Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 3, 2026

12 2026 02 12 Crestmont CC Stormwater Management Report

Preserved file SHA-256af4b3e068e3e8fd5e13ba0340f7139ca27c9c412a037f50ebc781a156e29509e

Indexed text

Page 332

Hydrograph Report File: Eagle Rock Proposed (Current).hys Hydrology Studio v 3.0.0.39 10-21-2025 PR-1B (Swale) Hyd. No. 21 Hydrograph Type = Junction Peak Flow = 8.638 cfs Storm Frequency = 10-yr Time to Peak = 12.13 hrs Time Interval = 1 min Hydrograph Volume = 33,743 cuft Inflow Hydrographs = 13 Total Contrib. Area = 0.35 ac Qp = 8.638 cfs 9 8 7 6 5 Q (cfs) 4 3 2 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time (hrs) PR-1B-D PR-1B-U PR-1B (Swale)

Page 333

Hydrograph Report File: Eagle Rock Proposed (Current).hys Hydrology Studio v 3.0.0.39 10-21-2025 PR-1B (Swale) Hyd. No. 21 Hydrograph Type = Junction Peak Flow = 11.32 cfs Storm Frequency = 25-yr Time to Peak = 12.13 hrs Time Interval = 1 min Hydrograph Volume = 44,502 cuft Inflow Hydrographs = 13 Total Contrib. Area = 0.35 ac Qp = 11.32 cfs 13 12 11 10 9 8 7 Q (cfs) 6 5 4 3 2 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time (hrs) PR-1B-D PR-1B-U PR-1B (Swale)

Page 334

Hydrograph Report File: Eagle Rock Proposed (Current).hys Hydrology Studio v 3.0.0.39 10-21-2025 PR-1B (Swale) Hyd. No. 21 Hydrograph Type = Junction Peak Flow = 16.45 cfs Storm Frequency = 100-yr Time to Peak = 12.13 hrs Time Interval = 1 min Hydrograph Volume = 65,340 cuft Inflow Hydrographs = 13 Total Contrib. Area = 0.35 ac Qp = 16.45 cfs 18 17 16 15 14 13 12 11 10 Q (cfs) 9 8 7 6 5 4 3 2 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time (hrs) PR-1B-D PR-1B-U PR-1B (Swale)

Page 335

PR-1C-DISTURBED WATERSHED

Page 336

Project: Eagle Rock Avenue By: TEG Date: 10/21/2025 Location: West Orange, NJ Checked By: MJV Date Checked: 10/21/2025 Circle One: Present Developed Current Proposed Watershed PR-1C-D - Impervious Circle One: Tc Tt through subarea Include a map, schematic, or description of flow segments. Sheet Flow (Applicable to Tc Only) Segment ID 1 Smooth Surfaces 1. Surface Description (NEH table 15-1) 2. Manning's Roughness Coeff., n (NEH table 15-1) 0.011 3. Design Flow Length, Ldes (Total Ldes < 100 ft) ft 79 4. Two-year 24-hr rainfall, P2 in 3.46 5. Land Slope, s ft/ft 0.010 6. McCuen-Spiess Limit, Lmcs (max. 100 ft) Lmcs = (100 s0.5)/n ft 100 7. Compute Tt 0.007 (nLdes)0.8 hr 0.021 + + Tt = 0.5 0.4 P2 s Sheet Flow Sub-Total 0.021 hours Shallow Concentrated Flow Segment ID 8. Surface Description 9. Flow Length, L ft 10. Watercourse Slope, s ft/ft 11. Average Velocity, V (NEH table 15-3) ft/s 12. Compute Tt L hr + + Tt = 3600 V Shallow Conc. Flow Sub-Total

Page 336

Tt = 3600 V Shallow Conc. Flow Sub-Total 0.000 hours Channel Flow Segment ID 2 3 4 13. Flow Length, L ft 69 282 54 14. Cross Sectional flow area, a ft2 0.61 0.61 0.88 15. Wetted Perimeter, Pw ft 2.00 2.00 2.40 16. Hydraulic Radius, r r = a / Pw ft 0.31 0.31 0.37 17. Channel Slope, s ft/ft 0.005 0.023 0.020 18. Manning's Roughness Coeff., n 0.013 0.013 0.013 19. Velocity, V V = (1.49 r2/3 s1/2 ) / n ft/s 3.67 7.95 8.30 20. Compute Tt L hr 0.005 + 0.010 + 0.002 Tt = 3600 V Channel Flow Sub-Total 0.017 hours Channel Flow Segment ID 5 6 7 21. Flow Length, L ft 17 51 67 22. Cross Sectional flow area, a ft2 0.88 0.88 0.88 23. Wetted Perimeter, Pw ft 2.40

