Supporting Documentation · May 6, 2026
13026 Resubmission
0e7392dd7d594406a7ef76abd40438d954e383491ee5ec94505f00a12f9db01dIndexed text · page 32
Show all pagesSTRUCTURAL ENGINEER EMPLOYEE HUDSON ENGINEERING, LLC. PARKING SPOT 25 W8TH STREET, BSMT TAX MAP LOT 50 BAYONNE, NJ 07002 201 614 5304
201 614 5304 46 OFF-STREET PARKING SPOTS SOLAR PANELS SOLAR PANELS 23' - 4 7 147' - 11 1/4" EV /8" CIVIL ENGINEER AREA AREA HUDSON ENGINEERING, LLC. RAIN GARDEN
RAIN GARDEN 25 W8TH STREET, BSMT BAYONNE, NJ 07002 PROSPECT PL. 201 614 5304 EV
EV 40.00' R.O.W. SKYLIGHT EV PARKING SIGN: ARCHITECT'S SEAL: BACK IN PARKING ONLY
PARKING ONLY SOLAR PANELS SOLAR PANELS AREA AREA EV SKYLIGHT EV PROGRESS DATE: 29-01-2026 100' - 0" TAX MAP LOT 55 JM
JM 2 STORY SUPERMARKET BUILDING PRINCIPAL IN CHARGE CC 25' - 0" (25.00') PROJECT TEAM JM
CHECKED BY SHEET DESCRIPTION ARCHITECTURAL SITE PLAN COMMERCIAL ENTRY/EXIT ISSUED FOR:
ISSUED FOR: No. Date Description ADJOINING DWELLING 95' - 10 1/4" 10' - 0" 0' - 0" (0.00') 110' - 4 7/8" RAIN GARDEN
0' - 0 85/256" (0.03') RAIN GARDEN TEMPORARY LOADING SPOT 1 ON-S TREET PARKI 25' - 0" 0' - 8 151/256" (0.72') A0.04 NG SP 64' - 0" OTS
SHEET NUMBER PARKING 74' - 11 7/8" ACCESS MAIN S NOTES: 55.00' R T. DOB APPROVAL STAMP: .O.W. - SITE
File revisions (1)
- Sep 29, 2026
0e7392dd7d5956,556,372 bytes