Supporting Documentation · Aug 20, 2026
26 02 09 Perez Whittlesey CME Planning Review 2
10eaf730fc4189ad2322e5f318c746281b6495df1f6cf0823168af1bbf25955bIndexed text
One Market Street, Suite 1F Camden, NJ 08102 732.410.2651 www.cmeusa1.com February 9, 2026 West Orange Township – Zoning Board 66 Main Street West Orange, NJ 07052 Re: Juan & Zenobia Perez – CME Planning Review #2 66 Whittlesey Avenue Block 129, Lot 60 Zone: R-T Residential Our File No. 115.WRZ0129.V01 Dear Chairman and Board Members: 1. Summary The property is located at the center of Whittlesey Avenue, in proximity to Colgate field and Edison Middle School. The applicant is proposing to develop the rear portion of the property with a 2.5 story addition which will include two 2-bedroom apartments, along with the existing home on the site. Variances are required to permit three dwelling units on the site and additional building height, as well as the existing conditions such as insufficient front yard setbacks and excess lot coverage.
West Orange Zoning Board February 9, 2026 Re: 66 Whittlesey Avenue Our File No. 115.WRZ0129.V01 Planning Review #2 Page 2 H:\Legacy\Howell-FS1\SEC\West Orange\Zoning Board\115.WRZ0129.V01 - 66 Whittlesey Ave (Perez)\Review Phase\CME & Board Prof Review Reports & Correspondence\26-01-22 Whittlesey - CME Planning Review 1.docx 2. Project and Property Description The property is located on Whittlesey Avenue bounded by existing residential dwellings. The property has 75 feet of street frontage, and a depth of 100 feet (7,500 square feet in area) and currently contains an existing 2.5-story single family dwelling and a detached one-car garage and storage shed in the rear. Much of the rear and east side of the lot is paved, while the west side contains a mixture of shrubs, grass, and a paved walkway beside the home. The applicant is proposing to construct a 3-story addition to the structure on the west side of the existing house. The addition will contain two new 2-bedroom apartments, and is proposed to match the existing building height of approximately 42 feet, and the existing front yard setback as well, at 9.29 feet. No changes are proposed to the driveway, parking, or circulation on the site, except for the removal of the walkway on the west side of the home. As the proposed site improvements constitute a major site plan by Township code, a review by the Township’s Site Plan Review Advisory Board (SPRAB) is required. The site is surrounded by residential dwellings, primarily single and two family dwellings. 3. Zoning Compliance The property is located within the ‘R-T Residential district’ of the Township. Permitted Principal Uses Single-and two family dwellings are permitted in the district. A 3-family, or multi-family dwelling is not permitted in the R-T district. A d-1 use variance is required. Bulk Requirements All development in the R-T district is subject to the following bulk regulations: R-T Zone Bulk Requirements Required / Permitted Existing Proposed Variance Min Lot Area 7,500 sf 7,500 s.f. 7,500 s.f. No Min Lot Width 75 feet 75 feet 75 feet No Min Front Yard 30 feet 9.35 feet 9.29 feet Yes Min Rear Yard 30 feet 46.88 feet 38.89 feet No
West Orange Zoning Board February 9, 2026 Re: 66 Whittlesey Avenue Our File No. 115.WRZ0129.V01 Planning Review #2 Page 3 H:\Legacy\Howell-FS1\SEC\West Orange\Zoning Board\115.WRZ0129.V01 - 66 Whittlesey Ave (Perez)\Review Phase\CME & Board Prof Review Reports & Correspondence\26-01-22 Whittlesey - CME Planning Review 1.docx R-T Zone Bulk Requirements Required / Permitted Existing Proposed Variance Min Side Yard 10 + 8 feet 25.97 feet 28.19 feet 25.97 feet 8.47 feet No Maximum Building Coverage 40% 20.8% 33.12% No Maximum Lot Coverage 55% 62.8% 73.81% Yes Maximum Building Height 2.5 story / 35 feet 2.5 story +/- 42 feet 3 story +/- 42 feet Yes Accessory Structure Min Distance from Principal Structure 15 feet 21.19 feet 21.19 feet No Max Building Height 15 feet +/- 12 feet No change No Max Number of Stories 1.5 1 1 No Max Coverage in the Rear Yard 33.33% 18.17% 18.57% No ENC = Existing Non-Conformity Parking & Loading Three family dwellings are required to adhere to the provisions for townhouse developments. Off- street parking is required for Townhomes at 2.3 spaces per 2-bedroom unit, located either on street or in common parking areas. • 2.3 spaces x 3 (2- bedroom apartments) = 6.9 spaces • 7 total parking spaces are required by code • Four parking spaces are provided. 3 regular parking spaces in the rear of the site and 1 garage parking space. 4. Variances & Waivers Required It appears that the following conditions will variance or design waiver relief from the Board to permit the project as proposed: Variances:
West Orange Zoning Board February 9, 2026 Re: 66 Whittlesey Avenue Our File No. 115.WRZ0129.V01 Planning Review #2 Page 4 H:\Legacy\Howell-FS1\SEC\West Orange\Zoning Board\115.WRZ0129.V01 - 66 Whittlesey Ave (Perez)\Review Phase\CME & Board Prof Review Reports & Correspondence\26-01-22 Whittlesey - CME Planning Review 1.docx a. §25-7.1 Attachment 2 – Three-family or multi-family dwellings are not permitted in the R- T district. A d-1 use variance is required. b. §25-7.1 Maximum Building Height – The maximum building height is 2.5 stories / 35 feet where, and 3 stories +/- 42 feet is proposed. As this height increase is greater than 10% of the maximum permitted, this requires a d-6 height variance. c. §25-7.1 Front Yard – The minimum required front yard setback is 30 feet, where 9.35 currently exists, and 9.29 feet is proposed. d. §25-7.1 Maximum Lot Coverage – The maximum lot coverage permitted is 55% of the total lot area, where 62.8% has existed, and 73.81% proposed. e. § 25-12.2(a) Parking Spaces – The minimum number of parking spaces required is 7 parking spaces, where 4 are proposed. 5. Master Plan Considerations The Township’s Master Plan was last reexamined in December of 2019. The following goals, objectives, and recommendations of the Master Plan may be relevant to this application: • Maintain the existing scale of the community. • Improve and maintain existing residential neighborhoods. • Encourage appropriate residential development. 6. Planning Comments a. The applicant should discuss the proposed project, addressing the general scale and scope of improvements proposed for the site. b. The application as proposed will require a D-1 use variance for non-compliance with the permitted principal use requirements for uses in the R-T Residential District. With any ‘d’ variance, the applicant has an enhanced burden of proof to demonstrate that both the positive and negative criteria can be satisfied before the Board can grant a ‘d’ variance: i. Positive Criteria: The applicant must show that there are special reasons to grant the variance. Special reasons can come in one of three forms: 1) that there is an economic inutility in using the property for one of the permitted uses in the district; 2) that the proposed use is considered “inherently beneficial”; or 3) that the proposed use would promote the general welfare by advancing one of the purposes of
of the permitted uses in the district; 2) that the proposed use is considered “inherently beneficial”; or 3) that the proposed use would promote the general welfare by advancing one of the purposes of zoning, and that the site is particularly suited for the use.
West Orange Zoning Board February 9, 2026 Re: 66 Whittlesey Avenue Our File No. 115.WRZ0129.V01 Planning Review #2 Page 5 H:\Legacy\Howell-FS1\SEC\West Orange\Zoning Board\115.WRZ0129.V01 - 66 Whittlesey Ave (Perez)\Review Phase\CME & Board Prof Review Reports & Correspondence\26-01-22 Whittlesey - CME Planning Review 1.docx The site suitability test requires that the applicant demonstrate that there is something specific about the site characteristics that make it particularly suitable for, or lend itself to use a multi-family property rather than a single family or two family use on the property as is otherwise expressly permitted. ii. Negative Criteria: The applicant must show that the proposed use will not have a substantial detrimental impact on the public good, and will not substantially impair the intent and purpose of the zone plan. This means that allowing the three-family structure on the site would not substantially negatively impact the character of the community or quality of life for neighborhood residents, and that allowing a three-family dwelling is not directly contradictory to the intent of the Township’s zoning ordinance. The applicant must reconcile the fact that a three-family dwelling is not a permitted use in the district with the purposes behind the regulations permitting only one and two family dwellings. c. The application as proposed will also require a d-6 height variance for non-compliance with the permitted height requirements for uses in the R-T Residential District. For any ‘d’ variance, the applicant has an enhanced burden of proof to show that both the positive and negative criteria can be satisfied. For the d-6 variance, the focus of these proofs though should be on the increase in permitted height. i. Positive Criteria: The applicant must show that there are special reasons to grant the height variance. Special reasons can come from demonstrating undue hardship by: 1. Showing that the height restriction prohibits the use of the property for a conforming structure, or in the alternative that the dimension of the building does not offend the purpose of the height restriction, which primarily focuses on light, air, and density. 2. A particular style of house could promote a harmonious, consistent visual environment while not offending the purpose of the height restriction. ii. Negative Criteria: The applicant must show that
2. A particular style of house could promote a harmonious, consistent visual environment while not offending the purpose of the height restriction. ii. Negative Criteria: The applicant must show that the proposed use will not have a substantial detrimental impact on the public good and will not substantially impair the intent and purpose of the zone plan. d. The application as proposed will also require several bulk or ‘c’ variances. The applicant must satisfy both the positive and negative criteria for each of these variances as well: i. Positive Criteria: The applicant must show that either there is an undue hardship (practical difficulty) in strictly conforming to the code that is caused by the unique conditions of the property (c-1 hardship), or that the proposed conditions represent