Page 336

ft2 0.88 0.88 0.88 23. Wetted Perimeter, Pw ft 2.40 2.40 2.40 24. Hydraulic Radius, r r = a / Pw ft 0.37 0.37 0.37 25. Channel Slope, s ft/ft 0.049 0.021 0.042 26. Manning's Roughness Coeff., n 2/3 1/2 27. Velocity, V V = (1.49 r s )/n ft/s 28. Compute Tt L hr + + Tt = 3600 V Channel Flow Sub-Total 0.000 hours Watershed or subarea Tc or Tt Total Tc (hours) = 0.038 hours (Add Sub-Total Tt from prior steps) Total Tc (minutes) = 2 minutes \\langan.com\data\PAR\data8\101049801\Project Data\_Discipline\Site Civil\Stormwater\Time of Concentration Calcs\Proposed Tc Calcs\Current Proposed TCs\Current Proposed TC PR-1C-D Impervious v1.4

Page 337

Project: Eagle Rock Avenue By: TEG Date: 10/21/2025 Location: West Orange, NJ Checked By: MJV Date Checked: 10/21/2025 Circle One: Present Developed Current Proposed Watershed PR-1C-D - Pervious Circle One: Tc Tt through subarea Include a map, schematic, or description of flow segments. Sheet Flow (Applicable to Tc Only) Segment ID 1 Dense Grasses 1. Surface Description (NEH table 15-1) 2. Manning's Roughness Coeff., n (NEH table 15-1) 0.24 3. Design Flow Length, Ldes (Total Ldes < 100 ft) ft 54 4. Two-year 24-hr rainfall, P2 in 3.46 5. Land Slope, s ft/ft 0.212 6. McCuen-Spiess Limit, Lmcs (max. 100 ft) Lmcs = (100 s0.5)/n ft 100 7. Compute Tt 0.007 (nLdes)0.8 hr 0.054 + + Tt = 0.5 0.4 P2 s Sheet Flow Sub-Total 0.054 hours Shallow Concentrated Flow Segment ID 8. Surface Description 9. Flow Length, L ft 10. Watercourse Slope, s ft/ft 11. Average Velocity, V (NEH table 15-3) ft/s 12. Compute Tt L hr + + Tt = 3600 V

Page 337

+ Tt = 3600 V Shallow Conc. Flow Sub-Total 0.000 hours Channel Flow Segment ID 2 3 4 13. Flow Length, L ft 17 51 67 14. Cross Sectional flow area, a ft2 0.88 0.88 0.88 15. Wetted Perimeter, Pw ft 2.40 2.40 2.40 16. Hydraulic Radius, r r = a / Pw ft 0.37 0.37 0.37 17. Channel Slope, s ft/ft 0.049 0.021 0.042 18. Manning's Roughness Coeff., n 0.013 0.013 0.013 19. Velocity, V V = (1.49 r2/3 s1/2 ) / n ft/s 13.05 8.54 11.98 20. Compute Tt L hr 0.000 + 0.002 + 0.002 Tt = 3600 V Channel Flow Sub-Total 0.004 hours Watershed or subarea Tc or Tt Total Tc (hours) = 0.058 hours (Add Sub-Total Tt from prior steps) Total Tc (minutes) = 3 minutes \\langan.com\data\PAR\data8\101049801\Project Data\_Discipline\Site Civil\Stormwater\Time of Concentration Calcs\Proposed Tc Calcs\Current Proposed TCs\Current Proposed TC PR-1C-D Pervious

Page 337

utes \\langan.com\data\PAR\data8\101049801\Project Data\_Discipline\Site Civil\Stormwater\Time of Concentration Calcs\Proposed Tc Calcs\Current Proposed TCs\Current Proposed TC PR-1C-D Pervious v1.4

File revisions (1)