Page 5

TIME OF PLANTING. 7. CUT AND REMOVE BURLAP FROM TOP 2/3 OF BALL AND REMOVE WIRE BASKET COMPLETELY. NYLON ROPE AND/OR NYLON FALL DIG HAZARD PLANTS MAY BE PLANTED DURING THIS TIME FRAME, PROVIDED THEY HAVE BEEN DUG PRIOR TO OCTOBER 1ST, OR 4. FERTILIZE ALL LAWN AREAS ONCE PER SEASON DURING THE SPRING, SUMMER, AND FALL. FERTILIZER BALLING MATERIAL IS NOT ACCEPTABLE. ARE CONTAINER GROWN. SHALL BE A LOW PHOSPHORUS COMMERCIAL FERTILIZER, WITH A MINIMUM OF 7% NITROGEN BY WEIGHT, 8. LOCATE GUY WIRES SO THAT THEY WILL NOT PULL CROTCH APART. 21. THE CLASSIFICATION OF A SPECIES AS A FALL DIG HAZARD SHALL NOT BE CONSIDERED A SUFFICIENT OR ACCEPTABLE REASON AS DESCRIBED IN THE LANDSCAPE SPECIFICATIONS. 9. UPON COMPLETION OF THE FIRST YEAR OF THE TWO (2) YEAR PLANT GUARANTEE PERIOD, THE CONTRACTOR IS RESPONSIBLE FOR SUBSTITUTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE PROCUREMENT OF PLANT MATERIAL AS 5. PLANT MATERIAL SHALL BE INSPECTED FOR PEST DAMAGE AND INFESTATION AT REGULAR INTERVALS. FOR ADJUSTING OR REMOVING ALL STAKES. THIS SHALL BE DONE IN CONSULTATION WITH THE CITY REPRESENTATIVE. ALL STAKES REQUIRED TO MEET THE CONSTRUCTION SCHEDULE, AND FOR ENSURING THE SURVIVAL AND CONTINUED HEALTH OF THE PLANT APPLY PEST CONTROL MEASURES ACCORDING TO THE LIFE CYCLE OF THE PESTS. ALL PESTICIDES WEST ORANGE REMAINING SHALL THEN BECOME THE RESPONSIBILITY OF THE OWNER.

Page 5

WEST ORANGE REMAINING SHALL THEN BECOME THE RESPONSIBILITY OF THE OWNER. MATERIAL, ONCE IT IS DELIVERED. SHALL BE APPLIED BY A LICENSED PRACTITIONER. 10. IF THERE IS A DISCREPANCY BETWEEN THE PLANT COUNT SHOWN IN THE PLANT LIST AND THE PLANTING GRAPHIC, THE 22. WATERING MUST TAKE PLACE THROUGHOUT THE 2 YEAR PERIOD, AT LEAST 20 GALLONS AT APPROXIMATELY TWO WEEK 6. SEASONAL MAINTENANCE NECESSARY TO ENSURE HEALTHY AND VIGOROUS GROWTH OF PLANT GRAPHIC SHALL TAKE PRECEDENCE. INTERVALS FROM MAY 15 TO OCTOBER 31. CONTRACTOR AMY NEED TO INCREASE OR REDUCE THE FREQUENCY OF WATERING BASED MATERIAL AND TO MAINTAIN THE APPEARANCE OF THE LANDSCAPED AREAS SHALL BE PERFORMED AS 11. IF THE CONTRACTOR DETERMINES THE SUB-GRADE SOIL CONDITIONS ARE DELETERIOUS TO PLANT GROWTH OR WILL INHIBIT ON WEATHER CONDITIONS, RESULTING SOIL WATER CONTENT OR OTHER FACTORS. NEEDED. DRAINAGE, THE LANDSCAPE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY AND PRIOR TO INSTALLATION OF PLANT MATERIAL. 23. EXISTING TREES TO REMAIN MAY BE PRUNED TO ACCOMMODATE CONSTRUCTION ACTIVITIES. CARE SHALL BE TAKEN TO AVOID 7. PLANTING BEDS SHALL BE WEEDED AND EDGED AS NEEDED TO MAINTAIN A NEAT APPEARANCE AND TO 12. PLANT PERENNIALS AND GROUND COVER IN 8" DEEP TOPSOIL BED CONSISTING OF 2/3 TOPSOIL AND 1/3 HUMUS. PLANT BULBS NEGATIVELY IMPACTING THE HEALTH OR STRUCTURAL INTEGRITY OF THE TREE. PRUNING SHALL BE DONE UNDER THE DIRECTION OF PREVENT THE ESTABLISHMENT OF WEEDS. IN NATURALIZED DRIFTS. A CERTIFIED NEW JERESY TREE EXPERT. 8. ALL MULCHED AREAS SHALL BE RAKED AND MULCH SHALL BE REPLENISHED AS NEEDED EACH SPRING. 13. TOPSOIL AND SEED ALL AREAS DISTURBED AS A RESULT OF ANY

