Supporting Documentation · May 6, 2026
PB 25 12 Application
99718697e29a016b4d2d11e4f87eeea35b359f5e29e7828aee737a34f535e855Indexed text
RANSITION REQUESTED PRIOR TO ACTUAL ESTABLISHMENT OF PERMANENT VEGETATION. UP TO 50% REDUCTION IN APPLICATION RATES MAY BE USED WHEN PERMANENT VEGETATION IS ESTABLISHED PRIOR TO REQUESTING A REPORT OF COMPLIANCE FROM THE DISTRICT. D1 DETAIL: FILTER BAG FOR TRENCH DEWATERING BETWEEN STABILIZED CONSTRUCTION ENTRANCE AND PUBLIC R.O.W. ALL DOCUMENTS PREPARED BY HUDSON ENGINEERING, LLC ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED C1.10 SCALE: NTS TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON E X T E N S I ON S OF T HE P R O JE C T O R O N A N Y OT HE R THESE RATES APPLY TO ALL METHODS OF SEEDING. ESTABLISHING PERMANENT VEGETATION MEANS 80% VEGETATIVE COVER (OF THE SEEDED SPECIES) AND MOWED ONCE. PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION LENGTH ACCORDING TO TABLE * OR ADAPTATION BY HUDSON ENGINEERING, LLC FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE NOTE THIS DESIGNATION OF MOWED ONCE DOES NOT GUARANTEE THE PERMANENCY OF THE TURF SHOULD OTHER MAINTENANCE FACTORS BE NEGLECTED OR OTHERWISE MISMANAGED. RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO HUDSON ENGINEERING, LLC; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS HUDSON ENGINEERING, *NOTE: 72 HOURS PRIOR TO ANY SOIL DISTURBANCE, NOTICE IN WRITING, SHALL BE GIVEN TO THE FREEHOLD SOIL CONSERVATION DISTRICT AND A PRE-CONSTRUCTION MEETING HELD. EXCESS LLC FROM ALL CLAIMS, DAMAGES, LOSSES AND
LLC FROM ALL CLAIMS, DAMAGES, LOSSES AND EXISTING EXPENSES ARISING OUT OF OR RESULTING THEREFROM FLOW GROUNDS PUBLIC R.O.W. CONSTRUCTION SEQUENCE 1. INSTALL CONSTRUCTION ENTRANCE AND OTHER EROSION CONTROL MEASURES INCLUDING SILT FENCING - 1 WEEK BY CHK 2. CLEAR & DEMO SITE, ROUGH GRADING - 1 WEEK ----
---- ---- ---- ---- ---- ----
---- ---- ---- ---- ----
---- ---- ---- 2 EACH DUMP 3. REMOVE EXISTING GRAVEL - 1 WEEK STRAPS
---- ---- ---- ---- ----
---- ---- ---- ---- ----
---- ---- ---- ---- 4. CONSTRUCT TURFSTONE - 2 WEEKS 5. REMOVE ALL EROSION CONTROL STRUCTURES -1 DAY