Supporting Documentation · Apr 16, 2026
2026 04 03 Township Resubmission Letter rcd 4 6 2026
18d63f3ce83d504d64267316f37fd4378e5fd5d6449e2dc27be67713f72137d9Indexed text
www.dynamicec.com Lake Como, NJ | Chester, NJ | Toms River, NJ | Newark, NJ | Marlton, NJ | Newtown, PA | Philadelphia, PA | Bethlehem, PA King of Prussia, PA | Allen, TX | Houston, TX | Austin, TX | Delray Beach, FL | Tampa, FL | Annapolis, MD | Newark, DE Dynamic Engineering Consultants, PC 825 8Th Avenue Belmar, NJ 07719 T. 732-974-0198 April 3, 2026 Via FedEx Overnight & Electronic Township of West Orange Zoning Board of Adjustment 66 Main Street West Orange, NJ 07052 Attn: Diana Chandler-Zimmermann Zoning Board Secretary RE: MPB Realty, LLC Proposed Popeyes & IHOP Restaurant Block 153, Lot 38 470 Eagle Rock Avenue (CR 611) Township of West Orange Essex County, New Jersey DEC# 1021-99-025 Application No. ZB-22-13 CME File No. VWRZ0153.01 (60002) CME File No. WRZ0153.V01 Dear Ms. Chandler-Zimmermann, On behalf of the Applicant, MPB Realty, LLC, this letter shall serve as the formal resubmission to the Township of West Orange Zoning Board of Adjustment towards issuance of Preliminary and Final Site Plan Approval for the above referenced project. Enclosed please find the following documents for review: • Five (5) signed copies of the Planning Report + Justifications of Variances, prepared by Dresdner Robin, dated 2/24/2025, last revised 4/3/2026; • Five (5) signed copies of the Tree Removal Report, prepared by our office, dated February 2025, last revised April 2, 2026; and • Five (5) signed and sealed copies of the Demolition and Tree Removal Plan Exhibit and the Landscape Plan Exhibit, prepared by our office, dated 3/6/2026, last revised 4/1/2026. The enclosed documents have been provided to address the review comments provided in the Township Forester Review Memorandum, prepared by Walt Kipp, Township Forester, dated 3/18/2026.
Township of West Orange April 3, 2026 Page 2 of 2 In order to facilitate review, below please find an itemized response to the remaining comments: 3. A NJ State Licensed Tree Expert must provide a written report itemizing each tree by species, DBH, location (diagram) and health in order to determine replacement requirements. Once this is received, we will calculate replacement. Enclosed please find the revised Tree Removal Report, which has been prepared by a NJ State Licensed Tree Expert. Please also find enclosed the revised Demolition and Tree Removal Plan Exhibit and Landscape Plan Exhibit per the revised report. The Report and Exhibit itemize each tree to be removed by species, DBH, location and health. If approved, the Site Plan drawings will be revised to match these exhibits. 7. Please refer to our current Tree Ordinance, updated June 10, 2024 with regard to tree replacement and requirements. The enclosed documents have been prepared in accordance with the referenced current Tree Ordinance. 8. A NJ Licensed Tree Contract, registered with the Township must be used for any tree work. Acknowledged. Should you have any questions, comments or require additional information, please do not hesitate to contact our office. Sincerely, DYNAMIC ENGINEERING CONSULTANTS, PC Matthew J. Bersch, PE Danny Goncalves, PE Enclosures cc: Benjamin T.F. Wine, Esq. (via electronic) Sally C. La-Zheng (via electronic) Danielle Kinback (via electronic) Ed Baksh (via electronic) Lawrence BenBassett (via electronic) Kevin Savage, PE, PTOE (via electronic) Robert A. Grimaldi, RA (via electronic) Mallory Clark, PP (via electronic) Michael J. Dick, INCE Bd. Cert. (via electronic)
File revisions (1)
- Sep 29, 2026
18d63f3ce83d282,061 bytes