Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 6, 2026

PB 25 12 Application

Preserved file SHA-25699718697e29a016b4d2d11e4f87eeea35b359f5e29e7828aee737a34f535e855

Indexed text

Page 162

ATIONS. 9. UPON COMPLETION OF THE FIRST YEAR OF THE TWO (2) YEAR PLANT GUARANTEE PERIOD, THE CONTRACTOR IS RESPONSIBLE FOR SUBSTITUTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE PROCUREMENT OF PLANT MATERIAL AS 5. PLANT MATERIAL SHALL BE INSPECTED FOR PEST DAMAGE AND INFESTATION AT REGULAR INTERVALS. FOR ADJUSTING OR REMOVING ALL STAKES. THIS SHALL BE DONE IN CONSULTATION WITH THE CITY REPRESENTATIVE. ALL STAKES REQUIRED TO MEET THE CONSTRUCTION SCHEDULE, AND FOR ENSURING THE SURVIVAL AND CONTINUED HEALTH OF THE PLANT APPLY PEST CONTROL MEASURES ACCORDING TO THE LIFE CYCLE OF THE PESTS. ALL PESTICIDES WEST ORANGE REMAINING SHALL THEN BECOME THE RESPONSIBILITY OF THE OWNER. MATERIAL, ONCE IT IS DELIVERED. SHALL BE APPLIED BY A LICENSED PRACTITIONER. 10. IF THERE IS A DISCREPANCY BETWEEN THE PLANT COUNT SHOWN IN THE PLANT LIST AND THE PLANTING GRAPHIC, THE 22. WATERING MUST TAKE PLACE THROUGHOUT THE 2 YEAR PERIOD, AT LEAST 20 GALLONS AT APPROXIMATELY TWO WEEK 6. SEASONAL MAINTENANCE NECESSARY TO ENSURE HEALTHY AND VIGOROUS GROWTH OF PLANT GRAPHIC SHALL TAKE PRECEDENCE. INTERVALS FROM MAY 15 TO OCTOBER 31. CONTRACTOR AMY NEED TO INCREASE OR REDUCE THE FREQUENCY OF WATERING BASED MATERIAL AND TO MAINTAIN THE APPEARANCE OF THE LANDSCAPED AREAS SHALL BE PERFORMED AS 11. IF THE CONTRACTOR DETERMINES THE SUB-GRADE SOIL CONDITIONS ARE DELETERIOUS TO PLANT GROWTH OR WILL INHIBIT ON WEATHER CONDITIONS, RESULTING SOIL WATER CONTENT OR OTHER FACTORS.

Page 162

ERMINES THE SUB-GRADE SOIL CONDITIONS ARE DELETERIOUS TO PLANT GROWTH OR WILL INHIBIT ON WEATHER CONDITIONS, RESULTING SOIL WATER CONTENT OR OTHER FACTORS. NEEDED. DRAINAGE, THE LANDSCAPE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY AND PRIOR TO INSTALLATION OF PLANT MATERIAL. 23. EXISTING TREES TO REMAIN MAY BE PRUNED TO ACCOMMODATE CONSTRUCTION ACTIVITIES. CARE SHALL BE TAKEN TO AVOID 7. PLANTING BEDS SHALL BE WEEDED AND EDGED AS NEEDED TO MAINTAIN A NEAT APPEARANCE AND TO 12. PLANT PERENNIALS AND GROUND COVER IN 8" DEEP TOPSOIL BED CONSISTING OF 2/3 TOPSOIL AND 1/3 HUMUS. PLANT BULBS NEGATIVELY IMPACTING THE HEALTH OR STRUCTURAL INTEGRITY OF THE TREE. PRUNING SHALL BE DONE UNDER THE DIRECTION OF PREVENT THE ESTABLISHMENT OF WEEDS. IN NATURALIZED DRIFTS. A CERTIFIED NEW JERESY TREE EXPERT. 8. ALL MULCHED AREAS SHALL BE RAKED AND MULCH SHALL BE REPLENISHED AS NEEDED EACH SPRING. 13. TOPSOIL AND SEED ALL AREAS DISTURBED AS A RESULT OF ANY AND ALL DISTURBANCES, CONSTRUCTION, OR STORAGE OF 24. NO SOIL DISTURBANCE SHALL OCCUR OUTSIDE THE LIMIT OF DISTURBANCE. 9. PRUNING OF DEAD AND DAMAGED BRANCHES SHALL BE PERFORMED EACH FALL, AND AS NEEDED EQUIPMENT WHETHER SUCH AREAS ARE SHOWN ON THE PLANS OR NOT. 25. SHADE TREES SHALL BE LIMED UP TO A HEIGHT OF 5'-0" FOLLOWING DAMAGE TO PLANT MATERIAL. 14. ALL EXISTING SOIL SHALL BE REMOVED AND BACK FILLED WITH NEW TOPSOIL MEETING PARKS AND FORESTRY SPECIFICATION. 26. ALL LANDSCAPING AREAS SHALL BE APPROPRIATELY PLANTED AND MAINTAINED WITH ANY DAMAGED, DISEASED OR DEAD 10. DEBRIS AND DEAD LEAVES SHALL BE REMOVED FROM PLANTING BEDS IN THE FALL AND EARLY SPRING. 15. ALL PLANT MATERIAL SHALL BE NURSERY GROWN AND SHALL CONFORM TO THE AMERICAN ASSOCIATION OF NURSERYMEN'S MATERIAL REPLACED, ON AN ON-GOING BASIS.

