Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 3, 2026

JMA02P003 262 270 Main Street Development Stormwater Management Report

Preserved file SHA-25672c20944aae1129b177592afa34a50dff15ad477ae008a09c1201da67830e01a

Indexed text

Page 165

Proposed Flows NOAA10 24-hr D 10-Year-Future Rainfall=6.31" Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 5/26/2026 HydroCAD® 10.20-8a Sampler s/n S05110 © 2025 HydroCAD Software Solutions LLC This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Pond 2P: Basin A - Chamber Wizard Field A Chamber Model = Cultec R-180HD (For residential use only) Effective Size= 33.6"W x 20.0"H => 3.44 sf x 6.33'L = 21.8 cf Overall Size= 36.0"W x 20.5"H x 7.33'L with 1.00' Overlap Row Length Adjustment= +1.00' x 3.44 sf x 8 rows 36.0" Wide + 6.0" Spacing = 42.0" C-C Row Spacing 11 Chambers/Row x 6.33' Long +1.00' Row Adjustment = 70.63' Row Length +12.0" End Stone x 2 = 72.63' Base Length 8 Rows x 36.0" Wide + 6.0" Spacing x 7 + 12.0" Side Stone x 2 = 29.50' Base Width 6.0" Stone Base + 20.5" Chamber Height + 6.0" Stone Cover = 2.71' Field Height 88 Chambers x 21.8 cf +1.00' Row Adjustment x 3.44 sf x 8 Rows = 1,943.5 cf Chamber Storage 5,802.8 cf Field - 1,943.5 cf Chambers = 3,859.4 cf Stone x 40.0% Voids = 1,543.8 cf Stone Storage Chamber Storage + Stone Storage = 3,487.2 cf = 0.080 af Overall Storage Efficiency = 60.1% Overall System Size = 72.63' x 29.50' x 2.71' 88 Chambers 214.9 cy Field 142.9 cy Stone

Page 166

Proposed Flows NOAA10 24-hr D 10-Year-Future Rainfall=6.31" Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 5/26/2026 HydroCAD® 10.20-8a Sampler s/n S05110 © 2025 HydroCAD Software Solutions LLC This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Pond 2P: Basin A Hydrograph 2.31 cfs Inflow Outflow Inflow Area=13,934 sf Discarded Primary Peak Elev=97.57' 2 Storage=2,678 cf 1.30 cfs Flow (cfs) 1.27 cfs 1 0.02 cfs 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours)

Page 167

Proposed Flows NOAA10 24-hr D 10-Year-Future Rainfall=6.31" Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 5/26/2026 HydroCAD® 10.20-8a Sampler s/n S05110 © 2025 HydroCAD Software Solutions LLC This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Pond 2P: Basin A Stage-Discharge Total Discarded Primary 98 Broad-Crested Rectangular Weir Elevation (feet) 97 Orifice/Grate 96 Exfiltration 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Discharge (cfs)

Page 168

Proposed Flows NOAA10 24-hr D 10-Year-Future Rainfall=6.31" Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 5/26/2026 HydroCAD® 10.20-8a Sampler s/n S05110 © 2025 HydroCAD Software Solutions LLC This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Pond 2P: Basin A Stage-Area-Storage Surface/Horizontal/Wetted Area (sq-ft) 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000 Surface Storage 98 Elevation (feet) 97 Cultec R-180HD 96 Field A 0 500 1,000 1,500 2,000 2,500 3,000 Storage (cubic-feet)

Page 169

Proposed Flows NOAA10 24-hr D 10-Year-Future Rainfall=6.31" Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 5/26/2026 HydroCAD® 10.20-8a Sampler s/n S05110 © 2025 HydroCAD Software Solutions LLC This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Hydrograph for Pond 2P: Basin A Time Inflow Storage Elevation Outflow Discarded Primary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 95.70 0.00 0.00 0.00 2.50 0.03 22 95.73 0.02 0.02 0.00 5.00 0.04 114 95.83 0.02 0.02 0.00 7.50 0.06 337 96.09 0.02 0.02 0.00 10.00 0.09 741 96.38 0.02 0.02 0.00 12.50 0.23 2,442 97.40 0.28 0.02 0.26 15.00 0.08 2,048 97.14 0.13 0.02 0.11 17.50 0.05 1,582 96.86 0.09 0.02 0.06 20.00 0.04 1,373 96.74 0.05 0.02 0.03 22.50 0.03 1,290 96.69 0.04 0.02 0.01 25.00 0.00 1,148 96.61 0.03 0.02 0.00 27.50 0.00 925 96.48 0.02 0.02 0.00 30.00 0.00 702 96.35 0.02 0.02 0.00 32.50 0.00 478 96.23 0.02 0.02 0.00 35.00 0.00 255 96.00 0.02 0.02 0.00 37.50 0.00 32 95.74 0.02 0.02 0.00 40.00 0.00 0 95.70 0.00 0.00 0.00 42.50 0.00 0 95.70 0.00 0.00 0.00 45.00 0.00 0 95.70 0.00

