Final Engineering 262 270 Main
b5230880743413e6bb1d59464fa84c8de2b86147a796ff7401173badae7c90beIndexed text · page 1
Show all pages262-270 MAIN ST SITE REDEVLOPMENT EXISTING SITE SURVEY E DG EHIL B-2 03
03 C1.01 SCALE: 1"=20' JORGE MASTROPIETRO ARCHITECTS
JORGE MASTROPIETRO ARCHITECTS COVER SHEET L RD GENERAL NOTES:
GENERAL NOTES: SITE CIVIL DESIGN R-T R-T 1. THE FOLLOWING NOTES APPLY TO ALL SHEETS OF THESE DOCUMENTS.
1. THE FOLLOWING NOTES APPLY TO ALL SHEETS OF THESE DOCUMENTS. R =1 0'
2. CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES, SCHEDULE, WORKING HOURS, AND ACCESS TO SITE WITH PROPERTY OWNER. 00 00 =1
0' ESSEX R
3. THE CONTRACTOR SHALL COORDINATE ANY STORAGE ON SITE WITH THE PROPERTY OWNER. THE CONTRACTOR SHALL DISPOSE OF ANY PAVEMENT/SUBGRADE REMOVED FOR CONSTRUCTION, AT NO ADDITIONAL COST TO THE OWNER. I 4. CONTRACTOR SHALL COMPLY WITH LOCAL CONSTRUCTION STORMWATER DISCHARGE REGULATIONS AND REQUIREMENTS.
B-1 5. PRIOR TO EXCAVATION FOR NEW STRUCTURES, ELECTRICAL CONDUIT, FABRICATION OF NEW PIPING AND/OR OTHER PROPOSED UTILITIES, VERIFY ALL EXISTING PIPING AND UTILITIES IN THE WORK AREA. THE CONTRACTOR SHALL TEMPORARILY RELOCATE CONFLICTING
EXISTING UTILITIES AT TIE-IN CONNECTION LOCATIONS AND REINSTALL AS REQUIRED TO ELIMINATE THE CONFLICT AT NO ADDITIONAL COST TO THE OWNER. 0 0' 10 6. CONTRACTOR SHALL ADEQUATELY PROTECT ALL EXISTING PIPELINES AND STRUCTURES DURING INSTALLATION OF DRY WELL SYSTEM.