Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 6, 2026

Hudson Essex Passaic Soil Conservation District 15 Ridgeway Ave

Preserved file SHA-256a6835dbdf8baa9487eafdbb25913c8c8faa67eba310386ddd401fad10b792e5a

Indexed text

Page 1

< HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT lew Jersey Natural Resources 80 ORCHARD STREET Conservation Program BLOOMFIELD, Nu 07003-5104 Telephone: (862) 333-4505 Fax: (862) 333-4507 www.hepsoilnj.org March 20, 2026 Amoghene Umude c/o 15 Ridgeway LLC 43 Edgewood Ave West Orange, NJ 07052 RE: Umude Ridgeway SFD Reconstruction 15 Ridgeway Ave, West Orange, NJ Block: 158 Lot: 28.01 HEPSCD Ch.251 ID# 226-E-7889, SESC plan by Ensurplan Inc, dated 2/26/26 Dear Applicant: The District has completed the review of the soil erosion and sediment control plan for the above referenced project and hereby reports that the plan meets the Standards for Soil Erosion and Sediment Control in New Jersey (N.J.A.C.290-1.1 et seq., promulgated pursuant to the New Jersey Soil Erosion and Sediment Control Act, N.J.S.A.4- 24-39 et seq.). Accordingly, the plan is certified by the Hudson-Essex-Passaic Soil Conservation District subject to the following conditions: * 48 hours prior to the commencement of any construction activity, complete & submit the District Start Notice form. The form is included in this mailing. © Acopy of the certified plan must be kept on the job site at all times. ¢ The applicant or contractor must request a final inspection (once landscaping and final soil stabilization is complete) & obtain a Report of Compliance prior to seeking a temporary or permanent Certificate of Occupancy. © The District must be provided with written notification of any conveyance of this project, subject property, or portions thereof, including individual residential lots if applicable. Said notice must provide the names, addresses, and telephone numbers of subsequent owners. © The District must be informed of address, email, and/or telephone number changes of owners, agents responsible for site construction, and job supervisors. Please be advised that the Soil Erosion and Sediment Control Act authorizes the issuance of stop construction orders and penalties of up to $3000 per day for violations of the certified plan or for failure to comply with the aforementioned requirements. Please be further advised that any conveyance of this project or portions thereof will transfer full responsibility for compliance with the certified plan to subsequent owners. Please contact the District if you require assistance implementing the certified soil erosion and sediment control

Page 1

sfer full responsibility for compliance with the certified plan to subsequent owners. Please contact the District if you require assistance implementing the certified soil erosion and sediment control plan. This certification is valid for 3-1/2 years from the date of this letter and is limited to the controls specified in this plan. It is not authori n to engage in proposed land use unless such use has been previously approved by the municipality or other controlling agency. Yours truly, A " 3 ry Matthew J. Ward Chairman Cc: Planner, Municipality, County STATE DEPARTMENT OF AGRICULTURE, STATE DEPARTMENT OF ENVIRONMENTAL PROTECTION, AND UNITED STATES NATURAL RESOURCES CONSERVATION SERVICE, COOPERATING Printed on Recycled Paper

Page 2

‘ KU ere For District Use Only : - 226-1885 New Jersey Eitetel Resmerces - Ay ‘ Conservation Program Yih: Seblile APPLICATION FOR SOIL EROSION AND SEDIMENT CONTROL PLAN CERTIFICATION The enclosed soil erosion and sediment control plan and supporting information are submitted for certification pursuant to the Soil Erosion and Sediment Control Act, Chapter 251, PLL. 1975 as amended uss 4:24-39 , ee ) An application for certification of a soil erosion and sediment control plan shalll include the items listed on the reverse side of this form. ude (eetheone i) (Ce Consivucinory. Name of Project / 5 z a i Doe. Project Location: Municipality Ww CS Oven ge Project Street Address / Ss ka sae wey fue Block /5E Lot 26-01 hones Kins ( ( nelle icin: ei teed Tr eT, Fur by be75 Gar¥ nae “tee ae NOPE NT se City State Zip Total _ ‘Area Total Disturbed Area he sul Restoration Area No. Dwelling or other Units tee (Acres) (Acres) jie! 7 ) L218 ce |" AWG Vac 2 Cam _¢ KAS) Plans Prepared by* Email of plan preparer: Phone# 772 a OYto Ensurpln~Ine, William Scot, PE Ensurplan CAMal com| roxy Street Ad Gi 3 = street Address Po Box. Y3o Y ‘ity W Quien OS on se *(Engineering related items of the Soil Erosion and Sediment Control Plan MUST be prepared by or under the direction of and be sealed by a Professional Engineer or Architect licensed in the State of New Jersey, in secordance with NJAC 13:27-6.1 et. seq.) ‘Agent Resporftible. eo Corson U a Email C ae €-F (Ca £ Wn pANE BeancS @muds cops beach! Street Address 43 El red bx City Ws Re NY zip PYCSY] pone Vy GS [Oey Foxe ‘The applicant hereby certifies that all soil erosion and sediment control measures are designed in accordance with current Standards for Soil Erosion and Sediment Control In New Jersey and will be installed in accordance with those Standards and the plan as approved by the Soil Conservation District and agrees as follows: 1. To notify the District in writing at least 48 hours in advance of any land 4. To allow District agents to go upon project lands for inspection. disturbance activity. Failure to provide such notification may result in additional inspection fees. 5. That any sag paid of this proj fe or portion thereof prior to its completion will transfer full responsibility for compliance with the certified plan to any 2. To notify the District upon completion of the Project (Note: No certificate

Page 2

r portion thereof prior to its completion will transfer full responsibility for compliance with the certified plan to any 2. To notify the District upon completion of the Project (Note: No certificate subsequent owners. of occupancy can be granted until a report of compliance is issued by the District. 6. To comply with all terms and conditions of this application and certified plan including payment of all fees prescribed by the district fee schedule hereby 3. To maintain a copy of the certified plan on the project site during construction. incorporated by reference. ‘The applicant hereby acknowledges that structural measures contained in the Soil Erosion and Sediment Control Plan are reviewed for adequacy to reduce offsite soil erosion and sedimentation and not for adequacy of structural design. The applicant shall retain full responsibility for any damages which may result from any construction activity notwithstanding district certification of the subject soil erosion and sediment control plan. It is understood that approval of the plan submitted with this application shall be valid only for the duration of the initial project approval granted by the municipality. All municipal renewals of this project will require submission and approval by the district. In no case shall the approval extend beyond three- and one-half years at which time resubmission and certification will be required. Soil Erosion and Sediment Control Plan certification is limited to the controls Specified i in the plan. Is not authorization to engage in the proposed land use unless such use has been previously approved by the, municipality or other controlling agenc: furth that all do design reports etc, submitted to the distri all b de available to the publ (upon request) pursuant to the Open lic 1. Applicant Certification* : 3. Plan determined complete: fi Signatu: ae ty _ hf wa ‘a ey hg Signature of District Official Hf 6 Applicant Name (Print) A wor it hex Ll! 2. Receipt of fee, plan and supporting documents i is hereby acknowledged: 4, Plan certified, denied or other actions noted above. Special Remarks: Signature of District Offic a = Dae / 4 7 ee 3LL Ce “If other than project on ie at ‘authorization of owner must be attached.

File revisions (1)