Page 5

8. ALL MULCHED AREAS SHALL BE RAKED AND MULCH SHALL BE REPLENISHED AS NEEDED EACH SPRING. 13. TOPSOIL AND SEED ALL AREAS DISTURBED AS A RESULT OF ANY AND ALL DISTURBANCES, CONSTRUCTION, OR STORAGE OF 24. NO SOIL DISTURBANCE SHALL OCCUR OUTSIDE THE LIMIT OF DISTURBANCE. 9. PRUNING OF DEAD AND DAMAGED BRANCHES SHALL BE PERFORMED EACH FALL, AND AS NEEDED EQUIPMENT WHETHER SUCH AREAS ARE SHOWN ON THE PLANS OR NOT. 25. SHADE TREES SHALL BE LIMED UP TO A HEIGHT OF 5'-0" FOLLOWING DAMAGE TO PLANT MATERIAL. 14. ALL EXISTING SOIL SHALL BE REMOVED AND BACK FILLED WITH NEW TOPSOIL MEETING PARKS AND FORESTRY SPECIFICATION. 26. ALL LANDSCAPING AREAS SHALL BE APPROPRIATELY PLANTED AND MAINTAINED WITH ANY DAMAGED, DISEASED OR DEAD 10. DEBRIS AND DEAD LEAVES SHALL BE REMOVED FROM PLANTING BEDS IN THE FALL AND EARLY SPRING. 15. ALL PLANT MATERIAL SHALL BE NURSERY GROWN AND SHALL CONFORM TO THE AMERICAN ASSOCIATION OF NURSERYMEN'S MATERIAL REPLACED, ON AN ON-GOING BASIS. 0' 5' 10' 20' 30' 40' 50' 60' DRAWN BY : DESIGN BY : CHECKED BY : SCALE : AMERICAN STANDARD FOR NURSERY STOCK. HP HP JC AS NOTED 16. ALL PLANT BEDS ARE TO BE SEPARATED FROM LAWN AREA WITH A 3" DEEP 'V' TRENCH.

Page 5

JC AS NOTED 16. ALL PLANT BEDS ARE TO BE SEPARATED FROM LAWN AREA WITH A 3" DEEP 'V' TRENCH. SHEET #: 17. KEEP MULCH 1/2" BELOW TOP OF PAVEMENTS AND CURBS. SCALE: 1/16" = 1'-0" DATE : 05/15/2025 C1.05 18. ALL LANDSCAPING SHALL BE IN A HEALTHY AND VIGOROUS GROWING CONDITION AT THE TIME OF INSTALLATION. NO PLANT

Page 5

BINDING ORDER: SHALL REMAIN AT THE SITE FOR MORE THAN THREE (3) DAYS AFTER DELIVERY WITHOUT BEING PROPERLY HEALED IN. NO TREE WITH JOB No. : A DAMAGE CENTRAL LEADER SHALL RECEIVE FINAL ACCEPTANCE. JMA02P003.01 05 of 13

Page 6

H U PRUNE ONLY DEAD AND BROKEN BRANCHES AT TIME OF PLANTING, D S HE UNLESS OTHERWISE DIRECTED BY THE LANDSCAPE ARCHITECT OR ARBORIST. NEVER CUT OR PRUNE LEADER

Page 6

O "ARBOR TIES" (3 TIES, 120° APART) "ARBOR TIE" SHALL BE LOOPED AROUND TREE ENGINEERING THROUGH EACH OTHER NO MULCH SHALL COME WITHIN 3" OF TWISTED AND SECURED CONTACT WITH TRUNK FLARE OR TRUNK TO THE STAKE HUDSON ENGINEERING, LLC COLLAR. ROOT FLARE TO BE EXPOSED AND FLUSH WITH FINISHED GRADE 25 WEST 8TH STREET, STE B

Page 6

25 WEST 8TH STREET, STE B CUT AND REMOVE BURLAP FROM BAYONNE, NEW JERSEY 07002 TOP 2/3 OF ROOT BALL, NOTCH TO HOLD STAKING AND PLANTING NOTES: (201) 589-0906 REMOVE WIRE BASKET COMPLETELY WIRE IN PLACE 3" THICK LAYER OF SHREDDED 1. STAKES AND "ARBOR TIES" TO BE USED ONLY IF BARK MULCH CONDITIONS MERIT AND SHALL BE REMOVED BY THE CONTRACTOR AFTER ONE YEAR. SEE STAKING NOTES

Page 6

AFTER ONE YEAR. SEE STAKING NOTES 2. EVERGREENS 4'-6' HT. - 2'-3' OF STAKE ABOVE GROUND 3. EVERGREENS 6'-8' HT. - 3'-4' OF STAKE ABOVE GROUND DATE: 02/26/2026 4. EVERGREENS 8'-10' HT., 4'-6' OF STAKE ABOVE GROUND 5. WIRE BASKETS SHALL BE COMPLETELY REMOVED BEFORE PLANTING JORDAN CECININI NJ PROFESSIONAL ENGINEER LIC. NO. GE54968

Page 6

NJ PROFESSIONAL ENGINEER LIC. NO. GE54968 6. INSTALL PHC TREE SAVER MYCORRHIZAL FUNGAL TRANSPLANT INOCULANT FOR TREES AND SHRUBS. INSTALL ONE 3 OUNCE PACKET PER CALIPER INCH OR FINISHED GRADE PER 1 FOOT OF ROOTBALL DIA. 8' LONG 2" DIA CEDAR PLANNING BOARD CHAIRMAN UNDISTURBED GRADE STAKES SET OUTSIDE BACKFILL WITH NEW OF ROOTBALL TOPSOIL 5 STREET TREE SPACING GUIDELINES