Page 169

0 95.70 0.00 0.00 0.00 42.50 0.00 0 95.70 0.00 0.00 0.00 45.00 0.00 0 95.70 0.00 0.00 0.00 47.50 0.00 0 95.70 0.00 0.00 0.00 50.00 0.00 0 95.70 0.00 0.00 0.00 52.50 0.00 0 95.70 0.00 0.00 0.00 55.00 0.00 0 95.70 0.00 0.00 0.00 57.50 0.00 0 95.70 0.00 0.00 0.00 60.00 0.00 0 95.70 0.00 0.00 0.00 62.50 0.00 0 95.70 0.00 0.00 0.00 65.00 0.00 0 95.70 0.00 0.00 0.00 67.50 0.00 0 95.70 0.00 0.00 0.00 70.00 0.00 0 95.70 0.00 0.00 0.00

Page 170

Proposed Flows NOAA10 24-hr D 10-Year-Future Rainfall=6.31" Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 5/26/2026 HydroCAD® 10.20-8a Sampler s/n S05110 © 2025 HydroCAD Software Solutions LLC This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Summary for Pond 5P: Porous Pavement B Inflow Area = 16,284 sf, 94.43% Impervious, Inflow Depth = 5.93" for 10-Year-Future event Inflow = 2.65 cfs @ 12.06 hrs, Volume= 8,041 cf Outflow = 0.15 cfs @ 13.37 hrs, Volume= 8,041 cf, Atten= 94%, Lag= 78.3 min Discarded = 0.07 cfs @ 8.75 hrs, Volume= 6,043 cf Primary = 0.08 cfs @ 13.37 hrs, Volume= 1,997 cf Routed to nonexistent node 6L Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 97.56' @ 13.37 hrs Surf.Area= 5,690 sf Storage= 3,162 cf Plug-Flow detention time= 246.7 min calculated for 8,035 cf (100% of inflow) Center-of-Mass det. time= 246.8 min ( 992.1 - 745.3 ) Volume Invert Avail.Storage Storage Description #1 97.00' 14,225 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 97.00 5,690 0 0 98.00 5,690 5,690 5,690 99.00 5,690 5,690 11,380 99.50 5,690 2,845 14,225 Device Routing Invert Outlet Devices #1 Primary 97.20' 2.5" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #2 Discarded 97.00' 0.500 in/hr Exfiltration over Surface area Discarded OutFlow Max=0.07 cfs @ 8.75 hrs HW=97.03' (Free Discharge) 2=Exfiltration (Exfiltration Controls 0.07 cfs) Primary OutFlow Max=0.08 cfs @ 13.37 hrs HW=97.56' (Free Discharge) 1=Orifice/Grate

Page 170

ed OutFlow Max=0.07 cfs @ 8.75 hrs HW=97.03' (Free Discharge) 2=Exfiltration (Exfiltration Controls 0.07 cfs) Primary OutFlow Max=0.08 cfs @ 13.37 hrs HW=97.56' (Free Discharge) 1=Orifice/Grate (Orifice Controls 0.08 cfs @ 2.42 fps)

Page 171

Proposed Flows NOAA10 24-hr D 10-Year-Future Rainfall=6.31" Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 5/26/2026 HydroCAD® 10.20-8a Sampler s/n S05110 © 2025 HydroCAD Software Solutions LLC This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Pond 5P: Porous Pavement B Hydrograph 2.65 cfs Inflow Outflow Inflow Area=16,284 sf Discarded Primary Peak Elev=97.56' Storage=3,162 cf 2 Flow (cfs) 1 0.15 cfs 0.07 cfs 0.08 cfs 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours)

Page 172

Proposed Flows NOAA10 24-hr D 10-Year-Future Rainfall=6.31" Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 5/26/2026 HydroCAD® 10.20-8a Sampler s/n S05110 © 2025 HydroCAD Software Solutions LLC This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Pond 5P: Porous Pavement B Stage-Discharge Total Discarded Primary 99 Elevation (feet) 98 Orifice/Grate Exfiltration 97 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 0.2 0.22 0.24 0.26 0.28 0.3 Discharge (cfs)

File revisions (1)