262-270 MAIN ST SITE REDEVLOPMENT EXISTING SITE SURVEY E DG EHIL B-2 03

Page 1

03 C1.01 SCALE: 1"=20' JORGE MASTROPIETRO ARCHITECTS

Page 1

JORGE MASTROPIETRO ARCHITECTS COVER SHEET L RD GENERAL NOTES:

Page 1

GENERAL NOTES: SITE CIVIL DESIGN R-T R-T 1. THE FOLLOWING NOTES APPLY TO ALL SHEETS OF THESE DOCUMENTS.

Page 1

1. THE FOLLOWING NOTES APPLY TO ALL SHEETS OF THESE DOCUMENTS. R =1 0'

Page 1

2. CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES, SCHEDULE, WORKING HOURS, AND ACCESS TO SITE WITH PROPERTY OWNER. 00 00 =1

Page 1

0' ESSEX R

Page 1

3. THE CONTRACTOR SHALL COORDINATE ANY STORAGE ON SITE WITH THE PROPERTY OWNER. THE CONTRACTOR SHALL DISPOSE OF ANY PAVEMENT/SUBGRADE REMOVED FOR CONSTRUCTION, AT NO ADDITIONAL COST TO THE OWNER. I 4. CONTRACTOR SHALL COMPLY WITH LOCAL CONSTRUCTION STORMWATER DISCHARGE REGULATIONS AND REQUIREMENTS.

Page 1

B-1 5. PRIOR TO EXCAVATION FOR NEW STRUCTURES, ELECTRICAL CONDUIT, FABRICATION OF NEW PIPING AND/OR OTHER PROPOSED UTILITIES, VERIFY ALL EXISTING PIPING AND UTILITIES IN THE WORK AREA. THE CONTRACTOR SHALL TEMPORARILY RELOCATE CONFLICTING

Page 1

EXISTING UTILITIES AT TIE-IN CONNECTION LOCATIONS AND REINSTALL AS REQUIRED TO ELIMINATE THE CONFLICT AT NO ADDITIONAL COST TO THE OWNER. 0 0' 10 6. CONTRACTOR SHALL ADEQUATELY PROTECT ALL EXISTING PIPELINES AND STRUCTURES DURING INSTALLATION OF DRY WELL SYSTEM.