Page 162

ION OF NURSERYMEN'S MATERIAL REPLACED, ON AN ON-GOING BASIS. 0' 5' 10' 20' 30' 40' 50' 60' DRAWN BY : DESIGN BY : CHECKED BY : SCALE : AMERICAN STANDARD FOR NURSERY STOCK. HP HP JC AS NOTED 16. ALL PLANT BEDS ARE TO BE SEPARATED FROM LAWN AREA WITH A 3" DEEP 'V' TRENCH. SHEET #: 17. KEEP MULCH 1/2" BELOW TOP OF PAVEMENTS AND CURBS. SCALE: 1/16" = 1'-0" DATE : 05/15/2025

Page 162

05/15/2025 C1.05 18. ALL LANDSCAPING SHALL BE IN A HEALTHY AND VIGOROUS GROWING CONDITION AT THE TIME OF INSTALLATION. NO PLANT BINDING ORDER: SHALL REMAIN AT THE SITE FOR MORE THAN THREE (3) DAYS AFTER DELIVERY WITHOUT BEING PROPERLY HEALED IN. NO TREE WITH JOB No. : A DAMAGE CENTRAL LEADER SHALL RECEIVE FINAL ACCEPTANCE. JMA02P003.01 05 of 12

Page 163

RENOVATION AND ADDITION 262-270 MAIN STREET WEST ORANGE, NJ 07052 1123 BROADWAY, SUITE 302, NY, NY 10010 PHONE 646.248.6664 WWW.JMAPC.COM BLOCK 114, LOT 50 & 55 ARCHITECT: ESSEX COUNTY JORGE E. MASTROPIETRO NY

Page 163

NY LICENSE NO. 036208-1 BUILDING AND SITE DATA JENNIFER PALERMO ITEM DATA NJ LICENSE NO. AI 015932 BLOCK NO. 114 LOT NO. 50 & 55 ZONING DISTRICT B-1 PROJECT: OCCUPANCY

Page 163

OCCUPANCY S, M R 200' 262-270 MAIN STREET USE GROUP S-1, S-2. M CONSTRUCTION TYPE A-III WEST ORANGE ESSEX COUNTY, NJ 07052 - 0" SITE AREA

Page 163

SITE AREA 30,218 SF BUILDING HEIGHT 24' BLOCK 114 LOT 50 & 55 NUMBER OF STORIES 1 1/2 R 0" 10 AREA OF LARGEST FLOOR 13,934 SF '- OWNER:

Page 163

OWNER: 00 00 BUILDING FOOTPRINT 13,934 SF '- " 262 MAIN STREET 10 0 0' - 0" R 0 TOTAL LAND AREA DISTURBED 30,218 SF R 20 R2

Page 163

R 20 R2 REALTY LLC 0' BUILDING AREA 19,744 SF -0 0" 262-270 MAIN STREET " '- 0 00 VOLUME CF R1 FLOOD HAZARD ZONE X WEST ORANGE, NJ 07052 BASE FLOOD ELEVATION N/A

File revisions (1)