Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 3, 2026

JMA02P00301 262 270 MAIN STREET

Preserved file SHA-256d7c4d01f73b7886c3ee3ab9014a1ed38e8d85378c42ecba1f33c333b9396bb64

Indexed text · page 9

Show all pages
Page 9

TOPSOIL NOT TO BE USED FOR FINAL GRADING SHALL BE REMOVED FROM THE SITE IMMEDIATELY AND PLACED IN A STABILIZED STOCKPILE OR FILL AREA. ALL TOPSOIL REQUIRED FOR FINAL GRADING AND STORED ON SITE SHALL BE LIMED, FERTILIZED, TEMPORARILY SEEDED AND MULCHED WITHIN 21 DAYS. 0' 5' 10' 20' 30' 40' 50' 60' 5. AND DISTURBED AREAS THAT WILL BE LEFT EXPOSED MORE THAN 21 DAYS AND NOT SUBJECT DRAWN BY : DESIGN BY : CHECKED BY : SCALE : TO CONSTRUCTION TRAFFIC, SHALL IMMEDIATELY RECEIVE TEMPORARY SEEDING. MULCH HP HP JC AS NOTED SHALL BE USED IF THE SEASON PREVENTS THE ESTABLISHMENT OF A TEMPORARY COVER. SHEET #: 1 SEDIMENT CONTROL PLAN SCALE: 1/16" = 1'-0" DATE :

Page 9

05/15/2025 C1.09 BINDING ORDER: JOB No. : C1.09 SCALE: 1/16"=1'-0" JMA02P003.01 09 of 15

File revisions (1)