JMA02P003 262 270 Main Street Development Stormwater Management Report
72c20944aae1129b177592afa34a50dff15ad477ae008a09c1201da67830e01aIndexed text
The NJDEP certifies the use of the Aqua-Ponic Stormwater Biofiltration System by Komline- AquaShield at a TSS removal rate of 80% when designed, operated and maintained in accordance with the information provided in the Verification Appendix and the following conditions: 1. The maximum treatment flow rate (MTFR) for the manufactured treatment device (MTD) is calculated using the New Jersey Water Quality Design Storm (1.25 inches in 2 hrs) in N.J.A.C. 7:8- 5.5. The MTFR is calculated based on a verified loading rate of 7.0 gpm/ft2 of effective filtration treatment area. The Aqua-Ponic Stormwater Biofiltration System shall be installed using the same configuration reviewed by NJCAT and shall be sized in accordance with the criteria specified in item 6 below. This Aqua-Ponic Stormwater Biofiltration System cannot be used in series with another MTD or a media filter (such as a sand filter) to achieve an enhanced removal rate for total suspended solids (TSS) removal under N.J.A.C. 7:8-5.5. Additional design criteria for MTDs can be found in Chapter 9.5 of the New Jersey Stormwater Best Management Practices (NJ Stormwater BMP) Manual which can be found on-line at https://dep.nj.gov/stormwater/. The maintenance plan for a site using this device shall incorporate, at a minimum, the maintenance requirements for the Aqua-Ponic Stormwater Biofiltration System. A copy of the maintenance plan is attached to this certification. However, it is recommended to review the maintenance website at: https://www.aquashieldinc.com/ap-maintenance.html any changes to the maintenance requirements. For an MTD to be considered “green infrastructure” in accordance with the March 2, 2020 amendments to the Stormwater Management rules at N.J.A.C. 7:8, the MTD must meet the GI definition noted at amended N.J.A.C. 7:8-1.2. Specifically, the MTD shall (1) infiltrate into the subsoil; (2) treat stormwater runoff through filtration by vegetation or soil; and/or (3) store stormwater for reuse. In order for an Aqua-Ponic Stormwater Biofiltration System to meet the definition of GI, the Aqua- Ponic Stormwater Biofiltration System must treat stormwater runoff through filtration by vegetation. To this end, consistent with the vegetative cover requirement for bioretention systems, the minimum vegetative cover in an Aqua-Ponic Stormwater Biofiltration System is 85% in order to qualify as GI
. To this end, consistent with the vegetative cover requirement for bioretention systems, the minimum vegetative cover in an Aqua-Ponic Stormwater Biofiltration System is 85% in order to qualify as GI under the Stormwater Management rules at N.J.A.C. 7:8. The vegetative cover should be determined based on the expected coverage of the proposed plantings when matured. Plant death or damage shall require replanting to maintain this 85% coverage requirement if the system is installed as GI. Sizing Requirements: The example below demonstrates the sizing procedure for the Aqua-Ponic Stormwater Biofiltration System: Example: A 0.25-acre impervious site with a slope of 5% is to be treated to 80% TSS removal using an Aqua-Ponic Stormwater Biofiltration System. The hydraulically most distant point to the inlet of the Aqua-Ponic stormwater treatment unit is 110 feet. The site is located in an area for which the projected 2-year storm rainfall depth was calculated to be 3.84 inches. i)
The selection of the appropriate model of an Aqua-Ponic Stormwater Biofiltration System is based upon both the maximum inflow drainage area and the MTFR. It is necessary to calculate the required model using both methods and to use the largest model determined by the two methods. Inflow Drainage Area Evaluation: The drainage area to the Aqua-Ponic Stormwater Biofiltration System in this example is 0.25 acres. Based upon the information in Table 1 below, one Aqua-Ponic Stormwater Biofiltration System model AP-5 would be able to treat the runoff without exceeding the maximum allowable drainage area. Maximum Treatment Flow Rate (MTFR) Evaluation: The site runoff (Q) was based on the following: CN = 98 (Curve Number for impervious) Dimensionless Unit Hydrograph (DUH) = SCS Standard DUH (peak rate factor of 484) Time of concentration = 0.8 minutes Q=0.77 cfs Given the site runoff is 0.77 cfs and based on Table 1 below, one Aqua-Ponic Stormwater Biofiltration System AP-8 with an MTFR of 0.885 cfs would be required to remove 80% of the TSS from the impervious area without exceeding the MTFR. The MTFR evaluation results will be used since that method results in the highest minimum configuration determined by the two methods. The sizing table corresponding to the available system model is noted below and on the following page. Additional specifications regarding the Aqua-Ponic Stormwater Biofiltration System can be found in the Verification Appendix. Table 1: Aqua-Ponic Stormwater Biofiltration System Models and Associated MTFRs and Maximum Inflow Drainage Areas Effective Aqua- Filtration Maximum Maximum Inflow Ponic Treatment Area Treatment Drainage Model Diameter (EFTA) Flow Rate Area Designation (ft) (sf) (cfs) (acres) AP-2 2.5 4.91 0.077 0.07 AP-3 3.5 9.62 0.150 0.15 AP-4 4.5 15.90 0.248 0.24 AP-5 5.5 23.76 0.371 0.36 AP-6 6.5 33.18 0.518 0.51 AP-7 75 44.18 0.689 0.67
