400 Crossing Boulevard 8th Floor P.O. Box 5933 Bridgewater, NJ 08807 T: 908-722-0700 F: 908-722-0755 Amanda C. Wolfe, Esq. Direct Dial: 908-252-4328 Email: acwolfe@norris-law.com January 30, 2026 Via Fed-Ex and E-Mail (jvite@westorange.org) West Orange Town Hall Planning Board Secretary Jamilet Baquerizo Vite 66 Main Street West Orange, NJ 07052 RE: Application for Preliminary and Final Site Plan Approval 262-270 Main Street Block 114, Lots 50 and 55 Dear Ms. Baquerizo Vite, I represent 262 Main Street Realty LLC and 270 Main Street Realty LLC, the owners of property located at 262-270 Main Street (Block 114, Lots 50 & 55). In response to the December 23, 2025 Incompleteness determination, we are submitting the following supplemental documents: 1. Geotechnical Engineering Investigation Report prepared by Jordan Cecinini, P.E., dated August 19, 2025; 2. Five (5) sets of Revised Site Plans with additional site details including acreage and planting information prepared by Jordan Cecinini, P.E., dated January 30, 2026, same consisting of twelve (12) sheets; 3. Five (5) sets of Revised Architectural plans prepared by Jorge Mastropietro, R.A., dated January 29, 2026, same consisting of sixteen (16) sheets; and 4. Waiver Requests for the following: a. Environmental Impact Study; b. “Run Card”; c. Contours beyond 200 feet beyond property line. BRIDGEWATER, NJ | NEW YORK, NY | ALLENTOWN, PA WWW.NORRISMCLAUGHLIN.COM

Page 2

Norris McLaughlin, P.A. January 30, 2026 Page 2 Hard copies of the documents are being submitted to my office on Monday and I will forward them to the municipality upon receipt. Please let me know if there is any additional information required. Thank you! Very truly yours, Amanda C. Wolfe Amanda C. Wolfe ACW/acw cc: Malvika Apte (by email only) Joseph Siad (by email only) Jorge Mastropietro (by email only) Carlos Chacon (by email only) Kate Keller (by email only) Gary Dean (by email only) Xavier Ramon (by email only) Geniece Gary-Adams (by email only)

Page 3

Hudson Engineering, LLC. Every Project Needs a Plan 25 W 8th Street, Ste B Bayonne, NJ, 07002 (201) 589-0906 info@hudsoneng.com Project: 262-270 Main St Project #: JMA02P003.05 Subject: Geotechnical Engineering Investigation Report Date: 08/19/2025 Prepared by: Jordan Cecinini, PE License #: GE05496800 Contents 1 Introduction................................................................................................................................................ 1 2 Investigation .............................................................................................................................................. 1 2.1 Desk Study .................................................................................................................................................... 1 2.2 Standard Penetration Testing (SPT) ............................................................................................................. 1 2.2.1 Standard Penetration Testing (SPT) Methodology .................................................................................. 1 2.3 Laboratory Testing ........................................................................................................................................ 1 3 Investigation Results ................................................................................................................................. 2 3.1.1 Results ....................................................................................................................................................... 3 4 Construction Recommendations ............................................................................................................... 3 4.1 Foundation Recommendations ..................................................................................................................... 3 4.2 Foundation Moisture Protection

Page 3

.1 Foundation Recommendations ..................................................................................................................... 3 4.2 Foundation Moisture Protection ................................................................................................................... 3 4.3 Frost Considerations ..................................................................................................................................... 4 4.4 Retaining Wall Recommendations ............................................................................................................... 4 4.5 Slab on Grade ................................................................................................................................................ 4 4.6 Parking and Driveway Area (If Required) ................................................................................................... 5 4.7 Excavation ..................................................................................................................................................... 5 4.7.1 Pre-Excavation Recommendations .......................................................................................................... 5 1

Page 4

Geotechnical Engineering Investigation Report JMA02P003.05- 08/19/2025 262-270 Main St 4.7.2 Excavation Recommendations ................................................................................................................. 5 4.8 Dewatering .................................................................................................................................................... 5 4.9 Subgrade Preparation .................................................................................................................................... 6 4.10 Backfill .......................................................................................................................................................... 6 5 Limitations ................................................................................................................................................. 7 6 Bibliography .............................................................................................................................................. 7 Appendix A: Boring Testing Locations ............................................................................................................ 8 Appendix B: Soil Boring Logs .......................................................................................................................... 9 Appendix C: Laboratory Testing Results........................................................................................................ 10 2

