Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 6, 2026

PB 25 12 Application

Preserved file SHA-25699718697e29a016b4d2d11e4f87eeea35b359f5e29e7828aee737a34f535e855

Indexed text · page 158

Show all pages
Page 158

TO BE VERIFIED IN THE FIELD. CONTRACTOR IS ADVISED THAT MINOR ADJUSTMENTS MAY BE REQUIRED TO AVOID POTENTIAL CONFLICTS. 00 R-T 0'

Page 158

8. ALL EARTHWORK ACTIVITIES SHALL COMPLY WITH THE COUNTY SOIL CONSERVATION DISTRICT'S RULES AND REGULATIONS GOVERNING EROSION CONTROL. I-B COLU B-1 JOHN ST

Page 158

9. THE SITE PLAN INDICATES THE APPROXIMATE LOCATION OF EXISTING PIPING. THE CONTRACTOR SHALL LOCATE ALL EXISTING PIPE BY TEST PIT AND/OR TEST TRENCH TO AVOID POSSIBLE CONFLICTS WITH NEW PIPING. THE CONTRACTOR SHALL NOTIFY ALL UTILITY MBIA WHITTLESEY AVE

Page 158

WEST ORANGE COMPANIES AND NJ ONE CALL PRIOR TO CONSTRUCTION; ALL PIPELINES AND CONDUITS SHALL BE MARKED OUT. THIS WORK SHALL BE AT NO ADDITIONAL COST TO THE OWNER.

Page 158

S T LIBE B-1 10. DURING ALL CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL COMPLY WITH ALL THE REQUIREMENTS OF THE STATE OF NEW JERSEY CONSTRUCTION SAFETY CODES, HIGH VOLTAGE PROXIMITY ACTS AND OSHA. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR STI

Page 158

RTY WATSON AVE COMPLIANCE WITH ALL LOCAL BUILDING CODES AND ORDINANCES. WAT CHU NG A

Page 158

R-T HIGH ST 11. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING REQUIRED APPROVALS FROM AUTHORITIES WITH JURISDICTION OVER PROPOSED WORK.

Page 158

12. THE CONTRACTOR SHALL CONTACT THE PROPER UTILITY REPRESENTATIVE FOR QUESTIONS OR COORDINATION OF CONSTRUCTION RELATED TO EXISTING UTILITIES. VE I CO ND

Page 158

IT LN WATCHUNG AVE CALL BEFORE YOU DIG, NEW JERSEY ONE CALL: 811 13. PROVIDE SHEETING/SHORING

Page 158

13. PROVIDE SHEETING/SHORING REQUIRED TO PROTECT EXISTING STRUCTURES, PIPES, AND FACILITIES. DRAWN BY : DESIGN BY : CHECKED BY : SCALE :

File revisions (1)