Effective Aqua- Filtration Maximum Maximum Inflow Ponic Treatment Area Treatment Drainage Model Diameter (EFTA) Flow Rate Area Designation (ft) (sf) (cfs) (acres) AP-8 8.5 56.75 0.885 0.87 AP-9 9.5 70.88 1.105 1.08 AP-10 10.5 86.59 1.350 1.32 AP-11 11.5 103.87 1.620 1.59 AP-12 12.5 122.72 1.914 1.87 AP-13 13 132.73 2.070 2.03 Custom - - EFTA x 0.016 EFTA x 0.015 Be advised a detailed maintenance plan is mandatory for any project with a Stormwater BMP subject to the Stormwater Management Rules, N.J.A.C. 7:8. The plan must include all the items identified in the Stormwater Management Rules, N.J.A.C. 7:8-5.8. Such items include, but are not limited to, the list of inspection and maintenance equipment and tools, specific corrective and preventative maintenance tasks, indication of problems in the system, and training of maintenance personnel. Additional information can be found in Chapter 8: Maintenance and Retrofit of Stormwater Management Measures. If you have any questions regarding the above information, please contact Lisa Schaefer of my office at lisa.schaefer@dep.nj.gov. Sincerely, Gabriel Mahon, Chief Bureau of NJPDES Stormwater Permitting Division of Watershed Protection and Restoration New Jersey Department of Environmental Protection Attachment: Maintenance Plan c Richard Magee, NJCAT
INSPECTION & MAINTENANCE MANUAL Aqua-Ponic™ Stormwater Biofiltration System AQUA-PONIC Wé Manufactured by: Komline-AquaShield 2733 Kanasita Drive Suite 111 Chattanooga, TN 37343 (423) 870-8888 | (888) 344-9044 www.aquashieldinc.com www.komline.com April 2026 Komline AquasShield
Komline AquaShield INTRODUCTION As the stormwater industry has matured there has been an ever-increasing movement toward the implementation of Low Impact Development (LID) products and practices as the preferred means to implement stormwater control measures within “green infrastructure” (GI) stormwater management programs. The Aqua-Ponic™ Stormwater Biofiltration System is now offered by Komline-AquaShield to meet the design challenges of LID principles along with enhanced aesthetics in an urban environment. This Inspection & Maintenance (1&M) Manual includes information to better assist stakeholders with understanding the importance of implementing an effective program to ensure long-term functionality of an Aqua-Ponic™ system installation. The following aspects of an Aqua-Ponic™ system are described in this |&M manual: e Aqua-Ponic™ Basics e Mode of Operation e Inspection and Maintenance. AQUA-PONIC™ BASICS Aqua-Ponic™ technology is a modular proprietary, permanent, post-construction biofiltration system designed to remove sediments, nutrients, and associated contaminants from stormwater runoff. A distinguishing feature of the Aqua-Ponic™ is its combination of filtration with the principles of hydroponics- a method of hydroculture for growing plants without soil by instead using mineral nutrient solutions in a water solvent. That is, the Aqua-Ponic™ uses stormwater runoff as a nutrient asset instead of a liability. Terrestrial plants are grown with only their roots exposed to nutrient liquid while being physically supported by a plant stabilization filter medium. The hydroponic design provides a sustainable water supply to the vegetation during those periods of time when hot and/or dry conditions may prevail. The Aqua-Ponic™ system utilizes hardy low-profile perennial vegetation such as native grasses, shrub grasses and/or ornamental flowering plants. A facility can utilize a single type or multiple types of plants to enhance the viewscape. It is important to specify plants that demonstrate viability within the climatic zone of a site installation. MODE of OPERATION The minimum 12-inch plant stabilization media layer within the Aqua-Ponic™ serves three operational roles by providing (1) pollutant filtration, (2) plant stabilization and (3) nutrient uptake. Figure 1 is an illustration of the Aqua-Ponic™ Biofiltration System. Design elements
ves three operational roles by providing (1) pollutant filtration, (2) plant stabilization and (3) nutrient uptake. Figure 1 is an illustration of the Aqua-Ponic™ Biofiltration System. Design elements include a three (3)-inch top layer of pea gravel underlain by the plant stabilization filter bed. Water enters the system as sheet flow and then flows downward under gravity flow conditions through the pea gravel, filter bed and the associated root systems of the vegetation. The pea gravel layer serves to protect the underlying plant stabilization filter bed while dispersing the influent stormwater runoff across the treatment area. The filtered water then percolates further downward into the underlying water sump. A supporting and removeable perforated stainless-steel sheet underlies the filter bed. A post-filtration flow control orifice Page 2 of 6
