Supporting Documentation · May 6, 2026
Final Engineering 262 270 Main
b5230880743413e6bb1d59464fa84c8de2b86147a796ff7401173badae7c90beIndexed text · page 10
Show all pagesSITE CIVIL DESIGN INLET SEDIMENT CONTROL DEVICE DETAIL D2 DETAIL: INLET SEDIMENT CONTROL DEVICE ESSEX C1.10 SCALE: NTS HAY BALES NOTE: SIDE SLOPES SHALL BE A MAXIMUM OF
SIDE SLOPES SHALL BE A MAXIMUM OF 2:1. BACKFILL STOCKPILE PLASTIC MEMBRANE COVER STOCKPILE SHALL BE SEEDED IMMEDIATELY. MATERIAL STOCKPILE DETAIL WEST ORANGE HAY BALES, (TYP.)
HAY BALES, (TYP.) D6 DETAIL: MATERIAL STOCKPILE C1.10 SCALE: NTS PLASTIC MEMBRANE BOTTOM SECTION DRAWN BY : DESIGN BY : CHECKED BY : SCALE : HP HP
HP HP JC AS NOTED SHEET #: D3 DETAIL: SOIL STOCKPILE DATE : 05/15/2025
C1.10 BINDING ORDER: JOB No. : C1.10 SCALE: NTS JMA02P003.01 10 of 13
File revisions (1)
- Sep 29, 2026
b5230880743449,292,919 bytes