Supporting Documentation · Jun 3, 2026
Siad topographical survey from Schmidt5282026
ae89c9c7a7b505c8597b51579cbebc19ebebdfaa6fb3c2a0f62d68e43c7dd485Indexed text
---- ---- ---- ---- ---- 5/26/2026
5/26/2026 DATE ---- ---- ---- ---- ----
---- ---- ---- ---- ---- ----
---- ---- TOWNSHIP COMMENTS 50' REVISION STABILIZED CONSTRUCTION ENTRANCE ----
---- ---- ---- ---- ---- ---- ----
---- ---- ---- ---- ---- STONE SIZE: ASTM C-33, SIZE NO.2 (2 12" TO 1 12") (SEE DETAIL D5/C1.5)
(SEE DETAIL D5/C1.5) No. ---- ---- ---- ---- ----
---- ---- ---- ---- ---- ----
---- 01 SOIL EROSION AND SEDIMENT NEW JERSEY 262-270 MAIN ST SITE REDEVELOPMENT
JORGE MASTROPIETRO ARCHITECTS SITE CIVIL DESIGN CONTROL ESSEX SEDIMENT & EROSION CONTROL NOTES DISTURBED AREAS SHALL BE LIMED AND FERTILIZED PRIOR TO TEMPORARY SEEDING. 1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH ALL SEDIMENT AND EROSION 6. DUST CONTROL TO BE PROVIDED AS REQUIRED USING ACCEPTED INDUSTRY STANDARDS. CONTROL PRACTICES. THE SEDIMENT AND EROSION CONTROL PRACTICES ARE TO BE 7. THE CONTRACTOR SHALL KEEP THE ROADWAYS WITHIN THE PROJECT CLEAR OF SOIL AND INSTALLED PRIOR TO ANY MAJOR SOIL DISTURBANCES, AND MAINTAINED UNTIL PERMANENT DEBRIS AND IS RESPONSIBLE FOR ANY STREET CLEANING NECESSARY, AS A RESULT OF THEIR PROTECTION IS ESTABLISHED. WORK, DURING THE COURSE OF THE PROJECT. 2. TIMELY
File revisions (1)
- Sep 29, 2026
ae89c9c7a7b551,124,221 bytes