Komline AquaShield is placed across the outlet pipe opening to facilitate an even distribution of influent runoff across the filter treatment area. Crushed recycled landscaping glass can be used as an alternative to the top pea gravel layer which further enhances colorful viewscape options for the Aqua-Ponic™. Figure 1. Diagram of Aqua-Ponic™ Biofiltration System showing the top pea gravel layer, plant stabilization filter media, wicks, sump, effluent stubout pipe, and observation port. The sump serves as a water reservoir for the vegetation during quiescent periods. A series of wicks are suspended from the base of the plant stabilization bed via rubber grommets (eyelets). The wicks extend downward to near the base of the sump. Using capillary action, water is wicked up to the plant stabilization filter bed which serves to provide a sustainable supply of water and any soluble nutrients and metals not trapped in the filter bed during a runoff event. Treated water in excess of the sump storage volume exits the system via the outlet opening just below the base of the filter bed. Each Aqua-Ponic™ unit is constructed of lightweight and durable Polymer Coated Steel (PCS) to provide long term operational and structural functionality. Aqua-Ponic™ units are shipped with all internal components in place according to the model size. For aesthetic reasons it is the responsibility of others to choose either the pea gravel or any recycled glass landscaping stone for the top bed layer. It is also the responsibility of others to specify, acquire and plant the vegetation. AquaShield™ does not specify the plants for Aqua-Ponic™ systems but can assist where warranted. INSPECTION & MAINTENANCE Maintenance frequency for the Aqua-Ponic™ will ultimately be determined by site-specific pollutant loading conditions. Inspections of plants, top gravel layer and the upper portion of the plant stabilization filter media can be accomplished from the surface without special tools. It is recommended that periodic inspections following installation determine a site-specific maintenance cycle to ensure functionality of the media and the vegetation. Page 3 of 6
Komline AquaShield We recommend that periodic system inspections be performed to determine the pollutant and trash loading characteristics. In general, quarterly inspections should be performed during the first year of operation to better anticipate maintenance frequency in the first year and subsequent years of operation. An Aqua-Ponic™ maintenance event should first determine any obvious signs of degradation, displacement, sediment or trash accumulation, or oil in the upper layers of the unit. The top gravel layer should be completely replaced and can be removed by shoveling or vacuuming. The top several inches of the underlying plant stabilization filter media may be replaced at the same time if warranted. Care should be taken not to damage the plants or disturb rootballs during limited media replacement. Care should also be taken when replacing a plant to avoid disturbing remaining plants. Depending on site conditions, it may be necessary to remove all the media and all the plants and completely replace these components of the system. It is recommended that the wicks be replaced if the system is fully replaced with stabilization media and plants. Sediment can accumulate in the base of the water supply sump over time. After removing the pea gravel layer, the plants and the plant stabilization filter media bed, the perforated metal plate should be removed to access the water supply sump from the surface for the purpose of vacuuming water and any accumulated sediment. The wicking ropes should also be replaced at this time. The perforated metal plate with the new wicking ropes should be set in place prior to installing the plant stabilization filter media on top of the plate. Komline-AquaShield can provide plant stabilization filter media, wicks and any associated grommets. Although unlikely, the supporting stainless-steel plate can also be supplied by Komline-AquaShield. While we recommend that the pea gravel be replaced as warranted, it may be feasible to wash the gravel during a maintenance event. However, in most cases it is more efficient to replace the pea gravel or any landscaping glass to avoid disposal of water that was used to clean either of those materials. All 1&M activities can be performed from the surface without the need for Komline-AquaShield personnel to be present. We recommend that all materials removed during the maintenance
f those materials. All 1&M activities can be performed from the surface without the need for Komline-AquaShield personnel to be present. We recommend that all materials removed during the maintenance process be handled and disposed of in accordance with all applicable federal, state and local guidelines. Depending on the influent pollutant characteristics of the facility drainage area, it may be appropriate to perform Toxicity Characteristics Leaching Procedure (TCLP) analyses on representative samples of the spent filter media to ensure that the handling and disposition of materials complies with any applicable environmental regulations and practices. Attached is a two-page Aqua-Ponic™ I&M Log to document service provider(s), activities and scheduling. Next two pages include |&M Logs Page 4 of 6