Supporting Documentation · May 6, 2026
Final Engineering 262 270 Main
b5230880743413e6bb1d59464fa84c8de2b86147a796ff7401173badae7c90beIndexed text
---- ---- ---- ---- ----
---- ---- ---- ---- ----
---- ---- ---- ---- 1 LIGHTING PLAN C1.11 SCALE: 1/16"=1'-0" No.
No. ---- ---- ---- ---- ----
---- ---- ---- ---- ----
---- ---- ---- ---- LIGHT SCHEDULE
ITEM# TYPE # LIGHTS HEIGHT L-1 C-WP-C-RDC-3SL-SCCT_12W_4000K 1 8'-6" NEW JERSEY L-2 GLEON-AF-04-LED-E1 4 18'-0" 262-270 MAIN ST SITE REDEVLOPMENT
L-3 GLEAON-AF-02-LED-E1 1 18'-0" LIGHTING NOTES: 1. THE PROPOSED PHOTOMETRIC LIGHTING PLAN HAD BEEN DEVELOPED LIGHTING PLAN JORGE MASTROPIETRO ARCHITECTS PER THE STANDARDS OF THE WEST ORANGE 25-14 LIGHTING
ER THE STANDARDS OF THE WEST ORANGE 25-14 LIGHTING STANDARDS. SITE CIVIL DESIGN 1.1. MINIMUM LEVELS OF ILLUMINATION OF A B-1 ZONE PER 25-14.3 1.1.1. PEDESTRIAN WALKWAYS: 0.9 FOOTCANDLES 1.1.2. PARKING AREAS: 2.0 FOOT CANDLES 1.1.3. STREETS: 1.2
1.1.3. STREETS: 1.2 2. THE PROPOSED LIGHT FIXTURE FOR LOADING RAMP SHALL BE THE S3L ESSEX C-WP-C-RDC SERIES C-LITE CUTOFF LED WALL PACK (OR APPROVED EQUAL), INSTALLED AT 8-6" ABOVE GRADE. 2.1. THE MINIMUM FOOT-CANDLES FOR THIS INSTALLATION WITHIN THE RAMP AREA IS 0.9.
File revisions (1)
- Sep 29, 2026
b5230880743449,292,919 bytes