R-1 MIN. FRONT YARD (PROSPECT) NO CHANGE MIN. FRONT/SIDE YARD (WOODLAND) 25 FT. 489.4 FT. NO CHANGE YES MIN. SIDE YARD (HOTEL) 10 FT. 352.8 FT. NO CHANGE YES 129.0 FT. (WEST) EXISTING MIN. REAR YARD (ALL OTHERS) 30 FT. NO CHANGE NONCONFORMING 0 FT. (SOUTH) ACCESSORY USE REQUIREMENTS AERIAL MAP SCALE: 1" = 250' GENERAL REQUIREMENTS
SCALE: 1" = 250' GENERAL REQUIREMENTS TAX MAP SCALE: 1" = 250' AERIAL MAP OBTAINED FROM NJGIN IMAGERY WAREHOUSE, 2020. ACCESS.USE SETBACK EXISTING TAX MAP INFORMATION OBTAINED FROM THE TOWNSHIP OF WEST ORANGE TAX MAP SHEET NUMBERS 74, 75, 77, & 78 25-8.1(b) 10 FT. 0 FT. (SOUTH) NO CHANGE FROM "R" DISTRICT NONCONFORMING ZONING INFORMATION OBTAINED FROM TOWNSHIP OF WEST ORANGE ZONING MAP ACCESS.USE FRONT EXISTING 25-8.1(a) 30 FT. 0 FT. NO CHANGE NONCONFORMING YARD SETBACK
YARD SETBACK ACCESSORY BLG. SETBACK LIST OF DRAWINGS 25-8.1(e) 15 FT. 45.0 FT. NO CHANGE YES CHECKED BY: JMP FROM PRINCIPAL BLDG. SHEET NO. NAME PREPARED BY ACCESSORY USE SETBACK 0 FT. EXISTING SP-1 TITLE SHEET PETRY ENGINEERING FROM PROPERTY LINE 25-8.1 5 FT. NO CHANGE NONCONFORMING DRAFTED BY: JAF
(PARKING) SP-2 EXISTING CONDITIONS PLAN PETRY ENGINEERING SP-3 OVERALL LAYOUT PLAN PETRY ENGINEERING SUPPLEMENTAL PROVISIONS SP-4.1 DEMOLITION PLAN - PHASE 1 PETRY ENGINEERING MAXIMUM FENCE HEIGHT SP-4.2 DEMOLITION PLAN - PHASE 2 PETRY ENGINEERING 25-8.4 (c) 6 FT. 6 FT. NO CHANGE YES (SIDE & REAR YARD) SP-5.1 DETAILED LAYOUT PLAN - PHASE 1 PETRY ENGINEERING BUFFER TO
PETRY ENGINEERING BUFFER TO RESIDENTIAL VARIES EXISTING SP-5.2 COMMUNITY GARDEN LAYOUT PLAN PETRY ENGINEERING DISTRICT 25-11.3 (a) 50 FT. NO CHANGE NONCONFORMING 0 FT. TO 60 FT. SP-5.3 DETAILED LAYOUT PLAN - PHASE 2 PETRY ENGINEERING ENGINEERING , LLC PARKING REQUIREMENTS SP-6.1 GRADING & DRAINAGE PLAN - PHASE 1 PETRY ENGINEERING SP-6.2 GRADING & DRAINAGE PLAN - PHASE 2 PETRY ENGINEERING
SP-6.2 GRADING & DRAINAGE PLAN - PHASE 2 PETRY ENGINEERING MIN. NUMBER OF TREES 1 TREE/ 10 SP. SP-6.3 UTILITY PLAN AND ADDITIONAL SIDEWALK GRADING PLAN PETRY ENGINEERING 25-12.1 (o) 1 TREE/ 10 SP. 1 TREE/ 10 SP. YES WITHIN PARKING AREA (47 TREES) SP-7.1 COURTYARD LAYOUT, GRADING & DRAINAGE PLAN PETRY ENGINEERING 9'x18' STD. 9'x18' STD. 9'x18' STD. PARKING STALL SIZE 25-12.1 (p) YES SP-8.1 DRIVEWAY PROFILE PETRY ENGINEERING 8'x15' COMPACT 8'x15' COMPACT 8'x15' COMPACT
5' COMPACT SP-8.2 STORM SEWER NETWORKS PETRY ENGINEERING 347 ON-SITE 362 ON-SITE MIN. REQUIRED PARKING 124 EASEMENT 124 EASEMENT YES SP-8.3 STORM SEWER NETWORKS PETRY ENGINEERING (PER PB 96-08 RESOLUTION) 435 SPACES SP-9.1 LIGHTING PLAN - PHASE 1 PETRY ENGINEERING (471 TOTAL) (486 TOTAL)
(471 TOTAL) (486 TOTAL) SP-9.2 LIGHTING PLAN - PHASE 2 PETRY ENGINEERING 24 FT. TWO WAY 24 FT. 24 FT. MIN. 2 WAY DRIVEWAY WIDTH 25-12.1 (h) YES SP-9.3 LIGHTING DETAILS PETRY ENGINEERING 14 FT. ONE WAY 15 FT. 15 FT. SP-10.1 SOIL EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 PETRY ENGINEERING PROPOSED PARKING SPACES: ELECTRIC VEHICLE PARKING REQUIREMENT: (2) SP-10.1A SOIL EROSION AND SEDIMENT
(2) SP-10.1A SOIL EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 PETRY ENGINEERING 4% OF TOTAL PARKING SP-10.2 SOIL EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 PETRY ENGINEERING LOT A (EMPLOYEE LOT): 81 SPACES AND 5% OF EV MUST BE ADA ACCESSIBLE SP-10.3 SESC DETAILS PETRY ENGINEERING LOT B (VALET LOT): 117 SPACES SP-11.1 GENERAL NOTES PETRY ENGINEERING LOT C (PUBLIC PARKING): 152 SPACES =269 x 0.04 = 11 EV SPACES REQUIRED LOT D (CROSS-ACCESS EASEMENT): 124 SPACES SP-11.2 CONSTRUCTION DETAILS PETRY ENGINEERING
SP-11.2 CONSTRUCTION DETAILS PETRY ENGINEERING J. MICHAEL PETRY-PE,PP,RA EV CREDIT : 12 SPACES 12 EV SPACES (2 ADA) PROPOSED SP-11.3 CONSTRUCTION DETAILS PETRY ENGINEERING NJ PROFESSIONAL ENGINEER LIC. No. 36662 SP-11.4 CONSTRUCTION DETAILS PETRY ENGINEERING DATE: 01/31/2025 TOTAL: 486 SPACES (2) TM-1 TURNING MOVEMENTS PETRY ENGINEERING ADA PARKING CALCULATION: