE WITH THE APPLICABLE UTILITY SERVICE PROVIDER(S) REGARDING WORKING "OFF-PEAK" HOURS OR ON WEEKENDS AS NECESSARY OR AS REQUIRED TO MINIMIZE THE IMPACT ON, OF, AND TO THE AFFECTED PARTIES. WORK REQUIRED TO BE PERFORMED "OFF-PEAK" IS TO BE PERFORMED AT NO ADDITIONAL COST TO THE OWNER. I. IN THE EVENT THE CONTRACTOR DISCOVERS ANY HAZARDOUS MATERIAL, THE REMOVAL OF WHICH IS NOT ADDRESSED IN THE PROJECT PLANS AND SPECIFICATIONS OR THE CONTRACT WITH THE OWNER/DEVELOPER, THE CONTRACTOR MUST IMMEDIATELY CEASE ALL WORK IN THE AREA OF DISCOVERY, AND IMMEDIATELY NOTIFY, IN WRITING AND VERBALLY, THE OWNER, PROFESSIONAL OF RECORD AND BOHLER, THE DISCOVERY OF SUCH MATERIALS TO PURSUE PROPER AND COMPLIANT REMOVAL OF SAME. THE CONTRACTOR MUST NOT PERFORM ANY EARTH MOVEMENT ACTIVITIES, DEMOLITION OR REMOVAL OF FOUNDATION WALLS, FOOTINGS, OR OTHER MATERIALS WITHIN THE LIMITS OF DISTURBANCE, UNLESS SAME IS IN STRICT ACCORDANCE AND CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS, OR PURSUANT TO THE WRITTEN DIRECTION OF THE OWNER'S STRUCTURAL OR GEOTECHNICAL ENGINEER. DEMOLITION ACTIVITIES AND EQUIPMENT MUST NOT USE OR INCLUDE AREAS OUTSIDE THE DEFINED PROJECT LIMIT LINE, WITHOUT
PURSUANT TO THE WRITTEN DIRECTION OF THE OWNER'S STRUCTURAL OR GEOTECHNICAL ENGINEER. DEMOLITION ACTIVITIES AND EQUIPMENT MUST NOT USE OR INCLUDE AREAS OUTSIDE THE DEFINED PROJECT LIMIT LINE, WITHOUT SPECIFIC WRITTEN PERMISSION AND AUTHORITY OF AND FROM THE OWNER AND ALL GOVERNMENTAL AGENCIES WITH JURISDICTION. THE CONTRACTOR MUST BACKFILL ALL EXCAVATION RESULTING FROM, OR INCIDENTAL TO, DEMOLITION ACTIVITIES. BACKFILL MUST BE ACCOMPLISHED WITH APPROVED BACKFILL MATERIALS AND MUST BE SUFFICIENTLY COMPACTED TO SUPPORT ALL NEW IMPROVEMENTS AND MUST BE PERFORMED IN COMPLIANCE WITH THE RECOMMENDATIONS AND GUIDANCE ARTICULATED IN THE GEOTECHNICAL REPORT. BACKFILLING MUST OCCUR IMMEDIATELY AFTER DEMOLITION ACTIVITIES AND MUST BE PERFORMED SO AS TO PREVENT WATER ENTERING THE EXCAVATION. FINISHED SURFACES MUST BE GRADED TO PROMOTE POSITIVE DRAINAGE. THE CONTRACTOR IS RESPONSIBLE FOR COMPACTION TESTING AND MUST SUBMIT SUCH REPORTS AND RESULTS TO THE PROFESSIONAL OF RECORD AND THE OWNER. EXPLOSIVES MUST NOT BE USED WITHOUT PRIOR WRITTEN CONSENT FROM BOTH THE OWNER AND ALL APPLICABLE, NECESSARY AND REQUIRED GOVERNMENTAL AUTHORITIES. PRIOR TO COMMENCING ANY EXPLOSIVE PROGRAM AND/OR ANY DEMOLITION ACTIVITIES, THE CONTRACTOR MUST ENSURE AND OVERSEE THE INSTALLATION OF ALL OF THE REQUIRED PERMIT AND EXPLOSIVE CONTROL MEASURES THAT THE FEDERAL, STATE, AND LOCAL GOVERNMENTS REQUIRE. THE CONTRACTOR IS ALSO RESPONSIBLE TO CONDUCT AND PERFORM ALL INSPECTION AND SEISMIC VIBRATION TESTING THAT IS REQUIRED TO MONITOR THE EFFECTS ON ALL LOCAL STRUCTURES AND THE LIKE. IN ACCORDANCE WITH FEDERAL, STATE, AND/OR LOCAL STANDARDS, THE CONTRACTOR MUST USE DUST CONTROL MEASURES TO LIMIT AIRBORNE DUST AND DIRT RISING AND SCATTERING IN THE AIR. AFTER THE DEMOLITION IS COMPLETE, THE CONTRACTOR MUST CLEAN ALL ADJACENT STRUCTURES AND IMPROVEMENTS TO REMOVE ALL DUST AND DEBRIS WHICH THE DEMOLITION OPERATIONS CAUSE. THE CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL ADJACENT AREAS TO THEIR "PRE-DEMOLITION" CONDITION AT CONTRACTOR'S SOLE COST. PAVEMENT MUST BE SAW CUT IN STRAIGHT LINES. ALL DEBRIS FROM REMOVAL OPERATIONS MUST BE REMOVED FROM THE SITE AT THE TIME OF EXCAVATION. STOCKPILING OF DEBRIS OUTSIDE OF APPROVED AREAS WILL NOT BE PERMITTED, INCLUDING BUT NOT LIMITED TO, THE PUBLIC RIGHT-OF-WAY. THE CONTRACTOR MUST MAINTAIN A RECORD SET OF PLANS WHICH INDICATES THE LOCATION OF EXISTING