Final Traffic Impact Analysis

Preserved file SHA-256aec2e510e606a1af2c38c73e89ce552d1a1d437a9696db16e214e314aaf50cfe

Indexed text

Page 19

SATURDAY PEAK HOUR 12:15 P.M. TO 1:15 P.M. AO 38> fe) tt ' 3g 52y SITE 22, ENTER EXIT ~fble7 90 90 sT09 KLING STREET 14 Ce) ve) pea foe) De} caw PLACE im ied Legend 7) — =Existing Roadway E -- =Proposed Driveway PROPOSED SUPERMARKET FIGURE 4c TOWNSHIP OF WEST ORANGE Essex County, NEW JERSEY DOLAN:DEAN SATURDAY PEAK HOUR y “CORSULING ENCREERS LIS” SITE GENERATED TRAFFIC VOLUMES

Page 20

MORNING PEAK HouR 7:30 A.M. TO 8:50 A.M. AO SITE ----+--+ STO KLING STREET Legend — =Existing Roadway -- =Proposed Driveway = ty ty ee Fy iz) Zz = = PROPOSED SUPERMARKET FIGURE 5A TOWNSHIP OF WEST ORANGE Essex COUNTY, NEW JERSEY MORNING PEAK HOUR > DOLAN:DEAN 2027 NO BUILD TRAFFIC VOLUMES ‘CONSULTING ENGINEERS, LLC

Page 21

EVENING PEAK HOUR 5:00 P.M. TO 6:00 P.M. SITE Legend — =Existing Roadway -- =Proposed Driveway N \Ond NOLO “4 eee Ss KLING STREET 656 = ty ty ee Fy iz) Zz = = PROPOSED SUPERMARKET TOWNSHIP OF WEST ORANGE Essex COUNTY, NEW JERSEY y) DOAN: DEAN ‘CONSULTING ENGINEERS, LLC FIGURE 58 EVENING PEAK HOUR 2027 NO BUILD TRAFFIC VOLUMES

Page 22

SATURDAY PEAK HOUR 12:15 P.M. TO 1:15 P.M. AO SITE eee Ss KLING STREET Legend — =Existing Roadway -- =Proposed Driveway = ty ty ee Fy iz) Zz = = PROPOSED SUPERMARKET FIGURE 5c TOWNSHIP OF WEST ORANGE Essex COUNTY, NEW JERSEY SATURDAY PEAK HOUR > DOLAN:DEAN 2027 NO BUILD TRAFFIC VOLUMES ‘CONSULTING ENGINEERS, LLC

Page 23

MORNING PEAK HouR 7:30 A.M. TO 8:50 A.M. AO Te) & SITE aS |S! ENTER EXIT ~ yl] — 105 Sl 2200 ¢60C sT09 KLING STREET |ate tan ton t Legend — =Existing Roadway -- =Proposed Driveway = ty ty ee Fy iz) Zz = = PROPOSED SUPERMARKET FIGURE 6A TOWNSHIP OF WEST ORANGE Essex COUNTY, NEW JERSEY DOLAN:DEAN MORNING PEAK HOUR > “CONSULING ENGREERS LL 2027 BUILD TRAFFIC VOLUMES

Page 24

EVENING PEAK HOUR 5:00 P.M. TO 6:00 P.M. SITE ENTER EXIT 79 80 Legend — =Existing Roadway -- =Proposed Driveway N \OLO NOLO “4 = ty ty ee Fy iz) Zz = = KLING STREET 679—> PROPOSED SUPERMARKET TOWNSHIP OF WEST ORANGE Essex COUNTY, NEW JERSEY y) DOAN: DEAN ‘CONSULTING ENGINEERS, LLC FIGURE 6B EVENING PEAK HOUR 2027 BUILD TRAFFIC VOLUMES

Page 25

SATURDAY PEAK HOUR 12:15 P.M. TO 1:15 P.M. SITE ENTER EXIT 90 90 Legend — =Existing Roadway -- =Proposed Driveway Ss KLING STREET = ty ty ee Fy iz) Zz = = PROPOSED SUPERMARKET TOWNSHIP OF WEST ORANGE Essex COUNTY, NEW JERSEY y) DOAN: DEAN ‘CONSULTING ENGINEERS, LLC FIGURE 6c SATURDAY PEAK HOUR 2027 BUILD TRAFFIC VOLUMES

Page 26

} none? SITE | FEO] ----+~+~+ STOR KLING STREET [choc | X ny PLACE 3 ERM ‘x Legend & — =Existing Roadway E -- =Proposed Driveway PROPOSED SUPERMARKET FIGURE 7 TOWNSHIP OF WEST ORANGE Essex County, NEW JERSEY DOLAN:DEAN MORNING (EVENING) [SATURDAY] PEAK HOUR ») “CONSULING ENGREERS LLC” 2027 NO BUILD LEVELS OF SERVICE

Page 27

} none? SITE JEON] ----+~+~+ STOR KLING STREET [A(A)A4 sr [clc)c4 equ PASE Legend — =Existing Roadway -- =Proposed Driveway [AAAS MAIN STREET PROPOSED SUPERMARKET FIGURE 8 TOWNSHIP OF WEST ORANGE Essex COUNTY, NEW JERSEY DOLAN:DEAN MORNING (EVENING) [SATURDAY] PEAK HOUR p) coLn.névNn TOSINS RGR 2027 BUILD LEVELS OF SERVICE

Page 28

National Data & Surveying Services Intersection Turning Movement Count Location: Main St & Erwin Pl City: West Orange Project ID: 25-340072-001 Control: 1-Way Stop(EB) Date: 5/20/2025 Data - Total NS/EW Streets: Main St Main St Erwin Pl Erwin Pl NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND AM 0 1 0 0 0 1 0 0 0 1 0 0 0 0 0 0 NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL 7:00 AM 3 81 0 0 0 130 1 0 3 0 3 0 0 0 0 0 221 7:15 AM 2 102 0 0 0 145 0 0 1 0 5 0 0 0 0 0 255 7:30 AM 0 143 0 0 0 148 2 0 3 0 7 0 0 0 0 0 303 7:45 AM 2 133 0 0 0 179 1 0 3 0 3 0 0 0 0 0 321 8:00 AM 2 121 0 0 0 137 0 0 0 0 2 0 0 0