West Orange Zoning Board February 9, 2026 Re: 66 Whittlesey Avenue Our File No. 115.WRZ0129.V01 Planning Review #2 Page 6 H:\Legacy\Howell-FS1\SEC\West Orange\Zoning Board\115.WRZ0129.V01 - 66 Whittlesey Ave (Perez)\Review Phase\CME & Board Prof Review Reports & Correspondence\26-01-22 Whittlesey - CME Planning Review 1.docx a preferable alternative to conforming to the standards of the code, that the purposes of zoning will be advanced, and that the benefits of the deviation would outweigh any detrimental impacts (c-2 flexible). ii. Negative Criteria: The applicant must show that the variance can be granted without substantial detriment to the public good, and without substantially impairing the intent and purpose of the zone plan. e. In the case of any d-1 use variance, the bulk standards that have been adopted for the particular district, in this case those of the R-T district, were not intended for uses other than those that are considered permitted uses. The standards of the R-T district are not intended to apply to multi-family dwellings. In these cases, bulk variances related to specific requirements of the R-T district can be considered subsumed within the Board’s consideration of the use variance. The Zoning Board can at its reasonable discretion determine appropriate bulk standards such as building setbacks and buffering requirements. f. The applicant should provide testimony addressing the deficiency of parking spaces. It should be noted that per § 25-12.2(a)(4), subject to the Zoning Board’s Discretion, where on-street parking is available, a portion of the off-street parking requirement shall be reduced by the number of available on-street parking spaces, with each on-street space calculated at a standard length of 23 feet. g. The applicant should address access to the parking spaces in the rear. It is not clear that there is sufficient maneuvering space for larger vehicles to navigate into some of the parking spaces, in particular the space at the eastern edge of the property. h. It appears that the proposed steps to the new structure will encroach into the ROW. Any encroachment into the ROW would require approval by the Township Council, and the Zoning Board cannot grant permission for such an encroachment. We recommend that the steps be angled so that they are perpendicular to the house and they can be located entirely on the property. i. The
oning Board cannot grant permission for such an encroachment. We recommend that the steps be angled so that they are perpendicular to the house and they can be located entirely on the property. i. The applicant should provide clarification regarding the height and number of stories of the principal and accessory structures. The application materials indicate the proposed structure as 2.5 stories, but it appears that the majority of the 3rd level underneath the gambrel roof would be tall enough to be considered a third story rather than a half story. j. The applicant should address the design standards for buildings in the residential districts found in §25-9.7 of the Township code. The general intent of these design standards is to avoid excessive repetition and duplication in residential design. k. No landscaping plans have been provided. We recommend that additional landscaping in the form of shrubs and/or ornamental trees be provided in the side yard between the addition and the adjacent residence.
West Orange Zoning Board February 9, 2026 Re: 66 Whittlesey Avenue Our File No. 115.WRZ0129.V01 Planning Review #2 Page 7 H:\Legacy\Howell-FS1\SEC\West Orange\Zoning Board\115.WRZ0129.V01 - 66 Whittlesey Ave (Perez)\Review Phase\CME & Board Prof Review Reports & Correspondence\26-01-22 Whittlesey - CME Planning Review 1.docx l. The applicant should address the methods for garbage and trash pickup and the locations and type of receptacles. f. We defer any comment on grading, drainage, utilities, and stormwater management to the Board Engineer. g. The applicant should address the status of any necessary outside agency approvals. If you have any questions about this report, please do not hesitate to reach out to our office. Sincerely, CME Associates Christopher N. Dochney – PP, AICP Program Manager Zoning Board Planner CD:ME cc: Geniece Gary-Adams – Township Zoning Official Zayibeth Carballo, PE, PLS, PP – Township Engineer Steven Warner, Esq. – Board Attorney Alex Fisher, Esq. – Board Attorney John Hess, PE, PP, CME – Board Engineer Ryan MacNeill, PE – Board Engineer Juan & Zenobia Perez- Applicant Michael J. Piromalli, Esq. – Applicant’s Attorney William P. Stimmel, P.E., P.P., PTOE – Applicant’s Planner Joseph N. Bachi, PE, C.M.E. – Applicant’s Engineer Joseph Molinari, Associate AIA – Applicant’s Architect
File revisions (1)
- Sep 29, 2026
10eaf730fc41635,493 bytes