Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 6, 2026

PB 25 12 Application

Preserved file SHA-25699718697e29a016b4d2d11e4f87eeea35b359f5e29e7828aee737a34f535e855

Indexed text · page 183

Show all pages
Page 183

---- ---- ---- ---- ----

Page 183

---- ---- ---- ---- ----

Page 183

---- ---- ---- ---- 4. CONSTRUCT TURFSTONE - 2 WEEKS 5. REMOVE ALL EROSION CONTROL STRUCTURES -1 DAY

Page 183

DATE ---- ---- ---- ----

Page 183

---- ---- ---- ---- ----

Page 183

---- ---- ---- ---- ----

Page 183

---- EXPANSION RESTRAINT *NOTE: INDIVIDUAL LOT ACCESS POINTS MAY REQUIRE STABILIZATION. (1/4" NYLON ROPE, THICKNESS SHOWN IS FOR STONE CONSTRUCTION ENTRANCE ONLY (TYP.). 2" FLAT WASHERS) LENGTH OF STONE REQUIRED INSTALLATION DETAIL BAG DETAIL PERCENT SLOPE

Page 183

BAG DETAIL PERCENT SLOPE OF ROADWAY COARSE GRAINED SOILS FINE GRAINED SOILS DUMP 0 TO 2% 50 FT. 100 FT. STRAP NOTES ON STORM SEWER INLET PROTECTION: 2 TO 5% 100 FT. 200 FT. REVISION ENTIRE SURFACE STABILIZED WITH HOT MIX ASPHALT

Page 183

ENTIRE SURFACE STABILIZED WITH HOT MIX ASPHALT ---- ---- ---- ---- ----

Page 183

---- ---- ---- ---- ----

File revisions (1)