Supporting Documentation · May 6, 2026
13026 Resubmission
0e7392dd7d594406a7ef76abd40438d954e383491ee5ec94505f00a12f9db01dIndexed text · page 51
Show all pages---- ---- ---- ---- ----
---- ---- ---- ----
---- ---- 1 LIGHTING PLAN C1.11 SCALE: 1/16"=1'-0" No. ----
---- ---- ---- ----
---- ---- ---- ----
---- ---- ---- ----
---- LIGHT SCHEDULE ITEM# TYPE # LIGHTS HEIGHT L-1 C-WP-C-RDC-3SL-SCCT_12W_4000K 1 8'-6" NEW JERSEY
L-2 GLEON-AF-04-LED-E1 4 18'-0" 262-270 MAIN ST SITE REDEVLOPMENT L-3 GLEAON-AF-02-LED-E1 1 18'-0" LIGHTING NOTES: 1. THE PROPOSED PHOTOMETRIC LIGHTING PLAN HAD BEEN DEVELOPED
1. THE PROPOSED PHOTOMETRIC LIGHTING PLAN HAD BEEN DEVELOPED LIGHTING PLAN JORGE MASTROPIETRO ARCHITECTS PER THE STANDARDS OF THE WEST ORANGE 25-14 LIGHTING STANDARDS.
SITE CIVIL DESIGN 2. THE PROPOSED LIGHT FIXTURE FOR LOADING RAMP SHALL BE THE S3L C-WP-C-RDC SERIES C-LITE CUTOFF LED WALL PACK (OR APPROVED EQUAL), INSTALLED AT 8-6" ABOVE GRADE. 2.1. THE MINIMUM FOOT-CANDLES FOR THIS INSTALLATION WITHIN THE RAMP AREA IS 0.9.
File revisions (1)
- Sep 29, 2026
0e7392dd7d5956,556,372 bytes