Page 5

Geotechnical Engineering Investigation Report JMA02P003.05- 08/19/2025 262-270 Main St 1 Introduction Hudson Engineering, LLC (HE) was engaged by Jorge Mastropietro Architects to perform a Geotechnical Investigation for the new development at 262-270 Main St West Orange, NJ,07052 (Block: 114 Lot: 50-55) in Essex County, New Jersey (“Project Site”). The proposed development will consist of a new supermarket and parking lot. The geotechnical investigation included an initial desktop review of local geology along with two (2) Standard Penetration Test (SPT) Borings. A project site map with all locations of performed tests has been provided in Appendix This Geotechnical Recommendations Report (Report) summarizes the information gathered from reference sources, a soil testing program conducted on May 29, 2025, and lab results from samples collected during the testing program in order to provide project-specific data and geotechnical recommendations to assist the design and construction of the proposed 262-270 Main St development. 2 Investigation 2.1 Desk Study Prior to the field investigation, Hudson Engineering conducted a desktop study of the local geology within the project area using publicly available references including published maps and online geological databases. These references included the review of the surficial geological mapping provided by the United States Geological Survey (USGS) for the project area, review of the USDA Natural Resource Conservation Services (NRCS) Web Soil Survey application, and the NJDOT Historic Boring Data. These references were used to give Hudson Engineering insight on possible soil conditions that could be expected at the site prior to conducting field investigations of the site. 2.2 Standard Penetration Testing (SPT) Hudson Engineering oversaw the geotechnical standard penetration tests (SPT’s) to advance the two (2) geotechnical soil borings (B-1 and B-2) at the project site on May 29, 2025. 2.2.1 Standard Penetration Testing (SPT) Methodology Each soil boring was advanced to split-spoon refusal using a track rig to collect soil samples using the Standard Penetration Test (SPT) Method with mud rotary advancement. Fourteen to eighteen inches long soil samples were collected

Page 5

split-spoon refusal using a track rig to collect soil samples using the Standard Penetration Test (SPT) Method with mud rotary advancement. Fourteen to eighteen inches long soil samples were collected continuously until the termination depth. In each case, Borings were completed in accordance with ASTM standard D1586 and D6151. Upon completion, each borehole was backfilled to its existing grade with either soil cuttings, bentonite chips, concrete, or a combination thereof. All subsurface explorations were observed and logged and were directed by Hudson Engineering, LLC. 2.3 Laboratory Testing Representative soil samples collected within our investigation program were submitted to a licensed geotechnical laboratory for testing of material index properties in accordance with their applicable ASTM standards. A summary of laboratory testing data is provided in each section below. The as-received laboratory results are provided in Appendix C: Laboratory Testing Results. 1

Page 6

Geotechnical Engineering Investigation Report JMA02P003.05- 08/19/2025 262-270 Main St 3 Investigation Results Table 1 – Sieve & Hydrometer Testing Results % SAND % Gravel % Fines Moisture Classification Boring Sample Depth Coarse Medium Fine Coarse Fine Silt Clay Content USCS AASHTO ID (%) B-1 S-3 4’-6’ 9.9 13.5 15.7 11.1 32.7 17.1 0 6.8 GM A-1-b B-1 S-6 18’-20’ 8.6 13.1 30.4 21.9 16.8 7.3 1.9 12.7 SP-SM A-1-b B-1 S-7 23’-25’ 5.6 6.7 27.8 9.6 18.5 23.9 7.9 12.7 SM A-2-4(0) B-2 S-3 8’-10’ 12.6 19.0 18.4 6.4 32.7 10.9 0 5.8 SP-SM A-1-a Table 2 – Liquid & Plastic Limits Testing Results Boring Coefficients Sample Depth LL PL PI ID D90 D50 D10 D85 D30 Cu D60 D15 Cc B-1 S-3 4’-6’ NA NA NA 27.879 3.1095 NA 16.677 0.2943 NA 6.0316 NA NA B-1 S-6 18’-20’ NA NA NA 33.016 1.1366 0.0828 30.403 0.2653 51.22 4.2394 0.1322 0.20 B-1 S-7 23’-25’ NA NA NA 18.773 0.1949 0.0082 13.895 0.0689 56.79 0.4644 0.0191 1.25 B-2 S-3 8’-10’ NA NA NA 16.873 2.3156 NA 14.416 0.4448 NA 4.5337 0.1288 NA Table 3 – Unconfined Compression Test Results of Intact

Page 6

3 8’-10’ NA NA NA 16.873 2.3156 NA 14.416 0.4448 NA 4.5337 0.1288 NA Table 3 – Unconfined Compression Test Results of Intact Rock Core per ASTM D 2938 Unconfined Boring Depth Density of Rock Core Compression Strength ID Encountered (lb/ft^3) (psi) B-1 30’ 8,620 158.15 Table 4: Generalized Subsurface Profile Observed Water Table Material Boring Layer Depths BGS (ft) Depth BGS (ft) Asphalt B1 0’-0.5’ 18’ B2 0’-0.5’ Not Observed Silt B1 0.5’-2’ 18’ (ML) B2 NA Not Observed Silty Gravel B1 4’-18’ 18’ (GM) B2 NA Not Observed Silty Sand B1 18’-20’ 18’ (SP-SM) B2 0’-9.5’ Not Observed Silty Sand B1 23’-30’ 18’ (SM) B2 NA Not Observed B1 30’ 18’ Bedrock B2 9.5’

Page 6

ved B1 30’ 18’ Bedrock B2 9.5’ Not Observed 2