PB 25 12 Application
99718697e29a016b4d2d11e4f87eeea35b359f5e29e7828aee737a34f535e855Indexed text
---- ---- ---- ---- ---- ---- ---- ----
REVISION ---- ---- ---- ---- ---- ---- ---- ---- ----
---- ---- ---- ---- ---- 50' STABILIZED CONSTRUCTION ENTRANCE STONE SIZE: ASTM C-33, SIZE NO.2 (2 12" TO 1 12") (SEE DETAIL D5/C1.5) No. ----
---- ---- ---- ---- ---- ---- ---- ---- ---- ----
---- ---- ---- ---- SOIL EROSION AND SEDIMENT NEW JERSEY 262-270 MAIN ST SITE REDEVLOPMENT JORGE MASTROPIETRO ARCHITECTS
OPIETRO ARCHITECTS SITE CIVIL DESIGN CONTROL ESSEX WEST ORANGE 1 SEDIMENT CONTROL PLAN C1.09 SCALE: 1/16"=1'-0" 0' 5' 10' 20' 30' 40' 50' 60' DRAWN BY : DESIGN BY : CHECKED BY : SCALE : HP HP JC AS NOTED SHEET #: SCALE: 1/16" = 1'-0" DATE :
SCALE: 1/16" = 1'-0" DATE : 05/15/2025 C1.09 BINDING ORDER: JOB No. : JMA02P003.01 09 of 12
15 FT. FABRIC SECURED TO FENCE POST H HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT (SPACING 8'-0" C TO C) SOIL EROSION AND SEDIMENT CONTROL NOTES SET ON POST WITH METAL DRAWSTRING RUNNING U
HE FILTER FABRIC FASTENERS AND THROUGH THE FABRIC 1. ALL SOIL EROSION AND SEDIMENT CONTROL PRACTICES ON THIS PLAN WILL BE CONSTRUCTED IN ACCORDANCE WITH THE “NEW JERSEY STANDARDS FOR SOIL EROSION AND SEDIMENT CONTROL” REINFORCEMENT ALONG TOP OF FENCE 7TH EDITION LAST REVISED JULY 2017, EFFECTIVE DECEMBER 2017. THESE MEASURES WILL BE INSTALLED PRIOR TO ANY MAJOR SOIL DISTURBANCE OR IN THEIR PROPER SEQUENCE AND MAINTAINED UNTIL PERMANENT PROTECTION IS ESTABLISHED. BETWEEN FASTENER AND FABRIC.
D 2. SOIL TO BE EXPOSED OR STOCKPILED FOR A PERIOD OF GREATER THAN 14 DAYS, AND NOT UNDER ACTIVE CONSTRUCTION, MAY BE REQUIRED TO BE TEMPORARILY MULCHED, AND SEEDED OR S 13.25 FT. 2'-0" MIN. OTHERWISE PROVIDED WITH VEGETATIVE COVER AS PER APPENDIX A3. THIS TEMPORARY COVER SHALL BE MAINTAINED UNTIL SUCH TIME WHEREBY PERMANENT RESTABILIZATION IS ESTABLISHED. 3. SEEDING DATES: THE FOLLOWING SEEDING DATES ARE RECOMMENDED TO BEST ESTABLISH PERMANENT VEGETATIVE COVER WITHIN MOST LOCATIONS IN THE HEPSCD: SPRING - 3/1-5/15 AND SILT ACCUMULATION FILTER BAG FALL - 8/15 - 10/1 4. 5. SEDIMENT FENCES ARE